← Back
BuildNYC
BROOKLYN
1932 ROCKAWAY PARKWAY
BROOKLYN · BIN 3234505
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
25 Active Violations 22 unresolved · 3 paperwork only ▸FDNY Report ↗
Flood zone X500
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
37 Kakawa Realty Holdings103/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D.S. Plumbing and HeatingPlumbing112/30/2011
A.D.S. Plumbing & HeatingGeneral Contractor112/14/2011
Building Lifecycle
02/11/2025
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST…
HPD violation · open
02/11/2025
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING AND EAST WALL IN THE 2nd…
HPD violation · closed
02/11/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st…
HPD violation · open
02/11/2025
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st…
HPD violation · open
02/11/2025
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND EAST WALL IN THE 1st ROOM FROM…
HPD violation · open
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—A.D.S. Plumbing and Heating—
BIS—A.D.S. Plumbing and Heating—
Nothing on file for this building.
Nothing on file for this building.
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account