← Back
BuildNYC
Two stories - detached, small or mid-size
192-21 UNDERHILL AVENUE
QUEENS · BIN 4128269
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,220 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,400 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed photovoltaic power system4p · 1 filing · 13 docs
BasementProposed photovoltaic power system1p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2021$1.2M—Private party → Private party$552/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering206/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841206/11/2025
Building Lifecycle
07/24/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01236950-I1
06/12/2025
Permit issued — Solar
Q01236950-I1-SL
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
06/12/2025
Special inspection requirement — Final
ROBERT MASONE
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS06/12/2025
BISPLISSUEDDo Rite Mechanical11/21/2008
BISPLISSUEDDo Rite Mechanical10/10/2007
BIS—ISSUEDPeters Construction Group09/07/2007
1 project · most recent 06/05/2025
FiledStatusContractorScope
06/05/2025CompleteNY Solar Electrical—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/12/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/12/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/12/2025FinalROBERT MASONEprogress
06/12/2025Energy Code Compliance InspectionsROBERT MASONEprogress
06/12/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
06/11/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/11/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/11/2025Energy Code Compliance InspectionsROBERT MASONEprogress
06/11/2025FinalROBERT MASONEprogress
06/11/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account