Clinton Hill Coops - North Campus
193 CLINTON AVENUE · Clinton Hill · BIN 3322381
💬 Discuss this project
1944Year Built
14Stories
D4Building Class
R6Zoning
651,914 sfGross Floor Area
520Units
LL97 CoveredRent Stabilized209 Active Violations 204 unresolved · 5 paperwork only ▸FDNY Report ↗
Elevator cooperative · Owner of record: Clinton Hill Apartment Owners · 82,350 sf lot · 7.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsClinton Hill Apts. Owners Corp.Under Construction2 filings
RoofJerrick Associates, INC.1 filing · 2 docs
Floor 9Unit 9H1 filing · 3 docs
Floor 8
Floor 7Unit 7F, Unit 7G1 filing · 5 docs
Floor 6
Floor 5Unit 5F2 filings · 8 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarNew accessory use laundry area1 filing · 17 docs
Site & exteriorJerrick Associates, INC.Under Construction2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clinton-Hill Apartment Owners Co1807/08/2026
Jerrick Associates910/09/2026
Chaoc103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hlzae403/21/2026
J. Callahan Consulting103/21/2026
AE Design Solution403/21/2026
L & J Design Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold410/09/2026
Agalliu ContractingGeneral Contractor303/21/2026
Paradise Restorationspecialty_contractor303/21/2026
Sato Construction CoGeneral Contractor203/21/2026
Accurate MechanicalPlumbing207/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection207/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
R.C.M. ElectricElectrical103/21/2026
S.A.L. Electric CoElectrical103/22/2026
Jerrick AssociatesGeneral Contractor107/08/2026
RPJ ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712410/16/2025
Moore Engineering of NY9134209/18/2025
O'Rourke Engineering5873309/18/2025
Moore Associates3408105/16/2024
Silvia Fuca-Tomescu3725206/28/2022
Certified Testing Laborat396106/30/2020
Building Lifecycle
All (132)Filed (14)Permit Issued (14)Signed Off (4)Violation (60)Inspection (8)Objection (6)Special Inspection (26)
10/07/2026
Permit issued — Sidewalk Shed
B01350084-I1-SH
07/10/2026
Permit issued — Sidewalk Shed
B01350084-I1-SH
07/02/2026
Permit issued — Suspended Scaffold
B01394189-I1-SC
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/16/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Other
05/27/2026
Objection resolved — Addressed
05/11/2026
Objection raised — Other
04/28/2026
Filed — Alteration
FACADE REPAIRS, SCAFFOLD INSPECTIONS, 3 MEN LETTER.
B01394189-I1
04/06/2026
Permit issued — Sidewalk Shed
B01350084-I1-SH
02/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01350084-I1
11/10/2025
Permit issued — General Construction
B01229350-I1-GC
11/05/2025
Special inspection requirement — Insulation placement and R values
Jon Colatrella
11/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jon Colatrella
11/05/2025
Special inspection requirement — Post-installed Anchors
Jon Colatrella
11/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jon Colatrella
11/05/2025
Special inspection requirement — Final
Jon Colatrella
10/27/2025
Signed off — Alteration
For Tenants' use only: Install 4 washer machines, 1 waste water receiver, 4 gas clothes dryers, venting for dryers, and 2 sprinkler heads off wet standpipe. No change in egresss, use or occupancy.
B00915284-I1
10/16/2025
Filed — Alteration
FACADE REPAIRS TO INCLUDE BRICK MASONRY REPAIRS & REPLACEMENT, LINTEL REPAIRS & REPLACEMENT, & MAIN ROOF, BULKHEAD ROOF AND TERRACE REPLACEMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01229350-P1
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/14/2025
Special inspection requirement — Post-installed Anchors
Howard Zimmerman
10/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
10/14/2025
Special inspection requirement — Insulation placement and R values
Howard Zimmerman
10/14/2025
Special inspection requirement — Final
Howard Zimmerman
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2025
Filed — Alteration
For Tenants' use only: Install 4 washer machines, 1 waste water receiver, 4 gas clothes dryers, venting for dryers, and 2 sprinkler heads off wet standpipe. No change in egresss, use or occupancy.
B00915284-P2
09/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MOORE
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
09/12/2025
Special inspection requirement — Sprinkler Systems
BRIAN O'ROURKE
09/12/2025
Special inspection requirement — Standpipe Systems
BRIAN O'ROURKE
09/03/2025
Permit issued — Supported Scaffold
B01279602-I1-SF
09/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01279602-I1
06/24/2025
Filed — Alteration
FACADE REPAIRS TO INCLUDE BRICK MASONRY REPAIRS & REPLACEMENT, LINTEL REPAIRS & REPLACEMENT, & MAIN ROOF, BULKHEAD ROOF AND TERRACE REPLACEMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01229350-I1
11/30/2024
Violation issued (HPD, closed)
B
11/30/2024
Violation issued (HPD, closed)
C
11/27/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/24/2024
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
05/24/2024
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
05/24/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2024
Filed — Alteration
For Tenants' use only: Install 4 washer machines, 1 waste water receiver, 4 gas clothes dryers, venting for dryers, and 2 sprinkler heads off wet standpipe. No change in egresss, use or occupancy.
B00915284-P1
05/16/2024
Permit issued — Plumbing
B00915284-I1-EW-SP
05/16/2024
Permit issued — Sprinklers
B00915284-I1-EW-SD
05/15/2024
Special inspection requirement — Sprinkler Systems
BRIAN O'ROURKE
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
05/15/2024
Special inspection requirement — Standpipe Systems
BRIAN O'ROURKE
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MOORE
05/14/2024
Permit issued — Standpipe
B00915284-I1-PL
09/25/2023
Filed — Alteration
For Tenants' use only: Install 4 washer machines, 1 waste water receiver, 4 gas clothes dryers, venting for dryers, and 2 sprinkler heads off wet standpipe. No change in egresss, use or occupancy.
B00915284-I1
08/30/2023
Violation issued (HPD, closed)
B
08/30/2023
Violation issued (HPD, closed)
A
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJerrick Associates10/07/2026
DOB NOWSidewalk ShedPermit IssuedJerrick Associates07/10/2026
DOB NOWSuspended ScaffoldPermit IssuedJerrick Associates07/02/2026
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction04/06/2026
DOB NOWGeneral ConstructionPermit IssuedGE 2A Construction11/10/2025
DOB NOWSupported ScaffoldPermit IssuedGE 2A Construction09/03/2025
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler05/16/2024
DOB NOWStandpipeSigned-offAdvanced Plumbing, Mechanical & Sprinkler05/16/2024
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical05/14/2024
DOB NOWGeneral ConstructionSigned-offAgalliu Contracting12/16/2022
DOB NOWGeneral ConstructionSigned-offParadise Restoration07/20/2022
DOB NOWPlumbingSigned-offAnthony Disabato02/10/2022
DOB NOWGeneral ConstructionSigned-offSato Construction Co11/04/2021
DOB NOWPlumbingSigned-offAnthony Disabato08/07/2020
BISOTISSUEDKennedy Construction Service09/23/2020
BISOTISSUEDKennedy Construction Service07/14/2020
BISEQISSUEDRock Group NY06/06/2013
BISOTISSUEDSato Construction Co03/18/2013
BISOTISSUEDSkyline Restoration05/23/2007
BISEQISSUEDRockledge Scaffold04/06/2007
BISEQISSUEDRockledge Scaffold05/16/2006
BISPLISSUEDCegf & G Plumbing02/03/2006
BISOTISSUEDGem Mechanical02/03/2006
BISEQISSUEDWolf Installations09/19/2005
BISOTISSUEDWolf Installations03/31/1999
BISOTISSUEDWolf Installations05/27/1998
BISEQISSUEDYork Scaffold Equipment01/30/1998
BISEQISSUEDYork Scaffold01/28/1997
BISEQISSUEDYork Scaffold02/28/1996
BISOTISSUEDJimco Restoration06/24/1994
6 projects · most recent 03/05/2026
General Wiring
FiledStatusContractorScope
03/05/2026Permit IssuedDM Electrical—
02/18/2024Permit IssuedBNH ElectricalGeneral Wiring
05/14/2022CompleteAll Boro Electric—
11/03/2021Permit IssuedCurrent Mechs Electric ContsGeneral Wiring
07/20/2021CompleteS.A.L. Electric Co—
07/24/2020Permit IssuedMomern Elect'l ContractorsGeneral Wiring
2 projects · most recent 02/20/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
02/20/2026Permit IssuedJerrick AssociatesSidewalk Shed
09/02/2025Permit IssuedJerrick AssociatesScaffold
1 project · most recent 04/28/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/28/2026Permit IssuedJerrick AssociatesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2024Pass-Final PL - UndergroundPassView ↗
05/24/2024Fail-Final PL - UndergroundFailView ↗
05/24/2024Pass-Final SD - Up to 3 Requested FloorsPassView ↗
05/24/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/05/2025Insulation placement and R valuesJon Colatrellaenergy_progress
11/05/2025Tenant Protection Plan ComplianceJon Colatrellaspecial
11/05/2025Post-installed AnchorsJon Colatrellaspecial
11/05/2025Structural Stability – Alterations of existing buildingsJon Colatrellaspecial
11/05/2025FinalJon Colatrellaprogress
10/14/2025Tenant Protection Plan Compliance—special
10/14/2025Post-installed AnchorsHoward Zimmermanspecial
10/14/2025Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
10/14/2025Insulation placement and R valuesHoward Zimmermanenergy_progress
10/14/2025FinalHoward Zimmermanprogress
09/12/2025Tenant Protection Plan ComplianceJAMES MOOREspecial
09/12/2025Fire-Resistant Penetrations and JointsJAMES MOOREspecial
09/12/2025Sprinkler SystemsBRIAN O'ROURKEspecial
09/12/2025Standpipe SystemsBRIAN O'ROURKEspecial
05/15/2024Sprinkler SystemsBRIAN O'ROURKEspecial
05/15/2024Fire-Resistant Penetrations and JointsJAMES MOOREspecial
05/15/2024Standpipe SystemsBRIAN O'ROURKEspecial
05/15/2024Tenant Protection Plan ComplianceJAMES MOOREspecial
06/28/2022Lighting in dwelling unitsSILVIA FUCA-TOMESCUenergy_progress
04/19/2022Fire-Resistant Penetrations and JointsSILVIA FUCA-TOMESCUspecial
04/19/2022Fire-Resistant Penetrations and JointsSILVIA FUCA-TOMESCUspecial
04/19/2022FinalSILVIA FUCA-TOMESCUprogress
11/04/2021FinalHoward Zimmermanprogress
11/04/2021MasonryHoward Zimmermanspecial
10/28/2021FinalHoward Zimmermanprogress
Latest 25 of 26.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/31/2026B00521616-I1Request digital key ↗
08/31/2026B00521616-P1Request digital key ↗
08/29/2026B00722023-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00361321-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
07/14/2020322019034Open ↗
07/14/2020322019034Open ↗
06/07/2013320863632Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2013320863632Open ↗
06/08/2012320486265Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B01229350-P1Open ↗
09/02/2026B01229350-P1Open ↗
09/01/2026B00722023-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00722023-I1Open ↗
08/28/2026B08022387-I1Open ↗
08/26/2026B00915284-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B01229350-P1Open ↗
09/02/2026B01229350-P1Open ↗
08/29/2026B00521616-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/19/2020322019034Open ↗
01/10/2020322019034Open ↗
06/08/2012320486265Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/07/2013320863632Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/07/2013320863632Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
02/14/2020322019034Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00361321-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00722023-I1Open ↗
08/28/2026B08022387-I1Open ↗
08/26/2026B00915284-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/10/2020322019034Open ↗
06/08/2012320486265Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026B01229350-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/19/2020322019034Open ↗
06/08/2012320486265Open ↗
▸BISEN2 - As Built Energy Analysis2
05/27/2014320486265Open ↗
05/12/2021322019034Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/12/2021322019034Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/27/2014320486265Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00721098-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/17/2021322019034Open ↗
05/17/2021322019034Open ↗
05/12/2021322019034Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
06/07/2013320863632Open ↗
06/08/2012320486265Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/27/2014320486265Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/17/2021322019034Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
05/12/2021322019034Open ↗
02/14/2020322019034Open ↗
01/10/2020322019034Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
01/10/2020322019034Open ↗
01/10/2020322019034Open ↗
06/07/2013320863632Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWDHCR Document1
08/13/2026B00361321-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/15/2026B01394189-I1Open ↗
▸DOB NOWCalculations1
08/15/2026B01394189-I1Open ↗