Primarily 1 family with 1 store or office
1938 CLOVE ROAD
STATEN ISLAND · BIN 5046265
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R3-2Zoning
4,320 sfGross Floor Area
2Units
Rent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 1938 CR LLC · 2,500 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 16 docs
Floor 13p · 1 filing · 19 docs
Cellar1p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING CORP.1703/22/2026
SIMMS PROPERTY 1 CORP103/22/2026
BAY CONSTRUCTION LLC STE303/22/2026
BAY CONSTRUCTION LLC STE4103/22/2026
1938CRLLC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE811/21/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor403/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing307/08/2026
FLOW-RIGHT PLBG HTG CORGeneral Contractor203/22/2026
INNER CITY CONTRACTINGElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683511/21/2024
Building Lifecycle
All (64)Filed (8)Permit Issued (3)Signed Off (3)Violation (13)Inspection (4)Objection (3)Special Inspection (30)
01/16/2026
Objection resolved — Open
12/27/2024
Signed off — Alteration
APPLICATION IS FILED FOR THE SOLE PURPOSE OF OBTAINING CERTIFICATE OF COMPLIANCE. NO WORK TO BE PERFORMED UNDER THIS APPLICATION. ALL MECHANICAL WORK FILED UNDER APPLICATION S00917758. NO CHANGE IN USE EGRESS OR OCCUPANCY.
S01143959-I1
12/26/2024
Objection raised — Scope
12/17/2024
Permit issued — Mechanical Systems
S01143959-I1-MS
11/21/2024
Filed — Alteration
APPLICATION IS FILED FOR THE SOLE PURPOSE OF OBTAINING CERTIFICATE OF COMPLIANCE. NO WORK TO BE PERFORMED UNDER THIS APPLICATION. ALL MECHANICAL WORK FILED UNDER APPLICATION S00917758. NO CHANGE IN USE EGRESS OR OCCUPANCY.
S01143959-I1
11/18/2024
Special inspection requirement — Mechanical Systems
Frank Martarella III
11/18/2024
Special inspection requirement — Final
Frank Martarella III
10/30/2024
Filed — Alteration CO
S01120001-I1
10/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/29/2024
Signed off — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-I1
07/11/2024
Signed off — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-S1
06/06/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/14/2024
Filed — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-P3
05/14/2024
Special inspection requirement — Permanent certificate
Frank Martarella III
05/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
05/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
05/14/2024
Special inspection requirement — Shutoff dampers
Frank Martarella III
05/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
05/14/2024
Special inspection requirement — Lighting controls
Frank Martarella III
05/14/2024
Special inspection requirement — Maintenance information
Frank Martarella III
05/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
05/14/2024
Special inspection requirement — Mechanical Systems
Frank Martarella III
05/14/2024
Special inspection requirement — Final
Frank Martarella III
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/14/2024
Special inspection requirement — Interior lighting power
Frank Martarella III
05/10/2024
Special inspection requirement — Final
Frank Martarella III
05/10/2024
Special inspection requirement — Mechanical Systems
Frank Martarella III
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
05/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
05/10/2024
Special inspection requirement — Maintenance information
Frank Martarella III
05/10/2024
Special inspection requirement — Permanent certificate
Frank Martarella III
05/10/2024
Special inspection requirement — Interior lighting power
Frank Martarella III
05/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
05/10/2024
Special inspection requirement — Shutoff dampers
Frank Martarella III
05/10/2024
Special inspection requirement — Lighting controls
Frank Martarella III
05/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2024
Filed — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-P1
01/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Permit issued — Plumbing
S00917758-S1-PL
11/08/2023
Permit issued — Mechanical Systems
S00917758-I1-GC-CX
08/17/2023
Filed — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-S1
08/16/2023
Filed — Alteration
Application is filed for the interior alteration to existing commercial space at first floor & cellar only at existing 2-story mixed use building. All work as per plans. No change in use, egress or occupancy under this application.
S00917758-I1
09/30/2021
Objection raised — Scope
08/25/2021
Filed — Alteration
Application filed to convert second floor from 1 dwelling unit to 2 dwelling units. Add Additional Res Sink
S00544584-I1
08/25/2021
Filed — Alteration CO
APPLICATION IS FILLED TO CONVERT EXISTING 2-STORY MIXED USE BUILDING FROM (1) DU AT 2ND FLOOR TO (2) DU AT 2ND FLOOR.NO INCREASE IN BULK.
S00539668-I1
08/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
08/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
08/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
04/19/2011
Violation issued (HPD, open)
B
04/19/2011
Violation issued (HPD, open)
B
04/19/2011
Violation issued (HPD, open)
C
03/04/2010
Violation issued (ECB, open)
Construction
09/08/2009
Violation issued (ECB, closed)
Construction
09/08/2009
Violation issued (ECB, closed)
Construction
09/08/2009
Violation issued (ECB, closed)
Construction
04/08/2009
Violation issued (ECB, closed)
Construction
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMP REALTY HOLDING CORP12/17/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/18/2023
DOB NOWMechanical SystemsSigned-offMP REALTY HOLDING CORP11/08/2023
BISMHISSUEDJM MECHANICAL HVAC LLC09/19/2017
BISMHISSUEDMASTER FIRE PREVENTION SY06/18/2009
BISPLISSUEDA SUPERIOR SER AND REPAIR03/13/2009
BISEQISSUEDBAY CONSTRUCTION, LLC11/12/2008
BISMHISSUEDBAY CONSTRUCTION, LLC11/12/2008
BISMHISSUEDRHINO CONSTRUCTION INC10/17/2008
BISEQISSUEDRHINO CONSTRUCTION INC10/17/2008
BISOTISSUEDBAY CONTRACTING INC02/22/2008
1 project · most recent 08/25/2021
Water/Sanitary
FiledStatusContractorScope
08/25/2021——Water/Sanitary
1 project · most recent 08/21/2024
General Wiring
FiledStatusContractorScope
08/21/2024Permit IssuedC.B. MILLS ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/06/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/18/2024Mechanical SystemsFrank Martarella IIIspecial
11/18/2024FinalFrank Martarella IIIprogress
10/23/2024Tenant Protection Plan Compliance—special
05/14/2024Permanent certificateFrank Martarella IIIenergy_progress
05/14/2024HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/14/2024HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
05/14/2024Shutoff dampersFrank Martarella IIIenergy_progress
05/14/2024HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
05/14/2024Lighting controlsFrank Martarella IIIenergy_progress
05/14/2024Maintenance informationFrank Martarella IIIenergy_progress
05/14/2024Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
05/14/2024Mechanical SystemsFrank Martarella IIIspecial
05/14/2024FinalFrank Martarella IIIprogress
05/14/2024Energy Code Compliance InspectionsFrank Martarella IIIprogress
05/14/2024Interior lighting powerFrank Martarella IIIenergy_progress
05/10/2024FinalFrank Martarella IIIprogress
05/10/2024Mechanical SystemsFrank Martarella IIIspecial
05/10/2024Energy Code Compliance InspectionsFrank Martarella IIIprogress
05/10/2024Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
05/10/2024HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/10/2024Maintenance informationFrank Martarella IIIenergy_progress
05/10/2024Permanent certificateFrank Martarella IIIenergy_progress
05/10/2024Interior lighting powerFrank Martarella IIIenergy_progress
05/10/2024HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
05/10/2024Shutoff dampersFrank Martarella IIIenergy_progress
Latest 25 of 31.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026S00544584-I1Request digital key ↗
08/21/2026S00917758-P3Request digital key ↗
08/21/2026S00917758-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION11
09/19/2017540134344Open ↗
06/19/2009520008296Open ↗
06/19/2009520008296Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/20/2017540134344Open ↗
08/29/2017540134344Open ↗
10/29/2009510056948Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026S01120001-I1Open ↗
08/13/2026S00539668-I1Open ↗
08/13/2026S01120001-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/20/2026S01120001-I1Open ↗
08/13/2026S00539668-I1Open ↗
08/13/2026S01120001-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00539668-I1Open ↗
08/25/2026S00544584-I1Open ↗
08/21/2026S00917758-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026S01143959-I1Open ↗
08/27/2026S00917758-P3Open ↗
08/27/2026S00917758-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/30/2017540134344Open ↗
11/23/2009510056948Open ↗
06/19/2009520008296Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S01143959-I1Open ↗
08/27/2026S00917758-P3Open ↗
08/25/2026S00917758-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/14/2008510056948Open ↗
02/15/2008510029354Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/14/2008510056948Open ↗
02/15/2008510029354Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/29/2017540134344Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/29/2017540134344Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/29/2017540134344Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING5
10/29/2009510056948Open ↗
10/16/2009510056948Open ↗
09/25/2009510056948Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
09/30/2009510056948Open ↗
06/12/2009510056948Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/02/2017540134344Open ↗
09/25/2009510056948Open ↗
▸BISEQUIPMENT USE PERMITS1
11/02/2017540134344Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
08/29/2017540134344Open ↗
10/14/2008510056948Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026S01120001-I1Open ↗
08/13/2026S00539668-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/29/2017540134344Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026S00544584-I1Open ↗
08/21/2026S00917758-S1Open ↗
08/21/2026S00917758-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/14/2008510056948Open ↗
02/15/2008510029354Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/16/2009520008296Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/02/2017540134344Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/29/2017540134344Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/30/2017540134344Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/29/2017540134344Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00917758-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/29/2017540134344Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/15/2021510029354Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/15/2021510029354Open ↗
11/02/2017540134344Open ↗
10/30/2017540134344Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/15/2009520008296Open ↗
10/14/2008510056948Open ↗
02/15/2008510029354Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/05/2009510056948Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
10/30/2017540134344Open ↗
08/29/2017540134344Open ↗
11/23/2009510056948Open ↗
Showing 3 of 6 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
09/19/2017540134344Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/15/2021510029354Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
11/02/2017540134344Open ↗
10/30/2017540134344Open ↗
▸BISEFILING COVER SHEET2
06/15/2009520008296Open ↗
10/14/2008510056948Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/29/2017540134344Open ↗
▸BISADDITIONAL INFORMATION1
09/25/2009510056948Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/30/2009510056948Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026S01120001-I1Open ↗