1920Year Built
2.75Stories
B1Building Class
R7-1Zoning
3,328 sfGross Floor Area
2Units
Rent Stabilized22 Open Violations ▸FDNY Report ↗
Two family brick · 3,346 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof5p · 1 filing · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 251p · 1 filing · 20 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 20 docs
Floor 74p · 1 filing · 20 docs
Floor 63p · 1 filing · 20 docs
Floor 53p · 1 filing · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEAD IT BUILDERS509/15/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2026$1.0M—Private party → 1923 HARRISON AVE LLC$300/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEAD IT BUILDERS, LLCGeneral Contractor207/14/2026
N TECH DESIGN OF AMERICAGeneral Contractor109/07/2026
Building Lifecycle
All (87)Filed (10)Permit Issued (3)Violation (28)Objection (16)Special Inspection (30)
09/03/2026
Permit issued — Full Demolition
X01367961-I1-FD
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Resolved
07/13/2026
Permit issued — Protection and Mechanical Methods
X01426816-I1-PMM
07/10/2026
Filed — Alteration
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01426816-I1
07/06/2026
Permit issued — Construction Fence
X01398941-I1-FN
06/25/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Other
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Other
05/19/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/13/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S7
05/13/2026
Objection raised — Other
05/13/2026
Objection raised — Other
05/13/2026
Special inspection requirement — Sprinkler Systems
05/13/2026
Special inspection requirement — Post-installed Anchors
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S6
05/12/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S4
05/12/2026
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01398941-I1
05/11/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S3
05/11/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S2
05/11/2026
Special inspection requirement — Subgrade Inspections
05/11/2026
Special inspection requirement — Final
05/11/2026
Special inspection requirement — Footing and Foundation
05/11/2026
Special inspection requirement — Final
05/11/2026
Special inspection requirement — Post-installed anchors in masonry
05/11/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/11/2026
Special inspection requirement — Masonry
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/11/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/08/2026
Special inspection requirement — Maintenance information
05/08/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2026
Special inspection requirement — Post-installed Anchors
05/07/2026
Special inspection requirement — Mechanical Systems
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
05/07/2026
Special inspection requirement — Final
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/07/2026
Special inspection requirement — Maintenance information
05/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/07/2026
Special inspection requirement — Shutoff dampers
04/30/2026
Violation issued (HPD, open)
A
04/14/2026
Objection resolved — Resolved
03/31/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-S1
03/30/2026
Filed — Full Demolition
X01367961-I1
01/24/2026
Objection raised — Admin
12/19/2025
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01336180-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA09/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedLEAD IT BUILDERS, LLC07/13/2026
DOB NOWConstruction FencePermit IssuedLEAD IT BUILDERS, LLC07/06/2026
1 project · most recent 05/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026——Heating and Air Conditioning Systems
Heat / Cool
Amana PTH073J35 7,000 BTU · Ptac ×20
PTH123J35 11,600 BTU · Ptac ×19
PTH153J35 14,400 BTU · Ptac ×13
PTH093J35 9,000 BTU · Ptac ×8
1 project · most recent 05/13/2026
Sprinkler System
FiledStatusContractorScope
05/13/2026——Sprinkler System
1 project · most recent 05/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/13/2026——Storm, Water/Sanitary
2 projects · most recent 09/02/2026
General Wiring
FiledStatusContractorScope
09/02/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
06/02/2026Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
1 project · most recent 05/12/2026
Fence
FiledStatusContractorScope
05/12/2026Permit IssuedLEAD IT BUILDERS, LLCFence
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
05/13/2026Sprinkler Systems—special
05/13/2026Post-installed Anchors—special
05/13/2026Fire-Resistant Penetrations and Joints—special
05/11/2026Subgrade Inspections—special
05/11/2026Final—progress
05/11/2026Footing and Foundation—progress
05/11/2026Final—progress
05/11/2026Post-installed anchors in masonry—special
05/11/2026Construction Operations Influencing Adjacent Structures—special
05/11/2026Concrete - Cast-In-Place—special
05/11/2026Masonry—special
05/11/2026Concrete - Cast-In-Place—special
05/11/2026Construction Operations Influencing Adjacent Structures—special
05/11/2026Subsurface Investigations (Borings/Test Pits)—special
05/08/2026HVAC-R and service water heating equipment—energy_progress
05/08/2026Maintenance information—energy_progress
05/08/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/08/2026Fire-Resistant Penetrations and Joints—special
05/08/2026HVAC-R and service water piping design and insulation—energy_progress
05/08/2026HVAC-R and service water heating system controls—energy_progress
05/07/2026HVAC-R and service water heating equipment—energy_progress
05/07/2026Fire-Resistant Penetrations and Joints—special
05/07/2026Post-installed Anchors—special
05/07/2026Mechanical Systems—special
05/07/2026Energy Code Compliance Inspections—progress
Latest 25 of 49.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026X01367961-I1Request digital key ↗
08/16/2026X01336180-I1Request digital key ↗
08/16/2026X01336180-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records15
▸DOB NOWRestrictive Declaration/Easement 26
08/16/2026X01336180-I1Open ↗
08/15/2026X01336180-S4Open ↗
08/15/2026X01336180-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 16
08/16/2026X01336180-I1Open ↗
08/15/2026X01336180-S4Open ↗
08/15/2026X01336180-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01336180-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026X01336180-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X01336180-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026X01336180-S2Open ↗
08/16/2026X01336180-I1Open ↗
08/16/2026X01336180-S1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X01336180-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/16/2026X01336180-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01336180-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/14/2026X01336180-S6Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/17/2026X01367961-I1Open ↗
08/16/2026X01336180-I1Open ↗
▸DOB NOWStructure Photographs1
08/17/2026X01367961-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026X01336180-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026X01336180-I1Open ↗