← Back
Elevator apt, converted
1930 HARRISON AVENUE
BRONX · BIN 2008606
💬 Discuss this project
1925Year Built
5Stories
D5Building Class
R7-1Zoning
39,500 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Elevator apt, converted · Owner of record: NYC HOUSING AUTHORITY · 9,400 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
Floor 5Under Construction1 filing · 20 docs
Floor 4Under Construction1 filing · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
CellarUnder Construction4p · 1 filing · 20 docs
1 job · most recent 06/18/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedRENEWAL CONSTRUCTION SERVHeating Systems, Ventilation Systems
Heating
Sigma 24C075SBBN08S 653 BTU · Radiant ×68
Ventilation
Greenheck G097VG 150 CFM · Exhaust Fan ×14
2 jobs · most recent 06/18/2026
Storm Gas Water/Sanitary
FiledStatusContractorScope
06/18/2026Signed-offRUGOVA GROUP LLCGas, Storm, Water/Sanitary
07/17/2025——Storm
7 jobs · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026Permit IssuedLIT MODE ELECL CONTG INC—
05/21/2026CompleteASCUATECH ELECTRICAL CORP—
02/11/2026CompleteRND ELECTRIC CORP—
11/20/2025CompleteLAURA ELEC'L LIGHTING &—
11/14/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/03/2024Permit IssuedZIGGY'S ELECL CONTNG CORP—
04/22/2024CompleteARCADIA ELECT'L CO. INC.—
1 job · most recent 07/17/2025
Steel Concrete Masonry
FiledStatusContractorScope
07/17/2025Permit IssuedRENEWAL CONSTRUCTION SERVSteel, Concrete, Masonry
1 job · most recent 05/14/2026
Scaffold
FiledStatusContractorScope
05/14/2026Permit IssuedP & K CONTRACTING INCScaffold
1 job · most recent 10/06/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/06/2025——Suspended Scaffold (SC)
Building Lifecycle
All (116)Filed (25)Permit Issued (23)Signed Off (3)Violation (29)Inspection (6)Special Inspection (30)
07/06/2026
Permit issued — General Construction
X01047030-S5-GC
06/18/2026
Filed — Alteration
Gas piping to new boilers, as part of tenant in place moderate rehabilitation. No change in egress, use, or occupancy.
X01047030-S5
06/16/2026
Special inspection requirement — Fenestration air leakage
Sandeep Gunnala
06/16/2026
Special inspection requirement — Air barrier - visual inspection
Sandeep Gunnala
06/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Sandeep Gunnala
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Sandeep Gunnala
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
05/15/2026
Permit issued — Supported Scaffold
X01386331-I1-SF
05/14/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1930 HARRISON AVENUE BRONX NY 10453 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01386331-I1
04/13/2026
Special inspection requirement — Post-installed Anchors
WALIUR RAHMAN
03/26/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/20/2026
Filed — Alteration
Gas piping to new boilers, as part of tenant in place moderate rehabilitation. No change in egress, use, or occupancy.
X01047030-P3
02/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
02/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
02/20/2026
Special inspection requirement — Electrical motors and elevators
Sandeep Gunnala
02/20/2026
Special inspection requirement — Final
Sandeep Gunnala
02/20/2026
Special inspection requirement — Mechanical Systems
Sandeep Gunnala
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
02/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
02/20/2026
Special inspection requirement — Shutoff dampers
Sandeep Gunnala
02/19/2026
Permit issued — Suspended Scaffold
X01302782-I1-SC
02/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Permit issued — General Construction
X01047030-I1-GC
02/09/2026
Permit issued — General Construction
X00785297-I1-GC
02/09/2026
Permit issued — Structural
X00785297-S2-ST
02/03/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
02/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Permit issued — Structural
X00785297-S2-ST
12/29/2025
Permit issued — General Construction
X00785297-I1-GC
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
12/16/2025
Filed — Alteration
Gas piping to new boilers, as part of tenant in place moderate rehabilitation. No change in egress, use, or occupancy.
X01047030-P2
12/10/2025
Filed — Alteration
X01302782-P1
10/29/2025
Filed — Alteration
Gas piping to new boilers, as part of tenant in place moderate rehabilitation. No change in egress, use, or occupancy.
X01047030-P1
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
10/22/2025
Permit issued — Sidewalk Shed
X01298151-I1-SH
10/21/2025
Filed — Alteration
X01298151-I1
10/17/2025
Permit issued — Suspended Scaffold
X01302782-I1-SC
10/16/2025
Permit issued — General Construction
X00785297-I1-GC
10/14/2025
Filed — Alteration
X01302782-I1
10/10/2025
Permit issued — Structural
X00785297-S2-ST
10/06/2025
Filed — Alteration
Installation of Material Hoist.
X01298190-I1
09/22/2025
Permit issued — Structural
X00785297-S2-ST
07/22/2025
Permit issued — Boiler Equipment
X01047030-S4-BE
07/22/2025
Permit issued — Plumbing
X01047030-S3-PL
07/17/2025
Filed — Alteration
Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
X00785297-P5
07/17/2025
Special inspection requirement — Final
Sandeep Gunnala
06/25/2025
Permit issued — General Construction
X00785297-I1-GC
06/24/2025
Permit issued — Structural
X00785297-S2-ST
06/11/2025
Permit issued — General Construction
X01047030-I1-GC
Latest 60 of 116 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NW BRONX OZ HOUSING PRESERVATION EXPERIENCE LP607/08/2026
NYCHA2607/08/2026
UNION HOUSING PRESERVATION1404/09/2026
NEW YORK CITY HOUSING AUTHORITY1004/09/2026
NYC HOUSING AUTHORITY303/22/2026
NYCHA 99103/22/2026
GUARDSMAN ELEVATOR CO., INC.103/22/2026
NYC HOUSING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PURCELL EVERETT ARCHITECTS1203/21/2026
W J PROFESSIONAL EXPEDITING2003/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAVEN CONSTRUCTION SERVICGeneral Contractor903/21/2026
RENEWAL CONSTRUCTION SERVICESGeneral Contractor907/08/2026
ADAM'S EUROPEAN CONTRACTINGGeneral Contractor607/08/2026
VEMA GROUP LLCGeneral Contractor404/09/2026
RUGOVA GROUP LLCPlumbing206/28/2026
P & K CONTRACTING INCGeneral Contractor107/08/2026
ASCUATECH ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI84821006/18/2026
AK CONSULTING SERVICES, I6198105/14/2026
20/20 INSPECTIONS INC1471407/17/2025
JOEL PHAGOO ,PE, PLLC2416107/31/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERVICES07/06/2026
DOB NOWSupported ScaffoldPermit IssuedP & K CONTRACTING INC05/15/2026
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC02/19/2026
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV02/09/2026
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV02/09/2026
DOB NOWStructuralPermit IssuedRENEWAL CONSTRUCTION SERV02/09/2026
DOB NOWStructuralPermit IssuedADAM'S EUROPEAN CONTRACTING12/29/2025
DOB NOWGeneral ConstructionPermit IssuedADAM'S EUROPEAN CONTRACTING12/29/2025
DOB NOWSidewalk ShedPermit IssuedVEMA GROUP LLC10/22/2025
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC10/17/2025
DOB NOWGeneral ConstructionPermit IssuedVEMA GROUP LLC10/16/2025
DOB NOWStructuralPermit IssuedVEMA GROUP LLC10/10/2025
DOB NOWStructuralPermit IssuedADAM'S EUROPEAN CONTRACTING09/22/2025
DOB NOWBoiler EquipmentSigned-offRUGOVA GROUP LLC07/22/2025
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC07/22/2025
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV06/25/2025
DOB NOWStructuralPermit IssuedRENEWAL CONSTRUCTION SERV06/24/2025
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV06/11/2025
DOB NOWGeneral ConstructionPermit IssuedADAM'S EUROPEAN CONTRACTING10/04/2024
DOB NOWStructuralPermit IssuedADAM'S EUROPEAN CONTRACTING10/03/2024
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC08/02/2024
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC05/03/2024
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC05/03/2024
BISEQISSUEDM.S.T GENERAL CONTRACTING06/22/2006
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/26/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2026Fail-Final Boiler Equipment InspectionFailView ↗
02/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
06/16/2026Fenestration air leakageSandeep Gunnalaenergy_progress
06/16/2026Air barrier - visual inspectionSandeep Gunnalaenergy_progress
06/16/2026Fenestration and door U-factor and product ratingsSandeep Gunnalaenergy_progress
06/16/2026Energy Code Compliance InspectionsSandeep Gunnalaprogress
06/16/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
04/13/2026Post-installed AnchorsWALIUR RAHMANspecial
02/20/2026Tenant Protection Plan Compliance—special
02/20/2026HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
02/20/2026HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
02/20/2026Electrical motors and elevatorsSandeep Gunnalaenergy_progress
02/20/2026FinalSandeep Gunnalaprogress
02/20/2026Mechanical SystemsSandeep Gunnalaspecial
02/20/2026Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
02/20/2026HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
02/20/2026Shutoff dampersSandeep Gunnalaenergy_progress
12/17/2025Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
12/17/2025Tenant Protection Plan Compliance—special
12/17/2025HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
12/17/2025HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
12/17/2025HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
10/29/2025HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
10/29/2025Tenant Protection Plan Compliance—special
10/29/2025HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
10/29/2025HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
Latest 25 of 55.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/21/2026X01042976-I1Request digital key ↗
08/21/2026X01042973-I1Request digital key ↗
08/21/2026X01042985-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature24
09/14/2026X01047030-P3Open ↗
09/02/2026X00785297-S2Open ↗
09/01/2026X01047030-S5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/21/2026X01042976-I1Open ↗
08/21/2026X01042973-I1Open ↗
08/21/2026X01042985-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/14/2026X01047030-P3Open ↗
09/14/2026X01047030-P3Open ↗
09/02/2026X00785297-S2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026X01047030-S2Open ↗
08/17/2026X01047030-P1Open ↗
08/17/2026X01047030-P2Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/21/2026X01042976-I1Open ↗
08/18/2026X00785297-P5Open ↗
08/18/2026X00785297-P4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/18/2026X00785297-S2Open ↗
08/18/2026X00785297-I1Open ↗
▸Other Documents6
▸DOB NOWCalculations3
08/13/2026X01302782-P1Open ↗
08/13/2026X01298190-I1Open ↗
08/13/2026X01302782-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026X01302782-I1Open ↗
08/13/2026X01298190-I1Open ↗
08/13/2026X01302782-P1Open ↗