← Back
Multi-story retail building (2+)
1915 3 AVENUE
MANHATTAN · BIN 1052429
💬 Discuss this project
1930Year Built
2Stories
K2Building Class
R9Zoning
38,302 sfGross Floor Area
2Units
LL97 Covered14 Open Violations ▸
Multi-story retail building (2+) · Owner of record: ROSS AND ROSS LLC · 16,139 sf lot · 2.37 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 14p · 3 filings · 20 docs
Cellar3p · 3 filings · 20 docs
1 job · most recent 08/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026——Heating and Air Conditioning Systems
Heat / Cool
Carrier 48GEEU24B3M5-3W4P0 20 tons · Rooftop Unit ×2
1 job · most recent 01/05/2022
Water/Sanitary
FiledStatusContractorScope
01/05/2022——Water/Sanitary
1 job · most recent 05/17/2021
FiledStatusContractorScope
05/17/2021CompleteALL WAYS ELECTRIC CORP.W—
1 job · most recent 01/24/2022
FiledStatusContractorScope
01/24/2022——1 scope_items
Building Lifecycle
All (96)Filed (8)Permit Issued (4)Signed Off (3)Violation (60)Inspection (5)Objection (4)Special Inspection (12)
08/27/2026
Filed — Alteration
JOB FILED TO DEMO/REPLACE EXISTING ROOFTOP UNIT AS PER PLAN. CURB AND ASSOCOATED DUCTWORK TO REMAIN AND RECONNECTION TO NEW ROOF TOP UNIT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01443267-I1
08/10/2026
Special inspection requirement — Final
08/10/2026
Special inspection requirement — Mechanical Systems
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/02/2025
Violation issued (ECB, open)
Boilers
01/02/2025
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2022
Signed off — Alteration
PLUMBING AND SPRINKLER WORK FOR AN INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00580691-I1
03/28/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/22/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2022
Special inspection requirement — Sprinkler Systems
John Nucatola
03/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Nucatola
03/18/2022
Filed — Alteration
PLUMBING AND SPRINKLER WORK FOR AN INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00580691-P1
02/11/2022
Special inspection requirement — Sprinkler Systems
John Nucatola
02/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Nucatola
01/24/2022
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00642002-P1
01/24/2022
Special inspection requirement — Lighting controls
01/24/2022
Special inspection requirement — Interior lighting power
01/24/2022
Special inspection requirement — Luminous Exit Path Markings
01/20/2022
Objection resolved — Addressed
01/19/2022
Objection resolved — Addressed
01/14/2022
Objection raised — Scope
01/14/2022
Objection raised — Admin
01/11/2022
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00642002-I1
01/05/2022
Filed — Alteration
PLUMBING WORK FOR AN INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00644234-I1
01/04/2022
Signed off — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00580639-I1
01/04/2022
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00580192-I1
12/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2021
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/04/2021
Permit issued — General Construction
M00580192-I1-GC
10/29/2021
Permit issued — Plumbing
M00580691-I1-EW-SP
10/29/2021
Permit issued — Plumbing
M00580691-I1-PL
10/29/2021
Permit issued — Mechanical Systems
M00580639-I1-MS
10/27/2021
Filed — Alteration
PLUMBING AND SPRINKLER WORK FOR AN INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00580691-I1
10/27/2021
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00580639-I1
10/27/2021
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00580192-I1
08/19/2021
Special inspection requirement — Energy Code Compliance Inspections
John Nucatola
08/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Nucatola
08/19/2021
Special inspection requirement — Final
John Nucatola
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2020
Violation issued (ECB, closed)
Elevators
12/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/02/2019
Violation issued (ECB, closed)
Elevators
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSS AND RODD LLC103/22/2026
KRESCO103/22/2026
PONCE DE LEON BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POLARWORX INC.108/27/2026
LORING CONSULTING ENGINEERS, INC.403/18/2022
STONEHILL & TAYLOR ARCHITECTS, P.C.201/24/2022
STEVEN OAKLEY110/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELATED COMPANIES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHILIP GOEHRINGElectrical403/21/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor307/08/2026
WILLIAM HERMANElectrical203/21/2026
HERMAN WILLIAMElectrical203/21/2026
NEPTUNE MECHANICAL INCPlumbing107/08/2026
MILICIA FRANKElectrical103/21/2026
NEPTUNE MECHANICAL INCFire Protection107/08/2026
FRANK MILICIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNS INSPECTION SERVICES7566403/18/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP11/04/2021
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC10/29/2021
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC10/29/2021
DOB NOWMechanical SystemsSigned-offNORTHEAST SPECIALIST GROUP10/29/2021
BISOTISSUEDN/A11/13/2014
BIS—ISSUEDA.M.A HOLDINGS INC08/01/2013
BIS—ISSUEDA.M.A HOLDINGS INC08/01/2013
BIS—ISSUEDA.M.A HOLDINGS INC08/01/2013
BISOTISSUEDSIGN GROUP INC08/01/2013
BISOTISSUEDSIGN GROUP INC07/30/2013
BIS—ISSUEDA.M.A HOLDINGS INC07/30/2013
BIS—ISSUEDBALLY TOTAL FITNESS CORP05/25/2010
BIS—ISSUEDMC GOWAN BUILDERS INC02/06/2009
BIS—ISSUEDMC GOWAN BUILDERS INC03/04/2008
BISBLISSUEDBALLY TOTAL FITNESS07/25/2007
BISOTISSUEDPAUL SIGNS INC03/30/2005
BISOTISSUEDPAUL SIGNS INC03/30/2005
BISOTISSUEDMC GOWAN BUILDERS INC12/14/2004
BISSPISSUEDACCURATE MECHANICAL INC10/21/2004
BIS—ISSUEDPAUL SIGNS, INC07/21/2004
BIS—ISSUEDPAUL SIGNS, INC07/21/2004
BIS—ISSUEDPAUL SIGNS, INC07/21/2004
BIS—ISSUEDPAUL SIGNS, INC07/21/2004
BIS—ISSUEDPAUL SIGNS, INC07/21/2004
BISPLISSUEDACCURATE MECHANICAL INC07/06/2004
BISMHISSUEDMC GOWAN BUILDERS INC06/29/2004
BISOTISSUEDMC GOWAN BUILDERS INC05/13/2004
BISOTISSUEDRENEWALS ART DEVE. CORP.09/16/2003
BISEQISSUEDRENEWALS ARTS DEVEL CORP09/16/2003
BISSPISSUEDPINNACLE PLBG & HTG CORP09/16/2003
BISMHISSUEDAA DIVERSIFIED HVAC & R INC06/16/2003
BISEQISSUEDHARRIS COMPANY IND INC06/03/2003
BISPLISSUEDDUO PLUMBING & HTG CORP.02/13/2003
BISPLISSUEDDUO PLUMBING & HTG CORP.02/06/2003
BISEQISSUEDHARRIS COMPANY IND INC01/31/2003
BIS—ISSUEDHARRIS COMPANY IND INC01/31/2003
BIS—ISSUEDINTERBORO SIGN & MTN12/02/2002
BIS—ISSUEDINTERBORO SIGN & MTN.12/02/2002
BIS—ISSUEDINTERBORO SIGN & MTN.12/02/2002
BIS—ISSUEDINTERBORO SIGN AND MTN12/02/2002
+ 8 more permits on file
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2021Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/29/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/10/2026Final—progress
08/10/2026Mechanical Systems—special
03/21/2022Sprinkler SystemsJohn Nucatolaspecial
03/21/2022Fire-Resistant Penetrations and JointsJohn Nucatolaspecial
02/11/2022Sprinkler SystemsJohn Nucatolaspecial
02/11/2022Fire-Resistant Penetrations and JointsJohn Nucatolaspecial
01/24/2022Lighting controls—energy_progress
01/24/2022Interior lighting power—energy_progress
01/24/2022Luminous Exit Path Markings—special
08/19/2021Energy Code Compliance InspectionsJohn Nucatolaprogress
08/19/2021Fire-Resistant Penetrations and JointsJohn Nucatolaspecial
08/19/2021FinalJohn Nucatolaprogress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/13/2026M01443267-I1Request digital key ↗
09/03/2026M00580639-I1Request digital key ↗
09/03/2026M00580192-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
06/26/2017123025252Open ↗
06/16/2017123025252Open ↗
04/12/2017123025252Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY3
03/05/2018120008062Open ↗
10/27/2009120008062Open ↗
05/26/2009120008062Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
02/26/2013120008062Open ↗
▸BISWORK PERMIT APPLICATION1
11/18/2014121985539Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/13/2026M01443267-I1Open ↗
09/03/2026M00580192-I1Open ↗
09/03/2026M00644234-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00580192-I1Open ↗
08/29/2026M00580691-I1Open ↗
08/29/2026M00580691-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/23/2017123025252Open ↗
05/26/2009120008062Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00580192-I1Open ↗
09/01/2026M00580192-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/18/2017123025252Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/12/2017123025252Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/26/2017123025252Open ↗
06/16/2017123025252Open ↗
04/12/2017123025252Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/30/2014121985539Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/13/2026M01443267-I1Open ↗
09/03/2026M00580192-I1Open ↗
09/03/2026M00644234-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed6
09/03/2026M00580192-I1Open ↗
09/03/2026M00644234-I1Open ↗
09/02/2026M00580691-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
09/03/2026M00580192-I1Open ↗
09/03/2026M00644234-I1Open ↗
09/02/2026M00580691-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/26/2009120008062Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
05/26/2009120008062Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/05/2018120008062Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/12/2017123025252Open ↗
04/24/2014121985539Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
06/12/2017123025252Open ↗
11/05/2013120008062Open ↗
03/26/2013120008062Open ↗
▸BISEFILING COVER SHEET2
04/12/2017123025252Open ↗
04/24/2014121985539Open ↗
▸BISBOROUGH INTAKE FORM1
03/05/2018120008062Open ↗