← Back
BuildNYC
Elevator apt, semi-fireproof with stores
River Crossing Owner
1940 1ST AVENUE · BIN 1083932
💬 Discuss this project
1973Year Built
13Stories
D7Building Class
R7-2Zoning
414,144 sfGross Floor Area
329Units
LL97 CoveredRent Stabilized102 Active Violations 101 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: River Crossing Owner Housing Development Fund · 75,100 sf lot · 5.51 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStaples18p · 4 filings · 20 docs
Floor 1Staples, FedCap72p · 11 filings · 20 docs
Site & exteriorThe Marketplace Deli, Waste Management25p · 6 filings · 20 docs
Filed — no permit issuedCondition assessment2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bsrep UA River Crossing1003/21/2026
Metro North Owners803/21/2026
River Crossing Owner Housing Development Fund503/22/2026
1 RS403/21/2026
Urban American303/21/2026
L+M Development Partners303/21/2026
Atlas Building203/22/2026
Intelligen103/22/2026
River Crossing Owner103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nebula712/05/2025
GRM Consultants107/25/2024
A&B World Consulting305/20/2024
The Rba Group110/25/2023
Inglese Architecture + Engineering303/14/2023
David Sparks206/23/2022
Insight Studio Architecture412/27/2021
Inglese Architecture and Engineering308/20/2021
Ashraf201/05/2021
Joel Phagoo P.E111/11/2020
Architecture by Domani108/07/2020
WRG Engineering108/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
Louis Striar203/21/2026
William Vitacco Associates1803/21/2026
CBA Consultants803/21/2026
A1 Expediting Service203/21/2026
HH Building Consulting & Architectu203/21/2026
Rigid Structural Design103/21/2026
Domani Consulting103/21/2026
WRG Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NGM Vision GroupGeneral Contractor1007/08/2026
Skyline Scaffolding GroupScaffold903/21/2026
Renotech InteriorsGeneral Contractor807/08/2026
Steel SystemsScaffold607/08/2026
Ross & AssociatesGeneral Contractor404/09/2026
L & M Builders GroupGeneral Contractor407/08/2026
4 Brothers & Sons FenceScaffold407/08/2026
A & E PlumbingPlumbing307/08/2026
Power Masters Electrical ContElectrical203/22/2026
M. International EngineeringGeneral Contractor207/08/2026
DV PlumbingPlumbing107/08/2026
C.falco Eletl ContElectrical103/22/2026
EH Plumbing & HeatingPlumbing107/08/2026
George Holness G.CElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
City & County Pavingspecialty_contractor104/09/2026
Energy Building ConstructionGeneral Contractor107/08/2026
Tru-Art Sign CoSign hanger107/08/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
Ami and AssociatesFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431312/05/2025
A&B World Consulting5704305/20/2024
M. International Engineering3129208/06/2021
WRG Engineering4403108/29/2019
Building Lifecycle
All (199)Filed (30)Permit Issued (37)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (15)Special Inspection (30)
08/11/2026
Violation issued (HPD, closed)
C
06/17/2026
Violation issued (HPD, closed)
B
06/17/2026
Violation issued (HPD, closed)
B
06/17/2026
Violation issued (HPD, closed)
B
06/12/2026
Violation issued (HPD, closed)
B
06/08/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, closed)
B
06/08/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, closed)
A
06/08/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, closed)
A
06/08/2026
Violation issued (HPD, closed)
C
06/02/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01410703-I1
05/14/2026
Violation issued (HPD, closed)
B
05/14/2026
Violation issued (HPD, closed)
B
05/14/2026
Violation issued (HPD, closed)
C
05/14/2026
Violation issued (HPD, closed)
B
05/13/2026
Violation issued (HPD, open)
C
05/13/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, closed)
A
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, open)
B
05/04/2026
Violation issued (HPD, closed)
B
04/09/2026
Violation issued (HPD, closed)
B
03/31/2026
Violation issued (HPD, closed)
C
02/26/2026
Violation issued (HPD, closed)
A
02/26/2026
Violation issued (HPD, closed)
A
02/26/2026
Violation issued (HPD, closed)
B
02/26/2026
Violation issued (HPD, closed)
B
02/26/2026
Violation issued (HPD, closed)
A
02/26/2026
Violation issued (HPD, closed)
A
02/06/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
A
01/06/2026
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, closed)
C
12/29/2025
Signed off — Alteration
M01158658-I1
12/29/2025
Signed off — Alteration
M01158658-S2
12/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/28/2025
Special inspection requirement — Final
Samuel Lee
12/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
12/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Samuel Lee
12/05/2025
Filed — Alteration
M01158658-P4
12/05/2025
Filed — Alteration
M01158658-P3
12/05/2025
Violation issued (HPD, closed)
A
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JOHN MCMONAGLE
12/05/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
12/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Samuel Lee
12/05/2025
Special inspection requirement — Final
Samuel Lee
12/05/2025
Special inspection requirement — Final
Samuel Lee
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
11/21/2025
Violation issued (HPD, closed)
A
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAmi and Associates07/30/2025
DOB NOWMechanical SystemsPermit IssuedM. International Engineering05/28/2025
DOB NOWPlumbingSigned-offA & E Plumbing05/22/2025
DOB NOWPlumbingSigned-offA & E Plumbing05/09/2025
DOB NOWGeneral ConstructionSigned-offRoss & Associates04/21/2025
DOB NOWMechanical SystemsSigned-offRoss & Associates04/17/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating01/17/2025
DOB NOWSignSigned-offTru-Art Sign Co07/25/2024
DOB NOWEarth WorkSigned-offLeeding Builders Group LC04/01/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating03/11/2024
DOB NOWGeneral ConstructionPermit IssuedM. International Engineering02/16/2024
DOB NOWFoundationSigned-offL & M Builders Group02/01/2024
DOB NOWGeneral ConstructionSigned-offL & M Builders Group01/31/2024
DOB NOWGeneral ConstructionSigned-offRoss & Associates05/12/2023
DOB NOWPlumbingSigned-offA & E Plumbing05/11/2023
DOB NOWStructuralSigned-offL & M Builders Group07/16/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/09/2022
DOB NOWGeneral ConstructionSigned-offNGM Vision Group01/12/2022
DOB NOWMechanical SystemsPermit IssuedNGM Vision Group01/12/2022
DOB NOWConstruction FenceSigned-off4 Brothers Sons Fence01/06/2022
DOB NOWGeneral ConstructionSigned-offRenotech Interiors11/26/2021
DOB NOWMechanical SystemsSigned-offRenotech Interiors11/26/2021
DOB NOWMechanical SystemsSigned-offRenotech Interiors08/31/2021
DOB NOWPlumbingSigned-offEH Plumbing & Heating08/23/2021
DOB NOWPlumbingSigned-offDV Plumbing08/11/2021
DOB NOWGeneral ConstructionSigned-offRenotech Interiors08/05/2021
DOB NOWConstruction FenceSigned-off4 Brothers Sons Fence07/22/2021
DOB NOWMechanical SystemsPermit IssuedNGM Vision Group07/15/2021
DOB NOWGeneral ConstructionSigned-offNGM Vision Group07/15/2021
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/11/2021
DOB NOWSupported ScaffoldPermit IssuedSteel Systems03/31/2021
DOB NOWSupported ScaffoldPermit IssuedSteel Systems01/06/2021
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group11/12/2020
DOB NOWConstruction FenceSigned-off4 Brothers Sons Fence08/19/2020
DOB NOWStructuralPermit IssuedEnergy Building Construction09/05/2019
DOB NOWSidewalk ShedPermit IssuedSteel Systems05/02/2019
DOB NOWSidewalk ShedPermit IssuedSteel Systems01/24/2019
BISMHISSUEDHenry Myers Plumbing & H04/12/2023
BISPLISSUEDHenry Myers P & H03/07/2023
BISOTISSUEDL & M Builders Group03/01/2023
+ 42 more permits on file
1 project · most recent 08/20/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2021Permit IssuedNew Green Movement InternationalAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin FXMQ24PBVJU 2 tons · Vrf Indoor ×4
FXFQ15TVJU 1 tons · Vrf Indoor ×2
FXMQ12PBVJU 1 tons · Vrf Indoor ×2
Heating
Daikin RXLQ96TATJA 8 tons · Vrf Outdoor ×2
Ventilation
Greenheck ECV-10H-FM 900 CFM · Erv ×2
1 project · most recent 05/20/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offAll Pro Plumbing & HeatingGas, Water/Sanitary
13 projects · most recent 09/09/2024
General Wiring
FiledStatusContractorScope
09/09/2024CompleteC.falco Eletl ContGeneral Wiring
03/10/2022CompleteNGM ElectricGeneral Wiring
01/18/2022CompleteMikoma ElectricGeneral Wiring
07/03/2021Permit IssuedRobert Chimenti3 meters, 1 new_meters
05/05/2021CancelledNGM ElectricGeneral Wiring
11/11/2020Permit IssuedTop Shelf Electric—
04/23/2020Permit IssuedPower Masters Electrical ContGeneral Wiring
04/23/2020Permit IssuedPower Masters Electrical ContGeneral Wiring
04/23/2020Permit IssuedPower Masters Electrical ContGeneral Wiring
01/21/2019CompleteWalton Electrical Construction—
10/30/2018CancelledTop Shelf Electric—
10/30/2018CompleteTop Shelf Electric—
10/03/2018CompleteTop Shelf Electric—
1 project · most recent 08/29/2019
Steel
FiledStatusContractorScope
08/29/2019Permit IssuedEnergy Building ConstructionSteel
1 project · most recent 01/05/2021
Scaffold
FiledStatusContractorScope
01/05/2021Permit IssuedSteel SystemsScaffold
1 project · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026———
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/29/2021Fail-Final General Construction Non-Directive 14FailView ↗
11/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/24/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
12/28/2025Fire-Resistance Rated ConstructionSamuel Leeprogress
12/28/2025FinalSamuel Leeprogress
12/28/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/28/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
12/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/05/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
12/05/2025FinalSamuel Leeprogress
12/05/2025Fire-Resistance Rated ConstructionSamuel Leeprogress
12/05/2025Tenant Protection Plan Compliance—special
12/05/2025Exhaust and Vent Systems in Plenums and DuctsJOHN MCMONAGLEspecial
12/05/2025Mechanical SystemsJOHN MCMONAGLEspecial
12/05/2025FinalSamuel Leeprogress
09/17/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
09/17/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
08/28/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
08/28/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
07/25/2024FinalGHANENDRA MISHRAprogress
05/20/2024Energy Code Compliance InspectionsAlexander Bomsteinprogress
05/20/2024Tenant Protection Plan ComplianceAlexander Bomsteinspecial
05/20/2024HVAC-R and service water piping design and insulationAlexander Bomsteinenergy_progress
05/17/2024Mechanical SystemsAlexander Bomsteinspecial
05/17/2024FinalAlexander Bomsteinprogress
01/03/2024Energy Code Compliance InspectionsAlexander Bomsteinprogress
01/03/2024Tenant Protection Plan ComplianceAlexander Bomsteinspecial
01/03/2024Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
Latest 25 of 65.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Marketplace DeliRestaurant / Food Service—
Project M01080051 Alteration · LOC Issued · 07/25/2024
Waste ManagementIndustrial / Warehouse—
Project M00921558 Alteration · LOC Issued · 10/25/2023
StaplesRetailFloor 1, Roof
Project M00740217 Alteration · LOC Issued · 06/23/2022
Project M00740228 Alteration · LOC Issued · 06/23/2022
FedCapOfficeFloor 1
Project M00558570 Alteration · LOC Issued · 07/19/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 458 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch20
09/03/2026M00558570-I1Request digital key ↗
09/03/2026M00571449-P1Request digital key ↗
09/03/2026M00571449-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00477179-I1Request digital key ↗
08/15/2026M00477179-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/31/2026M00477164-I1Request digital key ↗
08/31/2026M00477164-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00122429-I1Request digital key ↗
09/04/2026M00426771-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00477185-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00199061-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00329893-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00447327-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION53
07/14/2025123776173Open ↗
04/14/2025123776173Open ↗
04/14/2025123776173Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION35
08/26/2020123817432Open ↗
08/05/2019123776173Open ↗
08/05/2019123776173Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/04/2022123817432Open ↗
11/18/2021123776173Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE COMPLIANCE1
08/08/2025123776173Open ↗
▸Seals & Professional Certifications123
▸DOB NOWProgress Inspector Seal & Signature32
09/05/2026M01158658-P4Open ↗
09/05/2026M00921558-I1Open ↗
08/31/2026M00571524-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/05/2026M00199061-I1Open ↗
09/03/2026M00477185-I1Open ↗
09/03/2026M00571449-I1Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
08/26/2019123564446Open ↗
08/12/2019123564446Open ↗
07/12/2019123776173Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/05/2026M01158658-P4Open ↗
09/05/2026M00921558-I1Open ↗
09/05/2026M00921558-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
04/14/2025123776173Open ↗
11/18/2021123776173Open ↗
07/12/2019123776173Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/12/2019123776173Open ↗
12/20/2018140822322Open ↗
05/21/2018123564446Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/20/2018140822322Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/20/2018140822322Open ↗
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING9
11/18/2021123776173Open ↗
12/20/2018140822322Open ↗
Showing 2 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/12/2019123776173Open ↗
01/27/2017123003971Open ↗
10/16/2015120160805Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/08/2025123776173Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/08/2025123776173Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes5
07/12/2019123776173Open ↗
05/21/2018123564446Open ↗
01/27/2017123003971Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00199061-I1Open ↗
08/13/2026M00329893-I1Open ↗
08/13/2026M00426771-I1Open ↗
▸BISSTREET TREE CHECKLIST2
01/27/2017123003971Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/03/2026M00477185-I1Open ↗
09/03/2026M00571449-P1Open ↗
09/03/2026M00571449-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/12/2019123776173Open ↗
12/20/2018140822322Open ↗
05/21/2018123564446Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/18/2020123817432Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/05/2026M00199061-I1Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
07/12/2019123776173Open ↗
05/09/2019123564446Open ↗
05/21/2018123564446Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/04/2025123776173Open ↗
11/18/2021123776173Open ↗
08/26/2020123817432Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00571524-I1Open ↗
08/13/2026M00558570-I1Open ↗
08/13/2026M00477164-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/26/2019123564446Open ↗
01/29/2015121769265Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/08/2025123776173Open ↗
10/02/2023123817432Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/08/2013121769265Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/20/2018140822322Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/02/2023123817432Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/02/2023123817432Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/18/2021123776173Open ↗
08/21/2020123817432Open ↗
07/18/2020123817432Open ↗
Showing 3 of 4 on file for this type
▸BISMECHANICAL SYSTEMS1
08/08/2025123776173Open ↗
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/13/2025123776173Open ↗
11/03/2023123817432Open ↗
08/26/2019123564446Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/30/2020123817432Open ↗
08/09/2017122820947Open ↗
09/29/2016120160805Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
05/27/2016120160805Open ↗
05/27/2016120160805Open ↗
01/25/2016120160805Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/02/2026M00740217-I1Open ↗
08/13/2026M00732655-I1Open ↗
08/13/2026M00740228-I1Open ↗
▸BISFINAL2
08/08/2025123776173Open ↗
11/03/2023123817432Open ↗
▸BISSHED LETTER1
04/02/2014121740205Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
11/18/2021123776173Open ↗
07/18/2020123817432Open ↗
04/27/2020123817432Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/12/2025123776173Open ↗
10/12/2023123817432Open ↗
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION25
11/14/2023123776173Open ↗
04/14/2023123776173Open ↗
06/28/2022123776173Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET14
07/18/2020123817432Open ↗
07/12/2019123776173Open ↗
05/21/2018123564446Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM5
04/27/2020123817432Open ↗
04/27/2020123817432Open ↗
08/26/2019123564446Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet3
12/20/2018140822322Open ↗
Showing 1 of 3 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISUnknown2
03/27/2020123817432Open ↗
03/27/2020123817432Open ↗
▸BISMAINTENANCE INFORMATION1
08/08/2025123776173Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
08/09/2017122820947Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
10/02/2023123817432Open ↗
▸DOB NOWIRA Certification1
08/17/2026M01410703-I1Open ↗