← Back
BuildNYC
Elevator cooperative
1931 MADISON AVENUE
MANHATTAN · BIN 1054006
💬 Discuss this project
1920Year Built
7Stories
D4Building Class
C4-4AZoning
23,380 sfGross Floor Area
28Units
Rent Stabilized96 Active Violations 93 unresolved · 3 paperwork only 3 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · 3,740 sf lot · 6.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Unit 4C1 filing · 2 docs
Floor 3
Floor 2
Floor 1Daily Store interior renovation and hood replacement6p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Avondale Apts HDFC1203/22/2026
Alzanam203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bangash Associates102/26/2023
B4 Architecture106/24/2021
Syed Engineering102/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS Design Studio203/21/2026
Sheikh Expediting203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Great American Construction ServicesGeneral Contractor603/21/2026
Topline NYC ContractingScaffold507/08/2026
Master Fire Prevention Systems IFire Protection103/21/2026
New York Business Fire SystemFire Protection103/21/2026
De Waters Plumbing & HeatingGeneral Contractor110/20/2006
Fire CommandFire Protection210/31/2013
Fire FoeFire Protection106/30/1995
Five Boro SupplyGeneral Contractor110/02/2007
Grace Design & ConstructionGeneral Contractor211/19/2003
Peter BentivegnaPlumbing106/01/1995
Steel IndustriesGeneral Contractor212/04/2007
Teamwork EnterprisesGeneral Contractor106/23/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bangash Associates8488202/26/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/18/2026
Boiler inspection report filed
Initial · defects found · Accepted
07/01/2026
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
M01235907-I1-SC
04/24/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK ASSEMBLIES AT DOOR IN THE ENTRANCE LOCATED AT APT 2A, 2nd STORY, 2nd…
HPD violation · open
04/24/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT…
HPD violation · open
258 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management07/01/2025
DOB NOWGeneral ConstructionSigned-offGreat American Construction Services04/18/2023
DOB NOWGeneral ConstructionSigned-offGreat American Construction Services04/18/2023
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting05/03/2021
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting04/29/2020
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting02/03/2020
BISOTISSUEDTeamwork Enterprises06/23/2020
BISFPISSUEDFire Command10/31/2013
BISFPISSUEDFire Command10/28/2010
BISEQISSUEDSteel Industries12/04/2007
BISOTISSUEDFive Boro Supply10/02/2007
BISBLISSUEDJack Piccini04/09/2007
BISEQISSUEDSteel Industries11/30/2006
BISOTISSUEDDe Waters Plumbing & Heating10/20/2006
BISFPISSUEDNew York Business Fire System01/07/2004
BISOTISSUEDGrace Design & Construction11/19/2003
BISEQISSUEDGrace Design & Construction11/19/2003
BISFPISSUEDMaster Fire Systems03/07/2003
BISFPISSUEDFire Foe06/30/1995
BISPLISSUEDPeter Bentivegna06/01/1995
BISOTISSUEDDiamond Mechanical04/24/1995
BISEQISSUEDDiamond Mechanical04/24/1995
BISFPISSUEDMaster Fire Prevention07/24/1992
BISFPISSUEDMaster Fire Prevention02/06/1991
3 projects · most recent 08/26/2022
FiledStatusContractorScope
08/26/2022Permit IssuedRobert Chimenti—
03/12/2020Permit IssuedL J Electrical Service—
02/03/2020Permit IssuedRichard Neu—
1 project · most recent 06/04/2025
FiledStatusContractorScope
06/04/2025Permit IssuedCentral Construction Management—
Nothing on file for this building.
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account