← Back
Two stories - detached, small or mid-size
192 PETER AVENUE
STATEN ISLAND · Oakwood-Richmondtown · BIN 5058588
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3XZoning
2,720 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,068 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/08/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
10/17/2024
Permit issued — Solar
S01101074-I1-SL
10/08/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01101074-I1
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/23/2024
Special inspection requirement — Final
Walid Abdulla
08/23/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC10/17/2024
1 project · most recent 10/08/2024
General Wiring
FiledStatusContractorScope
10/08/2024Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 10/08/2024
FiledStatusContractorScope
10/08/2024Permit IssuedSUNRUN INSTALLATION SVC24 panels, 9.48 kw, 507.3 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/23/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/23/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/23/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/23/2024FinalWalid Abdullaprogress
08/23/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01101074-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01101074-I1Open ↗
09/01/2026S01101074-I1Open ↗
09/01/2026S01101074-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01101074-I1Open ↗
09/01/2026S01101074-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01101074-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01101074-I1Open ↗