← Back
Miscellaneous educational facility
Eastchester Residence Halls
1925 EASTCHESTER ROAD · BIN 2127321
💬 Discuss this project
1972Year Built
28Stories
W9Building Class
R6Zoning
959,880 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized54 Open Violations 39 unresolved · 15 paperwork only ▸FISP: SWARMPFDNY Report ↗
Miscellaneous educational facility · Owner of record: ALBERT EINSTEIN COLLEGE OF MEDICINE · 240,008 sf lot · 4 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar3p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5D ARCHITECTURAL AND ENGINEERING,407/08/2026
ALBERT EINSTEN COLLEGE OF MEDICINE607/08/2026
MONTEFIORE MEDICAL CENTER304/09/2026
YESHIVA UNIVERSITY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
5D ARCHITECTURE ENGINEERING203/21/2026
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANNON MECHANICAL INCGeneral Contractor707/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
WAYNE HAMILTONElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
LUXAIRE HVAC SERVICES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423101/13/2022
GOLDMAN COPELAND ASSOCIAT2826201/13/2022
5D ARCH. & ENG., PLLC2781110/26/2020
Building Lifecycle
All (96)Filed (4)Permit Issued (5)Signed Off (4)Facade (FISP) (16)Violation (60)Special Inspection (7)
04/30/2026
Violation issued (HPD, open)
A
02/18/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, open)
A
02/06/2026
Violation issued (HPD, open)
A
02/06/2026
Violation issued (HPD, open)
A
02/06/2026
Violation issued (HPD, open)
A
02/06/2026
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
I
11/12/2025
Violation issued (FDNY_NOV, closed)
11/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01159835-I1
07/29/2025
Cycle 10 facade report submitted
07/29/2025
Cycle 10 facade report signed — SWARMP
07/09/2025
Cycle 9 facade report signed — SWARMP
06/30/2025
Cycle 10 facade inspection completed
06/30/2025
Cycle 9 facade inspection completed
06/05/2025
Violation issued (HPD, open)
A
04/28/2025
Violation issued (FDNY_NOV, closed)
12/31/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01159835-I1
12/31/2024
Permit issued — Sidewalk Shed
X01159835-I1-SH
12/31/2024
Violation issued (FDNY_NOV, closed)
12/31/2024
Violation issued (FDNY_NOV, closed)
11/25/2024
Violation issued (HPD, closed)
I
11/22/2024
Violation issued (ECB, open)
Construction
11/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/27/2024
Violation issued (ECB, open)
Construction
06/24/2024
Violation issued (FDNY_NOV, closed)
06/24/2024
Violation issued (FDNY_NOV, closed)
06/24/2024
Violation issued (FDNY_NOV, closed)
05/30/2024
Violation issued (ECB, open)
Construction
10/04/2023
Violation issued (FDNY_NOV, closed)
08/02/2023
Cycle 9 facade report submitted
03/17/2023
Violation issued (HPD, closed)
A
01/17/2023
Signed off — Alteration
X00636487-I1
12/22/2022
Violation issued (ECB, closed)
Local Law
11/03/2022
Violation issued (HPD, closed)
I
05/31/2022
Permit issued — Mechanical Systems
X00636487-I1-MS
04/20/2022
Permit issued — Mechanical Systems
X00636487-I1-MS
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
I
01/13/2022
Filed — Alteration
X00636487-I1
01/13/2022
Signed off — Alteration
Removal of chiller and associated systems in Boiler Room as per plans filed herewith. No change in use, egress or occupancy. No exterior work. No interior work visible from exterior.
X00634894-I1
12/14/2021
Permit issued — Mechanical Systems
X00634894-I1-MS
12/07/2021
Filed — Alteration
Removal of chiller and associated systems in Boiler Room as per plans filed herewith. No change in use, egress or occupancy. No exterior work. No interior work visible from exterior.
X00634894-I1
11/19/2021
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
11/19/2021
Special inspection requirement — Final
DANIEL COLOMBINI
10/12/2021
Signed off — Alteration
INSTALLATION OF (5) FIVE DUCTLESS HVAC MECHANICAL UNITS ON GRD. FLOOR IN MECHANICAL AND REC. ROOM
X00413526-I1
10/01/2021
Violation issued (ECB, closed)
Construction
08/24/2021
Violation issued (ECB, closed)
Construction
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
01/20/2021
Violation issued (ECB, closed)
Elevators
01/15/2021
Permit issued — Mechanical Systems
X00413526-I1-MS
10/26/2020
Filed — Alteration
INSTALLATION OF (5) FIVE DUCTLESS HVAC MECHANICAL UNITS ON GRD. FLOOR IN MECHANICAL AND REC. ROOM
X00413526-I1
10/15/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/31/2024
DOB NOWMechanical SystemsSigned-offCANNON MECHANICAL INC05/31/2022
DOB NOWMechanical SystemsSigned-offCANNON MECHANICAL INC04/20/2022
DOB NOWMechanical SystemsSigned-offCANNON MECHANICAL INC12/14/2021
DOB NOWMechanical SystemsSigned-offLUXAIRE HVAC SERVICES INC01/15/2021
BISOTISSUEDHERBERT ROSE INC02/01/2017
BISOTISSUEDHERBERT ROSE INC10/12/2016
BISOTISSUEDI & S CONTRACTING LLC10/06/2014
BISOTISSUEDI & S CONTRACTING LLC09/19/2013
BISOTISSUEDALLIED CONTRACTING II COR05/21/2012
BISOTISSUEDTRYSTATE MECHANICAL, INC05/18/2011
BISOTISSUEDTRYSTATE MECHANICAL, INC02/14/2011
BISOTISSUEDTRYSTATE MECHANICAL, INC02/14/2011
BISMHRE-ISSUEDTRYSTATE MECHANICAL, INC11/10/2010
BISEQISSUEDBEDROCK GROUP, LLC03/24/2009
BISMHISSUEDBEDROCK GROUP, LLC03/24/2009
BISMHISSUEDBEDROCK GROUP, LLC01/09/2009
BISEQISSUEDBEDROCK GROUP, LLC01/09/2009
BISMHISSUEDWDF INC05/30/2008
BISMHISSUEDWDF INC03/31/2008
BISOTISSUEDEASTERN WATERPROOFING & RESTORAT01/07/2008
BISMHISSUEDWDF INC11/02/2007
BISOTISSUEDLAKE CONSTRUCTION CORP.04/06/2005
BISPLISSUEDN. KOFSKY11/15/1995
3 projects · most recent 12/26/2024
HVAC Wiring
FiledStatusContractorScope
12/26/2024CompleteBOROWIDE ELECT'L CONTR'S—
09/28/2022CompleteRNW ELECTRIC CORPHVAC Wiring
03/13/2019Permit IssuedJAM ELECTRICAL CORP—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/19/2021Mechanical SystemsDANIEL COLOMBINIspecial
11/19/2021FinalDANIEL COLOMBINIprogress
10/14/2020Energy Code Compliance InspectionsJACKMAN PRESCODprogress
10/14/2020Mechanical SystemsJACKMAN PRESCODspecial
10/14/2020Maintenance informationJACKMAN PRESCODenergy_progress
10/14/2020HVAC insulation and sealing JACKMAN PRESCODenergy_progress
10/14/2020FinalJACKMAN PRESCODprogress
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/25/2026X00634894-I1Request digital key ↗
08/24/2026X00636487-I1Request digital key ↗
08/20/2026X01159835-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00413526-I1Request digital key ↗
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION18
02/13/2017220541297Open ↗
10/12/2016220541297Open ↗
10/06/2014240075226Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
07/13/2016220541297Open ↗
10/06/2014240075226Open ↗
02/18/2014240036055Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
01/24/2017220541297Open ↗
07/13/2016220541297Open ↗
01/28/2015240075226Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026X00413526-I1Open ↗
08/31/2026X00413526-I1Open ↗
08/31/2026X00413526-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00413526-I1Open ↗
08/24/2026X00636487-I1Open ↗
08/13/2026X00634894-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/06/2014240075226Open ↗
09/18/2013240036055Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/06/2014240075226Open ↗
09/18/2013240036055Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/10/2007210026096Open ↗
10/22/2007210019647Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/10/2007210026096Open ↗
10/22/2007210019647Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026X00413526-I1Open ↗
08/28/2026X00634894-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/18/2013240036055Open ↗
▸BISPC FULL REPORT1
12/10/2007210026096Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/17/2011220075790Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/13/2016220541297Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/13/2016220541297Open ↗
10/06/2014240075226Open ↗
09/18/2013240036055Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/10/2007210026096Open ↗
10/22/2007210019647Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00636487-I1Open ↗
08/13/2026X00634894-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/26/2010220075790Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/24/2017220541297Open ↗
07/13/2016220541297Open ↗
02/18/2014240036055Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/24/2017220541297Open ↗
03/06/2014240036055Open ↗
09/07/2012220140390Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/18/2013240036055Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/18/2013240036055Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00636487-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/06/2014240075226Open ↗
10/06/2014240075226Open ↗
09/18/2013240036055Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
02/07/2017220541297Open ↗
01/24/2017220541297Open ↗
01/28/2015240075226Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/25/2012220140390Open ↗
08/07/2010220075790Open ↗
12/07/2007210026096Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/28/2012220140390Open ↗
06/12/2012220075790Open ↗
05/18/2009210026096Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/24/2026X00636487-I1Open ↗
08/13/2026X00634894-I1Open ↗
08/13/2026X01159835-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00634894-I1Open ↗
08/13/2026X00636487-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
01/24/2017220541297Open ↗
07/13/2016220541297Open ↗
01/28/2015240075226Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
12/26/2014240075226Open ↗
12/28/2013240036055Open ↗
06/18/2012220140390Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/06/2014240075226Open ↗
09/18/2013240036055Open ↗
▸BISEFILING COVER SHEET2
07/13/2016220541297Open ↗
04/25/2012220140390Open ↗