← Back
BuildNYC
Elevator apt, fireproof with stores
193 MARCUS GARVEY BOULEVARD
BROOKLYN · BIN 3043320
💬 Discuss this project
1930Year Built
4Stories
D6Building Class
R6AZoning
48,166 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 372 Kosciuszko Realty Holdings · 12,500 sf lot · 3.85 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1One World Playspace2p · 3 filings · 9 docs
Site & exteriorDusk Til Dawn Bar & Lounge1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
372 LLC503/21/2026
Dusk Til Dawn Bar & Lounge307/08/2026
372 Kosciuszko Realty Holdings203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2016$4.6M—DONENFELD REALTY LLC → 372 KOSCIUSZKO LLC$96/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Long Island Associates108/23/2022
S. Schwartz Engineering210/21/2019
Leon Skvirsky PE102/28/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Edward F Zevallos Architect403/21/2026
Building Brothers203/21/2026
VS Creative Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Crown AireGeneral Contractor203/21/2026
Paul SignsSign hanger107/08/2026
Tristate Fire SprinklersFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Simon Schwartz, P.E2598210/21/2019
Building Lifecycle
All (55)Filed (4)Permit Issued (3)Signed Off (2)Violation (46)
02/10/2026
Violation issued (FDNY_NOV, closed)
12/29/2025
Violation issued (HPD, closed)
B
12/29/2025
Violation issued (HPD, closed)
C
11/28/2025
Violation issued (HPD, closed)
C
03/12/2025
Violation issued (HPD, closed)
A
06/03/2024
Violation issued (HPD, closed)
A
06/03/2024
Violation issued (HPD, closed)
C
10/31/2023
Violation issued (HPD, closed)
B
10/31/2023
Violation issued (HPD, closed)
C
10/31/2023
Violation issued (HPD, closed)
C
10/31/2023
Violation issued (HPD, closed)
C
10/31/2023
Violation issued (HPD, closed)
A
10/31/2023
Violation issued (HPD, closed)
A
10/31/2023
Violation issued (HPD, closed)
B
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
C
02/18/2023
Violation issued (HPD, closed)
A
02/18/2023
Violation issued (HPD, closed)
A
08/23/2022
Filed — Alteration
FILING FOR INTERIOR RENOVATIONS OF THE MIDDLE STORE ON MARCUS GARVEY BLVD FOR INDOOR KIDS PLAY AREA. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00789667-I1
09/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2020
Signed off — Alteration
B00242359-I1
01/15/2020
Permit issued — Mechanical Systems
B00206467-I1-MS
12/11/2019
Permit issued — Sprinklers
B00242359-I1-EW-SP
10/21/2019
Filed — Alteration
B00242359-I1
10/21/2019
Filed — Alteration
B00206467-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2018
Signed off — Alteration
B00016197-I1
03/02/2018
Permit issued — Sign
B00016197-I1-SG
02/28/2018
Filed — Alteration
B00016197-I1
07/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/16/2015
Violation issued (ECB, closed)
Construction
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2014
Violation issued (ECB, closed)
Construction
05/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (FDNY_NOV, closed)
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/1994
Violation issued (FDNY_NOV, closed)
09/29/1994
Violation issued (FDNY_NOV, closed)
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCrown Aire01/15/2020
DOB NOWSprinklersSigned-offTristate Fire Sprinkler12/11/2019
DOB NOWSignSigned-offPaul Signs03/02/2018
BISOTISSUEDSkyler Property Services10/25/2019
BISPLISSUEDDNA Plumbing Contractors08/29/2016
BIS—ISSUEDCS Construction Group06/20/2016
BISEQISSUEDHKS Construction03/07/2016
BISPLISSUEDDNA Plumbing Contractors08/25/2015
BIS—ISSUEDCS Construction Group06/19/2015
BISEQISSUEDCS Construction Group06/19/2015
BISEQISSUEDPowers Bridging & Scaffolding04/01/2015
BISEQISSUEDHKS Construction03/06/2015
BISPLISSUEDDNA Plumbing Contractors08/08/2014
BISEQISSUEDB H & B Construction06/10/2014
BISEQISSUEDPowers Bridging & Scaffolding03/28/2014
BIS—ISSUEDArtist Construction01/07/2014
BIS—RE-ISSUEDArtist Construction01/07/2014
BISEQISSUEDArtist Construction01/07/2014
BISEQISSUEDAnrc Construction11/07/2013
BISEQISSUEDPowers Bridging & Scaffolding07/31/2013
BISSPISSUEDCapitol Fire SPKL Co03/15/2006
3 projects · most recent 11/22/2019
General Wiring
FiledStatusContractorScope
11/22/2019CompleteE & M Electrical NYGeneral Wiring
03/23/2018Permit IssuedRobert S. Covello—
12/19/2017Permit IssuedCity Lights ElectricGeneral Wiring
Nothing on file for this building.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
One World PlayspaceFitness / RecreationFloor 1
Project B00789667 Alteration · Approved · 08/23/2022
Dusk Til Dawn Bar & LoungeRestaurant / Food Service—
Project B00016197 Alteration · LOC Issued · 02/28/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 157 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
09/03/2026B00016197-I1Request digital key ↗
08/28/2026B00789667-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00206467-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00242359-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION18
08/01/2019321981432Open ↗
03/21/2017302034233Open ↗
01/25/2017320516063Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
10/26/2019321981432Open ↗
11/04/2016320516063Open ↗
06/20/2016320516063Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/01/2016321281956Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/06/2016320516063Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT I- CERTIFICATION1
08/19/2013320516063Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
08/19/2013320516063Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
08/19/2013320516063Open ↗
▸BISZONING DIAGRAM1
12/31/2013320516063Open ↗
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
02/05/2020321981432Open ↗
08/01/2019321981432Open ↗
01/31/2017320516063Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026B00016197-I1Open ↗
08/13/2026B00789667-I1Open ↗
08/13/2026B00242359-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/01/2019321981432Open ↗
06/08/2014340151436Open ↗
07/31/2013340076429Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/08/2014340151436Open ↗
07/31/2013340076429Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/08/2014340151436Open ↗
07/31/2013340076429Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/01/2019321981432Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
10/14/2016320516063Open ↗
09/03/2013320516063Open ↗
05/16/2013320516063Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
12/27/2016320577844Open ↗
12/15/2016320516063Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
03/01/2016321281956Open ↗
01/05/2016321281956Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00206467-I1Open ↗
08/13/2026B00242359-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/20/2017320516063Open ↗
▸BISST-1 Street Tree Checklist1
08/19/2013320516063Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/04/2013320516063Open ↗
▸Environmental & Asbestos6
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
01/08/2014320516063Open ↗
08/19/2013320516063Open ↗
06/06/2013320516063Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026B00016197-I1Open ↗
08/13/2026B00789667-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/08/2014340151436Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/05/2020321981432Open ↗
08/01/2019321981432Open ↗
03/20/2017320516063Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/05/2020321981432Open ↗
03/20/2017320516063Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/19/2013320516063Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/31/2013340076429Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
03/20/2017320516063Open ↗
12/05/2016320516063Open ↗
06/05/2014320516063Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/08/2014340151436Open ↗
07/31/2013340076429Open ↗
▸BISSoil Report1
09/03/2013320516063Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/04/2013320516063Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/19/2013320516063Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
02/05/2020321981432Open ↗
03/20/2017320516063Open ↗
03/20/2017320516063Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
05/23/2016320516063Open ↗
01/08/2014320516063Open ↗
12/31/2013320516063Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE6
09/03/2013320516063Open ↗
09/03/2013320516063Open ↗
08/06/2013320516063Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
03/09/2015340151436Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
02/05/2020321981432Open ↗
08/01/2019321981432Open ↗
01/05/2016321281956Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/20/2016320516063Open ↗
06/29/2015320516063Open ↗
01/08/2014320516063Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/04/2013320516063Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION6
03/17/2017320516063Open ↗
11/22/2016320516063Open ↗
10/06/2016320516063Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet5
09/03/2013320516063Open ↗
08/01/2013320516063Open ↗
05/16/2013320516063Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
08/01/2019321981432Open ↗
01/05/2016321281956Open ↗
▸BISBOROUGH INTAKE FORM1
02/05/2020321981432Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/01/2016321281956Open ↗
▸Other Documents2
▸BISBPP - SUPPORTING DOCUMENTATION1
12/15/2016320516063Open ↗
▸BISPlot Diagram1
08/19/2013320516063Open ↗