← Back
Five to six families
1925 STILLWELL AVENUE
BROOKLYN · BIN 3189715
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5BZoning
4,800 sfGross Floor Area
6Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: CZN LLC · 3,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 3 docs
Cellar4p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CZN LLC903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2019$1.5M—Private party → CZN LLC$306/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC306/15/2023
STREET CONSULTING ENGINEERING, P. .110/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373306/15/2023
Building Lifecycle
All (76)Filed (4)Permit Issued (4)Signed Off (3)Violation (57)Inspection (4)Special Inspection (4)
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (ECB, closed)
Construction
11/08/2025
Violation issued (HPD, closed)
C
11/08/2025
Violation issued (HPD, closed)
C
06/11/2025
Violation issued (HPD, closed)
A
06/26/2023
Violation issued (HPD, closed)
B
06/26/2023
Violation issued (HPD, closed)
C
06/22/2023
Signed off — Alteration
DIRECTLY REPLACE BOILER IN THE CELLAR OF EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00713067-I1
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
06/16/2023
Special inspection requirement — Heating Systems
KY FU
06/15/2023
Filed — Alteration
DIRECTLY REPLACE BOILER IN THE CELLAR OF EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00713067-P1
06/02/2023
Violation issued (HPD, closed)
B
06/02/2023
Violation issued (HPD, open)
C
06/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/26/2023
Signed off — Alteration
SUPERSEDE THE LAA FILED (JOB # 301462780); REMOVE AND CAP TWO OLD OIL TANKS; DIRECTLY REPLACE EXISTING BOILER, INSTALL 2 NEW H.W.H., REPLACE GAS PIPING IN CELLAR OF THE EXISTING 3 STORY BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00713063-I1
05/26/2023
Permit issued — Boiler Equipment
B00713067-I1-BE
02/05/2023
Violation issued (HPD, closed)
C
02/05/2023
Violation issued (HPD, closed)
B
02/05/2023
Violation issued (HPD, closed)
B
02/05/2023
Violation issued (HPD, closed)
A
02/05/2023
Violation issued (HPD, closed)
C
06/16/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2022
Permit issued — Boiler Equipment
B00713067-I1-BE
04/14/2022
Permit issued — Plumbing
B00713063-I1-PL
04/08/2022
Filed — Alteration
DIRECTLY REPLACE BOILER IN THE CELLAR OF EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00713067-I1
04/08/2022
Filed — Alteration
SUPERSEDE THE LAA FILED (JOB # 301462780); REMOVE AND CAP TWO OLD OIL TANKS; DIRECTLY REPLACE EXISTING BOILER, INSTALL 2 NEW H.W.H., REPLACE GAS PIPING IN CELLAR OF THE EXISTING 3 STORY BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00713063-I1
04/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
04/06/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
03/25/2022
Violation issued (HPD, closed)
C
03/02/2022
Violation issued (HPD, closed)
A
01/24/2022
Signed off — Alteration
B00603948-I1
01/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2021
Permit issued — General Construction
B00603948-I1-GC
10/29/2021
Filed — Alteration
B00603948-I1
04/13/2021
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
A
02/10/2021
Violation issued (HPD, closed)
A
02/10/2021
Violation issued (HPD, closed)
A
02/10/2021
Violation issued (HPD, closed)
C
11/23/2020
Violation issued (ECB, closed)
Boilers
10/31/2019
Violation issued (HPD, closed)
I
10/22/2019
Violation issued (HPD, closed)
A
10/22/2019
Violation issued (HPD, closed)
A
10/22/2019
Violation issued (HPD, closed)
A
10/19/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
08/24/2016
Violation issued (HPD, closed)
B
08/24/2016
Violation issued (HPD, closed)
B
08/24/2016
Violation issued (HPD, closed)
B
08/24/2016
Violation issued (HPD, closed)
B
08/24/2016
Violation issued (HPD, closed)
B
08/24/2016
Violation issued (HPD, closed)
A
10/14/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC05/26/2023
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC04/15/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/14/2022
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC12/16/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/16/2023Fire-Resistant Penetrations and JointsKY FUspecial
06/16/2023Heating SystemsKY FUspecial
04/06/2022Fire-Resistant Penetrations and JointsKY FUspecial
04/06/2022Energy Code Compliance InspectionsKY FUprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00603948-I1Request digital key ↗
08/30/2026B00713067-P1Request digital key ↗
08/30/2026B00713067-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00603948-I1Open ↗
08/30/2026B00713067-P1Open ↗
08/30/2026B00713067-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00713067-I1Open ↗
09/01/2026B00713063-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00713063-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00603948-I1Open ↗
08/30/2026B00713067-P1Open ↗
08/30/2026B00713067-I1Open ↗
Showing 3 of 4 on file for this type