← Back
Church, synagogue, chapel
193-16 99 AVENUE
QUEENS · BIN 4231787
💬 Discuss this project
1924Year Built
1Stories
M1Building Class
R3-2Zoning
2,990 sfGross Floor Area
0Units
Church, synagogue, chapel · Owner of record: PILGRIM PNTCSTL CHURCH · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GAD ASHOORI PE309/27/2023
Building Lifecycle
All (34)Filed (3)Objection (20)Special Inspection (11)
10/30/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/22/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Structural
10/16/2023
Objection raised — Other
10/12/2023
Objection resolved — Addressed
10/05/2023
Objection raised — Scope
10/05/2023
Objection raised — Scope
10/05/2023
Objection raised — Structural
10/05/2023
Objection raised — Other
09/27/2023
Filed — Alteration
STRUCTURE WORK TO REPLACE EXISTINGCMU BLOCK FOUNDATION WALL WITH NEW CONCRETE FOUNDATION WALL
Q00927947-S2
09/27/2023
Objection raised — Other
09/26/2023
Filed — Alteration
STRUCTURE WORK TO REPLACE EXISTINGCMU BLOCK FOUNDATION WALL WITH NEW CONCRETE FOUNDATION WALL
Q00927947-S1
09/22/2023
Special inspection requirement — Subgrade Inspections
09/22/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/20/2023
Special inspection requirement — Insulation placement and R values
09/20/2023
Special inspection requirement — Protection of exposed foundation insulation
09/19/2023
Objection resolved — Addressed
09/19/2023
Objection resolved — Addressed
09/19/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/19/2023
Special inspection requirement — Subgrade Inspections
09/06/2023
Objection raised — Inspections
09/06/2023
Objection raised — Energy
09/06/2023
Objection raised — Inspections
09/01/2023
Filed — Alteration
STRUCTURE WORK TO REPLACE EXISTINGCMU BLOCK FOUNDATION WALL WITH NEW CONCRETE FOUNDATION WALL
Q00927947-I1
09/01/2023
Special inspection requirement — Concrete - Cast-In-Place
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/31/2023
Special inspection requirement — Footing and Foundation
08/31/2023
Special inspection requirement — Final
08/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nothing on file for this building.
1 project · most recent 09/27/2023
FiledStatusContractorScope
09/27/2023——2 scope_items
1 project · most recent 09/27/2023
Fence
FiledStatusContractorScope
09/27/2023——Fence
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/22/2023Subgrade Inspections—special
09/22/2023Excavations - Sheeting, Shoring, and Bracing—special
09/20/2023Insulation placement and R values—energy_progress
09/20/2023Protection of exposed foundation insulation—energy_progress
09/19/2023Excavations - Sheeting, Shoring, and Bracing—special
09/19/2023Subgrade Inspections—special
09/01/2023Concrete - Cast-In-Place—special
09/01/2023Fire-Resistant Penetrations and Joints—special
08/31/2023Footing and Foundation—progress
08/31/2023Final—progress
08/31/2023Structural Stability – Alterations of existing buildings—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026Q00927947-S2Request digital key ↗
08/24/2026Q00927947-S1Request digital key ↗
08/24/2026Q00927947-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00927947-S1Open ↗
08/13/2026Q00927947-S2Open ↗
08/13/2026Q00927947-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026Q00927947-I1Open ↗
08/13/2026Q00927947-S1Open ↗
08/13/2026Q00927947-S2Open ↗