DOB07/31/2026ATOI OBSERVED AT EXPO # 3 AN UNPERMITTED UNDOCUMENTED ONE STORY HORIZONTAL AND VERTICAL STRUCTURE A STUCCO FINISH WITH THREE WINDOWS BUILT AT THE SECOND STORY LEVEL ATTACHED TO THE EXISTING BUILDING
ECB07/31/2026WORK WITHOUT PERMIT PSWO ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY STRUCTURAL ECT. ATOI OBSERVED AT EXPO # 3 AN UNPERMITTED UNDOCUMENTED ONE STORY HORIZONTAL AND VERTICAL STRUCTURE WITH A STUCCO FINISH WITH$6K due
Two family brick · 2,017 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.