Two family frame
194 SUNNYSIDE AVENUE
BROOKLYN · Cypress Hills · BIN 3086414
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R3-1Zoning
2,554 sfGross Floor Area
2Units
Two family frame · 3,583 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/14/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281101/14/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (5)
07/29/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.97 kW
B01166671-I1
04/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/28/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/17/2025
Permit issued — Solar
B01166671-I1-SL
01/14/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.97 kW
B01166671-I1
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/14/2025
Special inspection requirement — Final
Mina Makar
01/14/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/17/2025
1 project · most recent 01/14/2025
FiledStatusContractorScope
01/14/2025CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/28/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/14/2025Fire-Resistant Penetrations and JointsMina Makarspecial
01/14/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
01/14/2025Energy Code Compliance InspectionsMina Makarprogress
01/14/2025FinalMina Makarprogress
01/14/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01166671-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01166671-I1Open ↗
09/23/2026B01166671-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01166671-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01166671-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01166671-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01166671-I1Open ↗