← Back
Zoned residential, not Manhattan
1938 PROSPECT AVENUE
BRONX · Tremont · BIN 2131018
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸
Zoned residential, not Manhattan · Owner of record: 1938 PROSPECT LLC · 2,792 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 20 docs
Penthouse1 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BORI CONSTRUCTION3607/08/2026
1938 PROSPECT304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/08/2024$540K—1938 PROSPECT AVE LLC → Private party— not available
02/15/2024$265K—Private party → 1938 PROSPECT AVE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1112/08/2025
ASR ENGINEERING PC102/20/2025
MJE PROFESSIONAL SERVICES105/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING,CON2003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
NODE ENGINEERING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BORI CONSTRUCTION CORPGeneral Contractor1507/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
TOPLINE NYC INCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795612/08/2025
NODE ARCHITECTURE,ENGINEE6799912/08/2025
Building Lifecycle
All (101)Filed (14)Permit Issued (14)Signed Off (12)Violation (3)Inspection (7)Objection (18)Special Inspection (30)Tax Incentive (3)
02/01/2027
485-x construction completed
04/23/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-I1
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2026
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S5
03/27/2026
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S4
02/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/27/2026
Permit issued — General Construction
X01098027-I1-GC
01/19/2026
Signed off — Alteration
X01045139-I1
01/14/2026
Signed off — Alteration
FILING FOR CONSTRUCTION FENCE. APPLICATION RELATED TO NB #X01098027.
X01114640-I1
01/04/2026
Violation issued (ECB, closed)
Construction
12/17/2025
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S6
12/08/2025
Filed — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-P2
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
12/08/2025
Special inspection requirement — Maintenance information
Radomir Delic
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Radomir Delic
12/08/2025
Special inspection requirement — Shutoff dampers
Radomir Delic
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Radomir Delic
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Radomir Delic
12/08/2025
Special inspection requirement — Final
Radomir Delic
12/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
12/08/2025
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
11/18/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01181407-I1
11/06/2025
Signed off — Alteration
HEREWITH FILING ROOF PROTECTION PLANS IN CONJUCTION WITH NB# X01098027.
X01114647-I1
11/05/2025
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S1
10/06/2025
Violation issued (ECB, closed)
Construction
10/04/2025
Violation issued (ECB, closed)
Cranes and Derricks
09/24/2025
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S3
09/23/2025
Permit issued — Structural
X01098027-S3-ST
09/05/2025
Signed off — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S2
07/17/2025
Permit issued — Sprinklers
X01098027-S5-EW-SP
07/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/15/2025
485-x registration filed
06/06/2025
Permit issued — Plumbing
X01098027-S4-PL
05/21/2025
Permit issued — Construction Fence
X01045139-I1-FN
03/18/2025
Filed — New Building
STURCTURAL APPLICATION BEING FILED FOR NEW 4 STORY RESIDENTIAL BUILDING.
X01098027-S3
02/24/2025
Permit issued — General Construction
X01098027-I1-GC
02/21/2025
Permit issued — Mechanical Systems
X01098027-S6-MS
02/21/2025
Permit issued — Support of Excavation
X01098027-S1-SE
02/20/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01181407-I1
02/20/2025
Permit issued — Sidewalk Shed
X01181407-I1-SH
02/18/2025
Permit issued — Foundation
X01098027-S2-FO
02/18/2025
485-x construction commenced
02/11/2025
Special inspection requirement — Insulation placement and R values
Radomir Delic
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
02/11/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
02/11/2025
Special inspection requirement — Fenestration air leakage
Radomir Delic
02/11/2025
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
02/11/2025
Special inspection requirement — Lighting in dwelling units
Radomir Delic
02/11/2025
Special inspection requirement — Exterior lighting power
Radomir Delic
02/11/2025
Special inspection requirement — Lighting controls
Radomir Delic
02/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
02/11/2025
Special inspection requirement — Fenestration areas
Radomir Delic
02/11/2025
Special inspection requirement — Metering
Radomir Delic
02/11/2025
Special inspection requirement — Maintenance information
Radomir Delic
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBORI CONSTRUCTION CORP01/27/2026
DOB NOWStructuralSigned-offBORI CONSTRUCTION CORP09/23/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C07/17/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/06/2025
DOB NOWConstruction FenceSigned-offBORI CONSTRUCTION CORP05/21/2025
DOB NOWGeneral ConstructionPermit IssuedBORI CONSTRUCTION CORP02/24/2025
DOB NOWMechanical SystemsSigned-offBORI CONSTRUCTION CORP02/21/2025
DOB NOWSupport of ExcavationSigned-offBORI CONSTRUCTION CORP02/21/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC02/20/2025
DOB NOWFoundationSigned-offBORI CONSTRUCTION CORP02/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offBORI CONSTRUCTION CORP10/22/2024
DOB NOWConstruction FenceSigned-offBORI CONSTRUCTION CORP10/22/2024
DOB NOWFull DemolitionSigned-offBORI CONSTRUCTION CORP07/05/2024
DOB NOWConstruction FenceSigned-offBORI CONSTRUCTION CORP05/08/2024
1 project · most recent 12/08/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/08/2025Permit IssuedBORI CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
N/A N/A 9,600 BTU ×80
1 project · most recent 12/08/2025
Sprinkler System
FiledStatusContractorScope
12/08/2025Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 12/08/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/08/2025Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
3 projects · most recent 03/24/2026
General Wiring
FiledStatusContractorScope
03/24/2026CompleteDENNISON ELECTRIC CORPGeneral Wiring
02/18/2026CompleteDENNISON ELECTRIC CORP—
02/22/2025CompleteRICHARD NEU—
1 project · most recent 12/08/2025
Concrete Masonry
FiledStatusContractorScope
12/08/2025Permit IssuedBORI CONSTRUCTION CORPConcrete, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
12/08/2025Fire-Resistant Penetrations and JointsRadomir Delicspecial
12/08/2025Maintenance informationRadomir Delicenergy_progress
12/08/2025HVAC-R and service water piping design and insulationRadomir Delicenergy_progress
12/08/2025Shutoff dampersRadomir Delicenergy_progress
12/08/2025HVAC-R and service water heating system controlsRadomir Delicenergy_progress
12/08/2025HVAC-R and service water heating equipmentRadomir Delicenergy_progress
12/08/2025FinalRadomir Delicprogress
12/08/2025Fire-Resistance Rated ConstructionRadomir Delicprogress
12/08/2025Energy Code Compliance InspectionsRadomir Delicprogress
12/08/2025Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
02/11/2025Insulation placement and R valuesRadomir Delicenergy_progress
02/11/2025Fire-Resistant Penetrations and JointsRadomir Delicspecial
02/11/2025Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
02/11/2025Energy Code Compliance InspectionsRadomir Delicprogress
02/11/2025Fenestration air leakageRadomir Delicenergy_progress
02/11/2025Protection of exposed foundation insulationRadomir Delicenergy_progress
02/11/2025Lighting in dwelling unitsRadomir Delicenergy_progress
02/11/2025Exterior lighting powerRadomir Delicenergy_progress
02/11/2025Lighting controlsRadomir Delicenergy_progress
02/11/2025Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
02/11/2025Fenestration areasRadomir Delicenergy_progress
02/11/2025MeteringRadomir Delicenergy_progress
02/11/2025Maintenance informationRadomir Delicenergy_progress
02/11/2025Air barrier - visual inspectionRadomir Delicenergy_progress
02/11/2025Interior lighting powerRadomir Delicenergy_progress
Latest 25 of 42.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/21/2026X01032182-I1Request digital key ↗
08/21/2026X01045139-I1Request digital key ↗
08/20/2026X01114647-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/14/2025240360676Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/17/2025240360676Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWRestrictive Declaration/Easement 19
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
08/13/2026X01098027-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026X01045139-I1Open ↗
08/20/2026X01114640-I1Open ↗
08/17/2026X01098027-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/25/2026X01098027-S6Open ↗
08/25/2026X01098027-S6Open ↗
08/25/2026X01098027-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026X01098027-P1Open ↗
08/25/2026X01098027-S6Open ↗
08/25/2026X01098027-S6Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/13/2025240360676Open ↗
11/18/2024240360676Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01032182-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01032182-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01032182-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01032182-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01032182-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/16/2025240360676Open ↗
▸BISSTREET TREE CHECKLIST1
01/16/2025240360676Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026X01098027-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026X01098027-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026X01098027-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01032182-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01032182-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/16/2025240360676Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/13/2025240360676Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification3
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
08/13/2026X01032182-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
01/16/2025240360676Open ↗
01/16/2025240360676Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026X01098027-P1Open ↗
08/14/2026X01098027-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01032182-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01032182-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01032182-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026X01098027-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01098027-S1Open ↗