← Back
BuildNYC
Two stories - detached, small or mid-size
1944 GILDERSLEEVE AVENUE
BRONX · BIN 2019997
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3AZoning
1,200 sfGross Floor Area
1Units
3 Active Violations ▸
Two stories - detached, small or mid-size · Owner of record: 1944 A.L. and I · 2,500 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Application Filed to Enlarge at Rear and Convert 1 to 2 FamiUnder Construction6p · 2 filings · 13 docs
Floor 1Application Filed to Enlarge at Rear and Convert 1 to 2 FamiUnder Construction6p · 2 filings · 13 docs
CellarApplication Filed to Enlarge at Rear and Convert 1 to 2 FamiUnder Construction11p · 2 filings · 13 docs
Site & exteriorApplication Filed to Enlarge at Rear and Convert 1 to 2 FamiUnder Construction2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AL I909/17/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Haym S. Gross, Architect308/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Britz Enterprises603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Expert Fire Sprinklerspecialty_contractor107/08/2026
Expert Fire SprinklerScaffold104/09/2026
Plumbing-It MechanicalPlumbing109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rike Tech Associates2965108/07/2025
Building Lifecycle
09/16/2026
Permit issued — Plumbing
X01267630-I1-PL
06/11/2026
At time of inspection observed active construction site. House mainly wooden structure making it a fire hazard. Observed no fire extinguishers on…
ECB violation · closed
06/11/2026
At time of inspection observed active construction site which requires construction workers to posses site safety training. Upon requesting sst to…
ECB violation · open
06/11/2026
At time of inspection observed active construction activities on second floor. Upon entering site notice there is no safe/ unobstructed mean of…
ECB violation · open
06/11/2026
At time of inspection notice active site upon requesting the following require documents they were not provided. Pre-shifts, site specific safety…
ECB violation · open
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPlumbing-It Mechanical09/16/2026
DOB NOWMechanical SystemsPermit IssuedExpert Fire Sprinkler04/15/2026
DOB NOWConstruction FencePermit IssuedExpert Fire Sprinkler04/02/2026
1 project · most recent 08/07/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
08/07/2025Permit IssuedExpert Fire SprinklerAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026Permit IssuedAxon Electrical ContractingGeneral Wiring
1 project · most recent 08/07/2025
Wood
FiledStatusContractorScope
08/07/2025Permit IssuedExpert Fire SprinklerWood
1 project · most recent 08/07/2025
Fence
FiledStatusContractorScope
08/07/2025Permit IssuedExpert Fire SprinklerFence
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/25/2025MeteringSYED RIZVIenergy_progress
09/25/2025Concrete - Cast-In-PlaceSYED RIZVIspecial
09/25/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
09/25/2025Subgrade InspectionsSYED RIZVIspecial
09/25/2025Subsurface Investigations (Borings/Test Pits)SYED RIZVIspecial
09/25/2025Permanent certificateSYED RIZVIenergy_progress
09/25/2025Energy Code Compliance InspectionsSYED RIZVIprogress
09/25/2025Fire-Resistance Rated ConstructionSYED RIZVIprogress
09/25/2025Structural Wood FrameSYED RIZVIprogress
09/04/2025Air barrier - visual inspectionSYED RIZVIenergy_progress
09/04/2025Fenestration areasSYED RIZVIenergy_progress
09/04/2025Maintenance informationSYED RIZVIenergy_progress
09/04/2025Insulation placement and R valuesSYED RIZVIenergy_progress
09/04/2025Interior lighting powerSYED RIZVIenergy_progress
09/04/2025Fenestration air leakageSYED RIZVIenergy_progress
09/04/2025Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
08/28/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
08/01/2025Footing and FoundationSYED RIZVIprogress
08/01/2025HVAC-R and service water piping design and insulationSYED RIZVIenergy_progress
08/01/2025HVAC-R and service water heating system controlsSYED RIZVIenergy_progress
08/01/2025HVAC-R and service water heating equipmentSYED RIZVIenergy_progress
08/01/2025Mechanical SystemsSYED RIZVIspecial
08/01/2025FinalHAYM GROSSprogress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account