← Back
Primarily 1 family with 1 store or office
193-12 LINDEN BOULEVARD
QUEENS · BIN 4271603
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R5BZoning
1,696 sfGross Floor Area
2Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,760 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Floor 15p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLORY HOMES REALTY707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/18/2023$925K—19312 HOLDING LLC → Private party$545/sf building
06/02/2022$425K—— → —$251/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGER WILLIAMS, PE309/05/2025
AME SERVICES INC209/25/2024
CL ENGINEERING P.C.412/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PT303/21/2026
METRO DESIGN CONSULTANTS INC803/21/2026
NOEL BUILDING CONSULTING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor404/09/2026
R&R CONTRACTING MGMT CORPGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181309/05/2025
CL ENGINEERING P.C.6781312/05/2023
Building Lifecycle
All (52)Filed (8)Permit Issued (4)Violation (10)Inspection (6)Special Inspection (24)
02/09/2026
Permit issued — Mechanical Systems
Q01277994-S2-MS
02/09/2026
Permit issued — General Construction
Q01277994-I1-GC
11/25/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2025
Filed — Alteration
INSTALL MECHANICAL HOOD AND DUCT OVER COOKING EQUIPMENTS. NO CHANGE TO USE,EGRESS OR OCCUPANCY
Q01277994-S1
09/04/2025
Filed — Alteration
INSTALL MECHANICAL HOOD AND DUCT OVER COOKING EQUIPMENTS. NO CHANGE TO USE,EGRESS OR OCCUPANCY
Q01277994-S2
08/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
08/31/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
08/31/2025
Special inspection requirement — Final
Roger Williams
08/28/2025
Filed — Alteration
INSTALL MECHANICAL HOOD AND DUCT OVER COOKING EQUIPMENTS. NO CHANGE TO USE,EGRESS OR OCCUPANCY
Q01277994-I1
08/27/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
08/27/2025
Special inspection requirement — Air barrier - visual inspection
Roger Williams
08/27/2025
Special inspection requirement — Fenestration areas
Roger Williams
08/27/2025
Special inspection requirement — Lighting controls
Roger Williams
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
12/04/2024
Violation issued (HPD, open)
I
09/25/2024
Filed — Alteration
Installation of double entrance exterior metal door and interior partition.
Q01116606-I1
09/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2024
Special inspection requirement — Final
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/05/2023
Filed — Alteration
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH APPLICATION # Q00845692-I1.
Q00845692-P1
12/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
12/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
12/05/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
12/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/05/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
12/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2023
Violation issued (HPD, open)
I
06/13/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/03/2023
Permit issued — Mechanical Systems
Q00845692-S1-MS
05/03/2023
Permit issued — Plumbing
Q00845692-I1-PL
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2023
Filed — Alteration
AN EXISTING 2-STORY MIXED USE BUILDING, WITH THE REMOVAL OF EXISTING BOILER AT THE CELLAR ONLY UNDER THIS APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY. TO SUPERSEDE LAA APP# 440024965.
Q00845245-I1
04/17/2023
Filed — Alteration
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH APPLICATION # Q00845692-I1.
Q00845692-S1
04/17/2023
Filed — Alteration
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH APPLICATION # Q00845692-I1.
Q00845692-I1
04/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
04/17/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPRECISION HOME DEV INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC02/09/2026
DOB NOWMechanical SystemsPermit IssuedR&R CONTRACTING MGMT CORP05/03/2023
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC05/03/2023
2 projects · most recent 09/05/2025
Others Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/05/2025Permit IssuedPRECISION HOME DEV INCOthers
Other
__Junk__ 00 Ductwork ×4
12/05/2023Permit IssuedR&R CONTRACTING MGMT CORPAir Conditioning Systems, Heating Systems
Cooling
Goodman GSX130601BJ 60,000 BTU · Condensing Unit ×1
Heating
Goodman GM9S801005CNAA 100,000 BTU · Furnace ×1
1 project · most recent 12/05/2023
Gas
FiledStatusContractorScope
12/05/2023Permit IssuedALL PRO PLBG & HTG INCGas
1 project · most recent 08/14/2022
General Wiring
FiledStatusContractorScope
08/14/2022CompleteINDY ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/31/2025Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
08/31/2025Mechanical SystemsTREVOR O. FLOWERSspecial
08/31/2025FinalRoger Williamsprogress
08/27/2025FinalTREVOR O. FLOWERSprogress
08/27/2025Air barrier - visual inspectionRoger Williamsenergy_progress
08/27/2025Fenestration areasRoger Williamsenergy_progress
08/27/2025Lighting controlsRoger Williamsenergy_progress
08/27/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
08/27/2025Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
09/25/2024Tenant Protection Plan Compliance—special
09/24/2024Final—progress
12/05/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/05/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
12/05/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/05/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
12/05/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/05/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/17/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/17/2023Mechanical SystemsCHRISTIAN LOZADAspecial
04/17/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/17/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/17/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
04/17/2023FinalCHRISTIAN LOZADAprogress
04/17/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026Q01116623-I1Request digital key ↗
08/24/2026Q00845692-P1Request digital key ↗
08/24/2026Q00845692-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q00845692-I1Open ↗
08/21/2026Q01116606-I1Open ↗
08/19/2026Q01277994-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/20/2026Q01277994-I1Open ↗
09/20/2026Q01277994-I1Open ↗
09/20/2026Q01277994-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/20/2026Q01277994-I1Open ↗
09/20/2026Q01277994-I1Open ↗
08/25/2026Q01277994-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00845692-I1Open ↗
08/21/2026Q01116606-I1Open ↗
08/19/2026Q01277994-I1Open ↗
Showing 3 of 8 on file for this type