← Back
BuildNYC
One story - permanent living quarter
194-25 DUNTON AVENUE
QUEENS · BIN 4223942
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R1-2Zoning
1,760 sfGross Floor Area
1Units
One story - permanent living quarter · 4,900 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
General
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Drywell installation1 filing · 15 docs
Floor 1Drywell installation1 filing · 15 docs
CellarDrywell installation1 filing · 15 docs
Filed — no permit issuedConstruction fence installation1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
John Joseph Glavic, R.A.511/06/2026
Building Lifecycle
11/06/2026
Filed — Alteration CO
MECHANICAL WORK AS PER PLANS.
Q01356850-S7
10/27/2026
Special inspection requirement — Concrete - Cast-In-Place
10/27/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/14/2026
Objection resolved — Resolved
10/14/2026
Special inspection requirement — Footing and Foundation
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 11/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/06/2026——Gas, Storm, Water/Sanitary
1 project · most recent 11/06/2026
Steel Wood
FiledStatusContractorScope
11/06/2026——Steel, Wood
1 project · most recent 05/01/2026
Fence
FiledStatusContractorScope
05/01/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/27/2026Concrete - Cast-In-Place—special
10/27/2026Excavations - Sheeting, Shoring, and Bracing—special
10/14/2026Footing and Foundation—progress
10/14/2026Final—progress
08/20/2026Structural Steel - High Strength Bolting—special
08/20/2026Concrete - Cast-In-Place—special
08/11/2026Maintenance information—energy_progress
08/11/2026HVAC-R and service water piping design and insulation—energy_progress
08/11/2026HVAC-R and service water heating system controls—energy_progress
08/11/2026HVAC-R and service water heating equipment—energy_progress
08/10/2026Structural Cold-Formed Steel—special
08/10/2026Structural Steel - Details—special
08/10/2026Structural Stability – Alterations of existing buildings—special
08/10/2026Final—progress
08/03/2026Permanent certificate—energy_progress
05/01/2026Fire-Resistant Penetrations and Joints—special
02/08/2026Insulation placement and R values—energy_progress
02/08/2026Fire-Resistance Rated Construction—progress
02/08/2026Fire-Resistant Penetrations and Joints—special
02/08/2026Energy Code Compliance Inspections—progress
02/08/2026Fenestration and door U-factor and product ratings—energy_progress
02/08/2026Fenestration air leakage—energy_progress
02/08/2026Maintenance information—energy_progress
02/08/2026Air barrier - visual inspection—energy_progress
02/08/2026Fenestration areas—energy_progress
Latest 25 of 26.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account