← Back
BuildNYC
Two stories - detached, small or mid-size
Hong Ye Condominium
194-16 DUNTON AVENUE · BIN 4615815
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R1-2Zoning
3,400 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 3861 Realty · 6,510 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar energy system installation on roofUnder Construction1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3861 Realty1603/21/2026
Hong Ye Condo504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Synergic Design Architects102/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Accord PowerGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Synergic Design8561102/19/2026
Building Lifecycle
03/03/2026
Permit renewed — Solar
Renewed without changes
Q01351927-I1-SL
02/23/2026
Permit issued — Solar
Q01351927-I1-SL
02/19/2026
Filed — Alteration
Installation of 8.8 kw solar energy system on roof. No change of occupancy, use or egress.
Q01351927-I1
01/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
12 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAccord Power03/03/2026
DOB NOWSolarPermit IssuedAccord Power02/23/2026
BIS—ISSUEDMega General Construction NYC01/07/2026
BISEQISSUEDMega General Construction NYC01/07/2026
BISPLISSUEDAmerican Standard P&H Cororp03/19/2025
BIS—ISSUEDMega General Construction02/20/2025
BISEQISSUEDMega General Construction02/20/2025
BISPLISSUEDQMB Plumbing & Heating07/16/2019
BIS—RE-ISSUED5D Architect and Engineering06/06/2019
BISEQISSUEDAll State 12 General Cont04/23/2019
BIS—ISSUEDN.Y. Preferred Development07/02/2018
BIS—ISSUEDN.Y. Preferred Development02/07/2018
BISEQISSUEDAll State 12 General Cont01/30/2018
2 projects · most recent 02/20/2026
General Wiring
FiledStatusContractorScope
02/20/2026Permit IssuedAccord Power Electric—
04/29/2019CompleteR & T ElectricalGeneral Wiring
1 project · most recent 02/19/2026
FiledStatusContractorScope
02/19/2026Permit IssuedAccord Power—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/27/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
01/27/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
01/27/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
01/27/2026FinalMalathi Ananthakrishnanprogress
01/27/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
122 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account