RoofUnder Construction42p · 2 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Plumbing
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 10 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
3 documents · 1 drawing sheet
BulkheadUnder Construction1p · 1 filing · 16 docs
Equipment
Installation of suspended scaffold for facade work or inspection.
On file for this project
16 documents · 1 drawing sheet
Floor 7Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 6Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 5Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 4Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 3Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 2Under Construction23p · 1 filing · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 1 drawing sheet
Floor 1Under Construction31p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
Boiler Equipment
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 9 drawing sheets
CellarUnder Construction45p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Plumbing
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 14 drawing sheets
Site & exteriorUnder Construction107p · 3 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed
REPLACE EXISTING FIXTURES AND EQUIPMENT WITH NEW AS DIRECTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
55 documents · 12 drawing sheets
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
On file for this project
1 document · 2 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
3 documents · 5 drawing sheets
Filed — no permit issued22p · 1 filing · 4 docs
ArchitectureCivilElectricalGeneral
NYCHA TAFT Rehab Bldg 03, Roof repairs as per the plans filed including: Removal & replacement of roofing system, damaged & new plywood decking, doors and roof drains. New guardrail. Skylight replacement. New cement plaster finishes.
On file for this project
4 documents · 12 drawing sheets