ECB01/09/2026WORK WITHOUT PERMIT; NOTED AT REAR OF PREMISES (EXPOSURE#3) FULLY COMPLETED REAR EXTENSION APPROXIMATELY 20FT LENGTH AND 20FT WIDTH ATTACHED TO PREMISES COMPLETED WITH BRICK, STONE, CEMENT AND COVERED WITH ROOFNothing owed — awaiting certificate of correction
ECB06/17/2025WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION ,OBSERVED AT EXPOSURE1 AN ILLEGAL CAR PORT WAS ERECTED WHICH IS APPROXIMATELY 15 FT WIDE ,20 FT LONG ,AND 7 FT IN HEIGHT ,THERE IS NO JOB FILING IN DEPT RECORNothing owed — awaiting certificate of correction
ECB06/17/2025WORK WITHOUT A PERMIT . NOTED : AT TIME OF INSPECTION ,OBSERVED AT EXPOSURE 1 THE CURB WAS ILLEGALLY CUT TO GET ACCESS TO ILLEGAL PARKING PAD ., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITIONNothing owed — awaiting certificate of correction
Church, synagogue, chapel · Owner of record: MAJORITY BAPTIST CHURCH · 8,991 sf lot · 1.56 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.