← Back
Primarily 1 family with 1 store or office
1918 AVENUE M
BROOKLYN · BIN 3181118
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R7AZoning
2,584 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 1918 AVE M LLC · 1,710 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar3p · 2 filings · 20 docs
1 job · most recent 03/30/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026Signed-offOMNI BUILD INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,174 BTU · Condensing Unit ×6
RXTQ48TBVJUB 48,113 BTU · Vrf Outdoor ×4
Ventilation
N/A N/A 50 CFM ×4
1 job · most recent 03/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/30/2026Signed-offNICE PLUMBING CORPGas, Water/Sanitary
2 jobs · most recent 01/07/2026
General Wiring
FiledStatusContractorScope
01/07/2026CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
02/04/2025CompleteFOREST BROOK ELEC'L CONTR4 meters, 4 new_meters
1 job · most recent 03/30/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/30/2026Signed-offNICE PLUMBING CORPSteel, Concrete, Masonry
1 job · most recent 03/30/2026
Fence
FiledStatusContractorScope
03/30/2026Signed-offNICE PLUMBING CORPFence
Building Lifecycle
All (72)Filed (8)Permit Issued (5)Signed Off (3)Violation (1)Inspection (5)Objection (26)Special Inspection (24)
04/29/2026
Signed off — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-S1
04/29/2026
Signed off — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-S2
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
03/31/2026
Special inspection requirement — Mechanical Systems
Alexander Sheyman
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
03/31/2026
Special inspection requirement — Final
Alexander Sheyman
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
03/31/2026
Special inspection requirement — Maintenance information
Alexander Sheyman
03/31/2026
Special inspection requirement — Shutoff dampers
Alexander Sheyman
03/30/2026
Signed off — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-I1
03/30/2026
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-P4
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
03/23/2026
Special inspection requirement — Shutoff dampers
Alexander Sheyman
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
03/23/2026
Special inspection requirement — Maintenance information
Alexander Sheyman
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
03/23/2026
Special inspection requirement — Mechanical Systems
Alexander Sheyman
03/23/2026
Special inspection requirement — Final
Alexander Sheyman
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
05/18/2025
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-P3
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
12/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2024
Permit issued — Plumbing
B00831518-S1-PL
12/20/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/08/2024
Permit issued — Mechanical Systems
B00831518-S2-MS
08/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2024
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-P2
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
06/26/2024
Objection raised — Accessibility
06/26/2024
Objection raised — Accessibility
06/26/2024
Objection raised — Zoning
06/26/2024
Objection raised — Zoning
06/24/2024
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-P1
10/26/2023
Permit issued — Plumbing
B00831518-S1-PL
10/23/2023
Permit issued — Mechanical Systems
B00831518-S2-MS
09/26/2023
Objection resolved — Addressed
09/19/2023
Objection resolved — Addressed
09/15/2023
Objection raised — Other
09/14/2023
Objection raised — Admin
09/11/2023
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-S1
09/11/2023
Filed — Alteration
RENOVATION OF EXISTING MIXED- USE BUILDING. HORIZONTAL ERECTION OF DECK IN THE REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION
B00831518-S2
07/21/2023
Permit issued — General Construction
B00831518-I1-GC
05/04/2023
Objection raised — Other
05/04/2023
Objection raised — Energy
05/04/2023
Objection raised — Other
05/04/2023
Objection raised — Scope
05/02/2023
Filed — Alteration
B00867480-I1
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1918 AVE M2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2022$1.3M—Private party → 1918 AVE M LLC$513/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECC SOLUTIONS503/30/2026
DOME ARCHIETCTURE, DESIGN & ENG306/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELIABLE EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OMNI BUILD INCGeneral Contractor407/08/2026
NICE PLUMBING CORPPlumbing207/08/2026
FOREST BROOK ELEC'L CONTRElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL1098503/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNICE PLUMBING CORP12/20/2024
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC11/08/2024
DOB NOWPlumbingSigned-offNICE PLUMBING CORP10/26/2023
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC10/23/2023
DOB NOWGeneral ConstructionSigned-offOMNI BUILD INC07/21/2023
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/31/2026HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
03/31/2026HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
03/31/2026Mechanical SystemsAlexander Sheymanspecial
03/31/2026Energy Code Compliance InspectionsAlexander Sheymanprogress
03/31/2026FinalAlexander Sheymanprogress
03/31/2026HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
03/31/2026Maintenance informationAlexander Sheymanenergy_progress
03/31/2026Shutoff dampersAlexander Sheymanenergy_progress
03/23/2026Energy Code Compliance InspectionsAlexander Sheymanprogress
03/23/2026HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
03/23/2026Shutoff dampersAlexander Sheymanenergy_progress
03/23/2026HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
03/23/2026HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
03/23/2026Maintenance informationAlexander Sheymanenergy_progress
03/23/2026Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
03/23/2026Mechanical SystemsAlexander Sheymanspecial
03/23/2026FinalAlexander Sheymanprogress
05/27/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
05/27/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
04/28/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
04/28/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
07/18/2024Energy Code Compliance InspectionsAlexander Sheymanprogress
07/18/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00867480-I1Request digital key ↗
08/24/2026B00831518-I1Request digital key ↗
08/24/2026B00831518-S4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00831518-P1Open ↗
08/13/2026B00831518-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00831518-I1Open ↗
08/13/2026B00831518-P1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00867480-I1Open ↗
08/24/2026B00831518-P2Open ↗
08/24/2026B00831518-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B00831518-P3Open ↗
08/28/2026B00831518-P4Open ↗
08/28/2026B00831518-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026B00831518-P3Open ↗
08/28/2026B00831518-P4Open ↗
08/28/2026B00831518-S2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00831518-I1Open ↗
08/13/2026B00831518-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B00831518-P2Open ↗
08/24/2026B00831518-S3Open ↗
08/24/2026B00831518-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026B00831518-I1Open ↗
08/13/2026B00831518-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00831518-I1Open ↗
08/13/2026B00831518-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00831518-I1Open ↗
08/13/2026B00831518-P1Open ↗