← Back
BuildNYC
Miscellaneous educational facility
Eastchester Residence Halls
1925 EASTCHESTER ROAD · BIN 2127321
💬 Discuss this project
1972Year Built
28Stories
W9Building Class
R6Zoning
959,880 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized50 Active Violations 36 unresolved · 14 paperwork only 3 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Miscellaneous educational facility · Owner of record: Albert Einstein College of Medicine · 240,008 sf lot · 4 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing
Cellar2 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Montefiore Medical Center304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services112/31/2024
Goldman Copeland Associates201/13/2022
5D Architecture & Engineering110/26/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
5D Architecture Engineering203/21/2026
Design 2147403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cannon Mechanicalspecialty_contractor707/08/2026
Bedrock GroupGeneral Contractor403/21/2026
Trystate MechanicalGeneral Contractor203/21/2026
WDFGeneral Contractor103/21/2026
Andamio ScaffoldingScaffold104/09/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Luxaire HVAC Servicesspecialty_contractor107/08/2026
RNW ElectricElectrical103/21/2026
Eastern WaterproofingGeneral Contractor103/21/2026
Herbert RoseGeneral Contractor103/21/2026
Lake ConstructionGeneral Contractor103/21/2026
Allied Contracting IIGeneral Contractor105/21/2012
I & S ContractingGeneral Contractor210/06/2014
N. KofskyPlumbing111/15/1995
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423101/13/2022
Goldman Copeland Associates2826201/13/2022
5D Arch. & Engineering2781110/26/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 07/29/2025, status Swarmp
07/15/2026
Elevator Category 1 inspection report filed
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
03/05/2026
Elevator Category 5 inspection report filed
03/04/2026
Elevator Category 5 inspection report filed
191 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Andamio Scaffolding—
DOB NOW—Cannon Mechanical—
DOB NOW—Cannon Mechanical—
DOB NOW—Cannon Mechanical—
DOB NOW—Luxaire HVAC Services—
BIS—Herbert Rose—
BIS—Herbert Rose—
BIS—I & S Contracting—
BIS—I & S Contracting—
BIS—Allied Contracting II—
BIS—Trystate Mechanical—
BIS—Trystate Mechanical—
BIS—Trystate Mechanical—
BIS—Trystate Mechanical—
BIS—Bedrock Group—
BIS—Bedrock Group—
BIS—Bedrock Group—
BIS—Bedrock Group—
BIS—WDF—
BIS—WDF—
BIS—Eastern Waterproofing—
BIS—WDF—
BIS—Lake Construction—
BIS—N. Kofsky—
Nothing on file for this building.
Nothing on file for this building.
144 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account