← Back
Five to six families
194 CLARKSON AVENUE
BROOKLYN · East Flatbush-Erasmus · BIN 3116236
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R7-1Zoning
4,575 sfGross Floor Area
6Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 194 BRICKS LLC · 3,182 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire Protection
Roof2p · 1 filing · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP1807/08/2026
194 BRICKS LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/24/2019$1.2M—Private party → 194 BRICKS LLC$262/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC203/02/2023
DOYUN KIM; RA601/10/2023
ADNAN ENGINEERING, P.C.411/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
C A ELECTRICAL CORP 003149General Contractor203/22/2026
PLBG P & H INCPlumbing207/08/2026
C & A ELECTRICAL CORPElectrical103/22/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415703/02/2023
CENTURY TESTING & CONSULT4081311/28/2022
Building Lifecycle
All (104)Filed (12)Permit Issued (4)Signed Off (4)Violation (42)Inspection (8)Objection (4)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2024
Signed off — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, PROPOSED NEW GYPBOARD, UPDATE WINDOWS & INTERIOR FINISHES AS PER PLANS. TO INSTALL MECHANICAL SYSTEMS. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 3 STORY, 6 FAMILY DWELLING
B00496944-I1
06/24/2024
Permit issued — Mechanical Systems
B00496944-I1-MS
04/09/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Signed off — Alteration
New Sprinkler system with water service piping in conjunction with GC/MS application # B00496944 and PL application# B00559003
B00558144-I1
06/14/2023
Violation issued (HPD, closed)
C
06/14/2023
Violation issued (HPD, closed)
C
06/14/2023
Violation issued (HPD, closed)
B
06/01/2023
Signed off — Alteration
B00530167-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, closed)
A
03/20/2023
Signed off — Alteration
HEREWITH FILING TO INSTALL PLUMBING FIXTURES AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B00496944.
B00559003-I1
03/06/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
03/06/2023
Special inspection requirement — Maintenance information
DOYUN KIM
03/02/2023
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING FIXTURES AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B00496944.
B00559003-P2
02/21/2023
Violation issued (HPD, closed)
B
02/21/2023
Violation issued (HPD, closed)
C
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
02/14/2023
Special inspection requirement — Maintenance information
DOYUN KIM
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
01/10/2023
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, PROPOSED NEW GYPBOARD, UPDATE WINDOWS & INTERIOR FINISHES AS PER PLANS. TO INSTALL MECHANICAL SYSTEMS. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 3 STORY, 6 FAMILY DWELLING
B00496944-P3
01/10/2023
Special inspection requirement — Interior lighting power
DOYUN KIM
01/10/2023
Special inspection requirement — Permanent certificate
DOYUN KIM
01/10/2023
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
01/10/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
01/10/2023
Special inspection requirement — Fenestration air leakage
DOYUN KIM
01/10/2023
Special inspection requirement — Maintenance information
DOYUN KIM
01/10/2023
Special inspection requirement — Lighting controls
DOYUN KIM
01/10/2023
Special inspection requirement — Insulation placement and R values
DOYUN KIM
01/10/2023
Special inspection requirement — Final
DOYUN KIM
01/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
01/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
01/10/2023
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
01/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
01/10/2023
Special inspection requirement — Mechanical Systems
DOYUN KIM
01/10/2023
Special inspection requirement — Fenestration areas
DOYUN KIM
01/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
12/09/2022
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
12/09/2022
Special inspection requirement — Post-installed Anchors
ALDO BRAVO
11/28/2022
Filed — Alteration
New Sprinkler system with water service piping in conjunction with GC/MS application # B00496944 and PL application# B00559003
B00558144-P3
11/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2022
Special inspection requirement — Post-installed Anchors
ALDO BRAVO
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/16/2022
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
10/06/2022
Violation issued (HPD, closed)
C
10/06/2022
Violation issued (HPD, closed)
C
08/15/2022
Objection resolved — Addressed
08/11/2022
Objection raised — Mechanical
08/07/2022
Filed — Alteration
New Sprinkler system with water service piping in conjunction with GC/MS application # B00496944 and PL application# B00559003
B00558144-P2
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO06/24/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC04/11/2022
DOB NOWPlumbingSigned-offPLBG P & H INC03/02/2022
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO08/31/2021
1 project · most recent 10/17/2021
General Wiring
FiledStatusContractorScope
10/17/2021CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
03/06/2023Maintenance informationDOYUN KIMenergy_progress
03/06/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
03/06/2023Energy Code Compliance InspectionsDOYUN KIMprogress
02/14/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/14/2023Energy Code Compliance InspectionsDOYUN KIMprogress
02/14/2023Maintenance informationDOYUN KIMenergy_progress
01/10/2023Air barrier - visual inspectionDOYUN KIMenergy_progress
01/10/2023Fenestration areasDOYUN KIMenergy_progress
01/10/2023Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
01/10/2023Lighting in dwelling unitsDOYUN KIMenergy_progress
01/10/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
01/10/2023Mechanical SystemsDOYUN KIMspecial
01/10/2023Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
01/10/2023Energy Code Compliance InspectionsDOYUN KIMprogress
01/10/2023FinalDOYUN KIMprogress
01/10/2023Fire-Resistance Rated ConstructionDOYUN KIMprogress
01/10/2023Permanent certificateDOYUN KIMenergy_progress
01/10/2023Maintenance informationDOYUN KIMenergy_progress
01/10/2023Fenestration air leakageDOYUN KIMenergy_progress
01/10/2023Interior lighting powerDOYUN KIMenergy_progress
01/10/2023Lighting controlsDOYUN KIMenergy_progress
01/10/2023Insulation placement and R valuesDOYUN KIMenergy_progress
12/09/2022Post-installed AnchorsALDO BRAVOspecial
12/09/2022Sprinkler SystemsALDO BRAVOspecial
12/09/2022Fire-Resistant Penetrations and JointsALDO BRAVOspecial
Latest 25 of 79.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026B00496944-P3Request digital key ↗
09/01/2026B00496944-P1Request digital key ↗
09/01/2026B00496944-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026B00496944-P1Open ↗
09/01/2026B00496944-P1Open ↗
09/01/2026B00496944-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026B00496944-P1Open ↗
09/01/2026B00496944-P1Open ↗
09/01/2026B00496944-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00496944-P2Open ↗
09/01/2026B00496944-P1Open ↗
09/01/2026B00496944-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00558144-I1Open ↗
09/01/2026B00558144-P3Open ↗
09/01/2026B00559003-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00496944-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00559003-I1Open ↗
08/13/2026B00496944-I1Open ↗
▸Other Documents19
▸DOB NOWDHCR Document19
08/13/2026B00559003-I1Open ↗
08/13/2026B00559003-P1Open ↗
08/13/2026B00559003-P2Open ↗
Showing 3 of 19 on file for this type