Large suburban residence
194-50 DUNTON AVENUE
QUEENS · BIN 4223897
💬 Discuss this project
1950Year Built
2.5Stories
A3Building Class
R1-2Zoning
3,290 sfGross Floor Area
1Units
Large suburban residence · Owner of record: Preferred Homes · 11,557 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
AtticUnder Construction2p · 1 filing · 20 docs
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
Site & exteriorUnder Construction34p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$900K—Private party → PREFERRED HOMES LLC$274/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Banji Awosika Architect507/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Architect1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe Meodspecialty_contractor404/09/2026
Yafe MeodScaffold207/08/2026
Yafe MeodGeneral Contractor104/09/2026
Watermark PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Banji Awosika Architect P2721407/02/2025
Building Lifecycle
07/03/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q01103371-S2-PL
04/25/2026
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
Q01103371-S4-FO-EA
02/04/2026
Permit renewed — Mechanical Systems
Renewed without changes
Q01103371-I1-GC-CX
12/09/2025
Permit renewed — Construction Fence
Renewed without changes
Q01103371-S3-FN
07/03/2025
Permit issued — Plumbing
Q01103371-S2-PL
52 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedYafe Meod02/04/2026
DOB NOWConstruction FencePermit IssuedYafe Meod12/09/2025
DOB NOWPlumbingPermit IssuedWatermark Plumbing07/03/2025
DOB NOWEarth WorkPermit IssuedYafe Meod04/25/2025
DOB NOWConstruction FencePermit IssuedYafe Meod12/03/2024
DOB NOWMechanical SystemsPermit IssuedYafe Meod12/03/2024
1 project · most recent 07/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
07/02/2025Permit IssuedYafe MeodHeating and Air Conditioning Systems
1 project · most recent 07/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/02/2025Permit IssuedWatermark PlumbingGas, Storm, Water/Sanitary
1 project · most recent 03/19/2025
General Wiring
FiledStatusContractorScope
03/19/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 07/02/2025
Masonry Wood
FiledStatusContractorScope
07/02/2025Permit IssuedYafe MeodMasonry, Wood
1 project · most recent 07/02/2025
Earthwork
FiledStatusContractorScope
07/02/2025Permit IssuedYafe MeodEarthwork
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
07/02/2025Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
07/02/2025Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
07/02/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesOLABANJI AWOSIKAspecial
07/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOLABANJI AWOSIKAspecial
05/19/2025MasonryOLABANJI AWOSIKAspecial
04/21/2025Permanent certificate—energy_progress
04/21/2025Metering—energy_progress
04/21/2025Duct leakage testing, insulation and design—energy_progress
03/29/2025MasonryOLABANJI AWOSIKAspecial
03/26/2025HVAC-R and service water heating equipmentOLABANJI AWOSIKAenergy_progress
03/26/2025Mechanical SystemsOLABANJI AWOSIKAspecial
03/26/2025Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
03/26/2025FinalOLABANJI AWOSIKAprogress
03/26/2025Fire-Resistance Rated ConstructionOLABANJI AWOSIKAprogress
03/26/2025Structural Wood FrameOLABANJI AWOSIKAprogress
03/26/2025Fenestration and door U-factor and product ratingsOLABANJI AWOSIKAenergy_progress
03/26/2025Interior lighting powerOLABANJI AWOSIKAenergy_progress
03/26/2025Fenestration air leakageOLABANJI AWOSIKAenergy_progress
03/26/2025HVAC-R and service water heating system controlsOLABANJI AWOSIKAenergy_progress
03/26/2025Electric vehicle service equipment requirementsOLABANJI AWOSIKAenergy_progress
03/26/2025Insulation placement and R valuesOLABANJI AWOSIKAenergy_progress
03/26/2025Air barrier - visual inspectionOLABANJI AWOSIKAenergy_progress
03/26/2025Fenestration areasOLABANJI AWOSIKAenergy_progress
03/26/2025Maintenance informationOLABANJI AWOSIKAenergy_progress
03/26/2025Ventilation and air distribution systemOLABANJI AWOSIKAenergy_progress
Latest 25 of 50.
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account