DOB08/01/2001WORK W/O PERMIT. NOTED: DEMO OF 2ND FLOOR IN PROGRESS. DOB RECORDS INDICATE NO ISSUED PERMITS. -STOP ALL WORK- REMEDY: OBTAIN PERMIT. STOP ALL WORK. NOTIFY THE DEPARTMENT ONCE PERMIT IS OBTAINED BRFORE RETURNING TO WORK AT 718-802-3685
DOB08/01/2001FAILURE TO SAFELY REMOVE DEBRIS. HAZARDOUS
DOB08/01/2001FAILURE TO CARRY OUT DEMO IN A SAFE MANNER. -HAZARDOUS-
DOB08/01/2001FAILURE TO POST CONTRACTOR'S SIGN
DOB08/01/2001NO JOB SITE FENCE. HAZARDOUS
DOB06/05/2001V-DOB VIOLATION - ACTIVE
DOB01/31/2001V-DOB VIOLATION - ACTIVE
DOB01/26/2001HAZARDOUS
ECB08/08/2001NO JOB SITE FENCE. UPON INSPECTION AT ABOVE PROPERTY ALT OF BUILDING WAS COMMENCED, BUILDING WAS VACAINT (ROOF OFF, SECOND FLOOR EXTEROIR WALLS) AND NO FENCE AROUND SITENothing owed — awaiting certificate of correction
ECB08/03/2001WORK W/OUT A PERMIT UPON INSPECTION AT ABOVE PROPERTYNothing owed — awaiting certificate of correction
ECB08/01/2001FAILURE TO POST CONTRACTORS SIGN UPON INSPECTION OF ABOVE ADDRESS DEMO /CONSTRUCTION WORK WAS IN PROGRESS & NO SIGN WAS POSTED REMEDY PROVIDE CONTRACTORS SIGNNothing owed — awaiting certificate of correction
ECB08/01/2001NO JOB SITE FENCE UPON INSPECTION OF ABOVE ADDRESS DEMO / CONSTRUCTION WAS IN PROGRESS & NO FENCE WAS ERECTED REMEDY STOP ALL WORK IMMEDIATELY PROVIDE 8'HIGH SOLID FENCE AS PER CODENothing owed — awaiting certificate of correction
ECB08/01/2001WORK WITHOUT A PERMIT WORK NOTED DEMOLITION OF 2ND FL IN PROGRESS & DEPT OF BUILDING RECORDS INDICATE NO PERMITS WERE ISSUED STOP ALL WORK REMEDY OBTAIN PERMIT NOTIFY DEPT WHEN PERMIT IS OBTAINED BEFORE RETURNNothing owed — awaiting certificate of correction
ECB08/01/2001FAILURE TO SAFELY AND PROPERLY REMOVE MATERIAL DEBRIS FROM CONSTRUCTION SITE THROW BRICKS & OTHER MATERIALS FROM ROOF INTO DUMPSTER AT SIDE OF HOUSE REMEDY SAFELY & PROPERLY REMOVE DEBRIS FROM SITENothing owed — awaiting certificate of correction
ECB08/01/2001FAILURE TO CARRY OUT DEMOLITION IN A SAFE AND PROPER MANNER THROWING DEBRIS FROM ROOF INTO DUMPSTER REMEDY CARRY OUT DEMOLITION ACCORDING TO CODE STANDARDSNothing owed — awaiting certificate of correction
ECB01/26/2001FAILURE TO MAINTAIN DEFECT IS: 2ND STORY WEST MASORY WALL IS BUILDING AND IS APPROX: 8 TO 10 INCHES OUT OF PLUMB TO ENTIRE ROOF IS SAGGING AND IN IMMINENT DANGER OF COLLAGSE. LOOSE AND UNLICSED PLASTER AT ALLNothing owed — awaiting certificate of correction