← Back
BuildNYC
Two family frame
1919 ROCKAWAY PARKWAY
BROOKLYN · Canarsie · BIN 3233720
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R4-1Zoning
1,968 sfGross Floor Area
2Units
9 Active Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · 2,040 sf lot · 0.96 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architect Associates201/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectural Design Solutions203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963201/16/2026
Building Lifecycle
02/16/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Admin
02/11/2026
Objection raised — Other
01/16/2026
Filed — Alteration
APPLICATION TO RESTORE TO PRIOR LEGAL CONDITION. REMOVE FULL-HEIGHTPARTITIONS AND ILLEGALLY CREATED APARTMENT INCLUDING TWO BED ROOMS,RESIDENTIAL KITCHEN W/ SINK, GAS STOVE & A 3 PC BATHROOM AT THE CELLAR.ALSO RENOVATE EXISTING CELLAR AS PER PLAN TO COMPL
B01339964-I1
01/16/2026
Filed — Alteration
APPLICATION TO RESTORE TO PRIOR LEGAL CONDITION. REMOVE FULL-HEIGHTPARTITIONS AND ILLEGALLY CREATED APARTMENT INCLUDING TWO BED ROOMS,RESIDENTIAL KITCHEN W/ SINK, GAS STOVE & A 3 PC BATHROOM AT THE CELLAR.ALSO RENOVATE EXISTING CELLAR AS PER PLAN TO COMPL
B01339964-S1
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 01/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/16/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/25/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account