← Back
BuildNYC
Two family frame
194 BELAIR ROAD
STATEN ISLAND · BIN 5174741
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3AZoning
3,022 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 5,965 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic10p · 3 filings · 13 docs
Floor 214p · 3 filings · 13 docs
Floor 112p · 4 filings · 15 docs
Cellar13p · 3 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect410/07/2021
William Montague Engineering207/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Duo Plumbing & Heatingspecialty_contractor307/08/2026
Oak DevelopersGeneral Contractor107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677207/13/2021
Building Lifecycle
11/08/2021
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & NEW GAS FIXTURES FOR 2 FAMILY RESIDENCE.
S00427002-I1
11/08/2021
Signed off — Alteration
residential sprinkler plans
S00395596-I1
10/25/2021
Signed off — Alteration
INSTALLATION OF NEW 18' WIDE CURB CUT.
S00584207-I1
10/22/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/07/2021
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & NEW GAS FIXTURES FOR 2 FAMILY RESIDENCE.
S00427002-P2
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOak Developers08/30/2021
DOB NOWPlumbingSigned-offQuality Plumbing03/22/2021
DOB NOWSprinklersSigned-offDuo Plumbing & Heating01/13/2021
DOB NOWPlumbingSigned-offDuo Plumbing & Heating01/13/2021
DOB NOWPlumbingSigned-offDuo Plumbing & Heating01/11/2021
BIS—ISSUEDOak Developers09/26/2021
BIS—ISSUEDOak Developers11/12/2020
1 project · most recent 02/05/2021
General Wiring
FiledStatusContractorScope
02/05/2021CompleteTrue ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/22/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/07/2021Sprinkler SystemsWILLIAM MONTAGUEspecial
71 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account