Elevator apt, semi-fireproof with stores
La Olazul
1940 JEROME AVENUE · BIN 2129813
💬 Discuss this project
2025Year Built
13Stories
D7Building Class
C4-4DZoning
97,704 sfGross Floor Area
117Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 1940 JEROME AVE HOLDINGS LLC · 10,852 sf lot · 9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof74p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 10 docs
Floor 1313p · 1 filing · 20 docs
Floor 1212p · 1 filing · 20 docs
Floor 1112p · 1 filing · 20 docs
Floor 1012p · 1 filing · 20 docs
Floor 912p · 1 filing · 20 docs
Floor 812p · 1 filing · 20 docs
Floor 712p · 1 filing · 20 docs
Floor 612p · 1 filing · 20 docs
Floor 512p · 1 filing · 20 docs
Floor 465p · 1 filing · 20 docs
Floor 366p · 1 filing · 20 docs
Floor 267p · 1 filing · 20 docs
Floor 170p · 1 filing · 20 docs
Cellar68p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1940 JEROME AVE HOLDINGS LLC809/13/2026
SKYLINE SCAFFOLDING GROUP807/08/2026
JEROME AVENUE SM REALTY1407/08/2026
VOREA CONSTRUCTION CO203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2024$7.4M—SRC PROPERTY ACQUISITIONS LLC → 1940 JEROME AVE HOLDINGS LLC— not available
08/22/2018$1.9M—— → —— not available
05/16/2016$550K—Private party → ALLIED XV LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor807/08/2026
THE VOREA CONSTRUCTION COGeneral Contractor707/08/2026
CMA PLUMBING & HEATING INFire Protection607/08/2026
COSTELLO CONSTRUCTION GROGeneral Contractor204/09/2026
SUPREME MECH NYC LLCPlumbing207/08/2026
ACCORD POWER INCGeneral Contractor104/09/2026
BAYPORT CONSTRUCTION CORP.General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681006/03/2026
SYNERGIC DESIGN LLC8561104/21/2025
CITYSCAPE ENGINEERING, PL5517409/03/2024
H & O ENGINEERING, DPC5595204/03/2024
Building Lifecycle
All (169)Filed (38)Permit Issued (35)Signed Off (7)Violation (2)Inspection (22)Objection (35)Special Inspection (30)
08/20/2026
Signed off — Alteration
INSTALLATION OF 53.46 KW SOLAR ENERGY SYSTEM ON ROOF. NO CHANGE OF OCCUPANCY, USE OR EGRESS.
X01211421-I1
07/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Vestibules
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Air barrier continuity plan testing
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
07/24/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
07/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/29/2026
Objection raised — Other
06/17/2026
Permit issued — General Construction
X00787559-I1-GC
06/03/2026
Filed — New Building
HUB CONSULTATION MEETING HELD AND ACCEPTED ON 8/8/2022. PROPOSE NEW 13-STORY PLUS CELLAR MIXED-USE BUILDING. OBTAIN NEW C OF O. THIS PROJECT IS MANDATORY INCLUSIONARY, 100% LOW INCOME HOUSING, AND QUALITY HOUSING.
X00787559-A1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01127777-I1
05/27/2026
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Vestibules
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
05/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2026
Permit issued — Construction Fence
X01086384-I1-FN
05/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/22/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/10/2026
Filed — New Building
HUB CONSULTATION MEETING HELD AND ACCEPTED ON 8/8/2022. PROPOSE NEW 13-STORY PLUS CELLAR MIXED-USE BUILDING. OBTAIN NEW C OF O. THIS PROJECT IS MANDATORY INCLUSIONARY, 100% LOW INCOME HOUSING, AND QUALITY HOUSING.
X00787559-P7
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2026
Signed off — Alteration
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
X01081403-I1
03/03/2026
Filed — New Building
HUB CONSULTATION MEETING HELD AND ACCEPTED ON 8/8/2022. PROPOSE NEW 13-STORY PLUS CELLAR MIXED-USE BUILDING. OBTAIN NEW C OF O. THIS PROJECT IS MANDATORY INCLUSIONARY, 100% LOW INCOME HOUSING, AND QUALITY HOUSING.
X00787559-P6
02/18/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01086372-I1
02/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/06/2026
Permit issued — Supported Scaffold
X01127777-I1-SF
01/22/2026
Permit issued — Standpipe
X00787559-S3-EW-SD
01/22/2026
Permit issued — Sprinklers
X00787559-S3-EW-SP
12/17/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
12/17/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/09/2025
Permit issued — Mechanical Systems
X00787559-S1-MS
12/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01127777-P4
11/18/2025
Signed off — Alteration
EQUIPMENT USE: DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
X01111863-I1
11/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/17/2025
Permit issued — Plumbing
X00787559-S2-PL
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTHE VOREA CONSTRUCTION CO06/17/2026
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWSupported ScaffoldSigned-offBPRT CONSTRUCTION OF NY02/06/2026
DOB NOWStandpipePermit IssuedCMA PLUMBING & HEATING IN01/22/2026
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN01/22/2026
DOB NOWMechanical SystemsSigned-offTHE VOREA CONSTRUCTION CO12/09/2025
DOB NOWPlumbingSigned-offSUPREME MECH NYC LLC10/17/2025
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN09/04/2025
DOB NOWGeneral ConstructionPermit IssuedTHE VOREA CONSTRUCTION CO09/02/2025
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP08/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP07/31/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP07/29/2025
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP07/02/2025
DOB NOWGeneral ConstructionPermit IssuedTHE VOREA CONSTRUCTION CO06/27/2025
DOB NOWStructuralSigned-offTHE VOREA CONSTRUCTION CO06/06/2025
DOB NOWSolarSigned-offACCORD POWER INC06/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN01/16/2025
DOB NOWStandpipePermit IssuedCMA PLUMBING & HEATING IN01/16/2025
DOB NOWStructuralSigned-offTHE VOREA CONSTRUCTION CO01/07/2025
DOB NOWGeneral ConstructionPermit IssuedTHE VOREA CONSTRUCTION CO01/03/2025
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP12/31/2024
DOB NOWPlumbingSigned-offSUPREME MECH NYC LLC10/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP09/24/2024
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN08/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP08/13/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP08/08/2024
DOB NOWFoundationSigned-offTHE VOREA CONSTRUCTION CO08/06/2024
DOB NOWFoundationSigned-offTHE VOREA CONSTRUCTION CO08/05/2024
DOB NOWSupport of ExcavationPermit IssuedTHE VOREA CONSTRUCTION CO08/05/2024
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP07/29/2024
DOB NOWFull DemolitionSigned-offCOSTELLO CONSTRUCTION GRO06/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offCOSTELLO CONSTRUCTION GRO05/24/2024
DOB NOWConstruction FenceSigned-offCOSTELLO CONSTRUCTION GRO04/24/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC04/22/2024
8 projects · most recent 03/10/2026
General Wiring
FiledStatusContractorScope
03/10/2026Permit IssuedRGF ELECTRIC CORPGeneral Wiring
01/13/2026CompleteACCORD POWER ELECTRIC LLC—
02/25/2025Permit IssuedRGF ELECTRIC CORP—
02/21/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
09/20/2024Permit IssuedRGF ELECTRIC CORP—
07/22/2024Permit IssuedRGF ELECTRIC CORP1 meters, 1 new_meters
07/16/2024CompleteTOP SHELF ELECTRIC CORP—
04/16/2024CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 06/03/2026
Concrete
FiledStatusContractorScope
06/03/2026Permit IssuedTHE VOREA CONSTRUCTION COConcrete
1 project · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025Signed-offACCORD POWER INC132 panels, 53.46 kw, 6,650.3 roof_area_sqft
3 projects · most recent 12/08/2025
Fence Scaffold
FiledStatusContractorScope
12/08/2025Signed-offBPRT CONSTRUCTION OF NYScaffold
09/05/2025Permit IssuedSKYLINE SCAFFOLDING GROUPFence
05/17/2024Signed-offCOSTELLO CONSTRUCTION GROFence
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
07/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/22/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/16/2026Pass-Final PL - UndergroundPassView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/05/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/01/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
07/24/2026Exterior Insulation and Finish Systems (EIFS)SOORJBALLY HARILALLspecial
07/24/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
07/24/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/24/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
07/24/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/24/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
07/24/2026MeteringSOORJBALLY HARILALLenergy_progress
07/24/2026Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
07/24/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
07/24/2026VestibulesSOORJBALLY HARILALLenergy_progress
07/24/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
07/24/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
07/24/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
07/24/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
07/24/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
07/24/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
07/24/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
07/24/2026Air barrier continuity plan testingSOORJBALLY HARILALLenergy_progress
07/24/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
07/24/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
07/24/2026Air barrier — testing SOORJBALLY HARILALLenergy_progress
05/27/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
05/27/2026Exterior Insulation and Finish Systems (EIFS)SOORJBALLY HARILALLspecial
05/27/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/27/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
Latest 25 of 114.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/21/2026X00862805-S2Request digital key ↗
08/21/2026X00862805-S1Request digital key ↗
08/21/2026X00862805-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/13/2026X00787559-I1Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026X00787559-A1Open ↗
08/13/2026X00787559-I1Open ↗
08/13/2026X00787559-P8Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026X00787559-A1Open ↗
08/13/2026X00787559-I1Open ↗
08/13/2026X00787559-P8Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00787559-I1Open ↗
▸Seals & Professional Certifications79
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/21/2026X00862805-I1Open ↗
08/21/2026X01036441-I1Open ↗
08/21/2026X01086384-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/21/2026X00862805-I1Open ↗
09/21/2026X00862805-I1Open ↗
09/21/2026X00862805-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026X00787559-S4Open ↗
09/01/2026X00787559-A1Open ↗
09/01/2026X00787559-A1Open ↗
Showing 3 of 20 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00787559-I1—
▸DOB NOWWater Cut-Off1
08/13/2026X00862805-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X00862805-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00787559-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X00862805-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X00862805-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/15/2026X00787559-A1Open ↗
08/13/2026X00787559-P8Open ↗
08/13/2026X00787559-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00787559-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00787559-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWOER: Notice to Proceed19
08/16/2026X00787559-I1Open ↗
08/16/2026X00787559-I1Open ↗
08/16/2026X00787559-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/16/2026X00787559-S6Open ↗
08/13/2026X00787559-S2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00862805-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X00862805-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00787559-S8Open ↗
08/13/2026X00787559-S4Open ↗
▸Filing & Intake Forms2
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026X01111863-P1Open ↗
08/16/2026X01111863-P2Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification4
08/21/2026X00862805-I1Open ↗
08/16/2026X00787559-I1Open ↗
08/15/2026X00787559-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026X00787559-A1Open ↗
08/13/2026X00787559-P8Open ↗
08/13/2026X00787559-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/15/2026X00787559-A1Open ↗
08/13/2026X00787559-I1Open ↗
08/13/2026X00787559-P8Open ↗
▸DOB NOWStructure Photographs2
08/21/2026X00862805-I1Open ↗
08/13/2026X00862805-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00787559-S6Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X00862805-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X00862805-I1Open ↗