← Back
Three families
1945 63 STREET
BROOKLYN · BIN 3132882
💬 Discuss this project
1910Year Built
2.75Stories
C0Building Class
R5Zoning
1,128 sfGross Floor Area
3Units
Rent Stabilized23 Open Violations 21 unresolved · 2 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 1945 63 STREET LLC · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 1 filing · 20 docs
Floor 3Under Construction17p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1Under Construction17p · 1 filing · 20 docs
CellarUnder Construction34p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS509/26/2026
GREENLINE BLDG CONSULTANTS304/09/2026
1945 63 STREET LLC103/22/2026
DF CUSTOM BUILDERS DEV103/22/2026
UPPERLEVEL CONSTRUCTION103/22/2026
RGR CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2023$1.9M—— → —$1,684/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE208/04/2025
ASHRAF CORP103/17/2025
LESTER KATZ, NCARB108/14/2024
ELEVATED ENGINEERING NYC101/19/2024
ACV DESIGN LTD107/18/2023
LESLIE M. GOOD ARCHITECTS105/12/2023
RUGGIERO AND ASSOCIATES LTD102/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA303/21/2026
AVALON DESIGNS403/21/2026
RUGGIERO AND ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DF CUSTOM BUILDERS & DEVGeneral Contractor607/08/2026
CDF CUSTOM BUILDERS INCGeneral Contractor407/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor209/26/2026
KISHAN PLUMBING INCPlumbing207/08/2026
THIRD GENERATION ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252408/04/2025
SHAHRISH SHUVO ENGINEERIN8524105/12/2023
Building Lifecycle
All (136)Filed (8)Permit Issued (12)Signed Off (2)Violation (27)Inspection (8)Objection (62)Special Inspection (17)
09/25/2026
Permit issued — Supported Scaffold
B01149500-I1-SF
08/21/2026
Violation issued (ECB, open)
Construction
05/26/2026
Signed off — Alteration
NEW CONCRETE FOUNDATION AND FOOTINGS
B00871612-I1
05/01/2026
Violation issued (HPD, open)
A
04/16/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2026
Permit issued — Plumbing
B00906012-S1-PL
03/17/2026
Permit issued — Earth Work
B00871612-I1-FO-EA
01/14/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/15/2025
Permit issued — Structural
B00906012-I1-GC-CX
11/20/2025
Signed off — Alteration
Mechanical work filed in conjunction with Alteration 322065171
B00906012-S2
11/19/2025
Permit issued — Support of Excavation
B00906012-S2-SE
11/18/2025
Violation issued (HPD, open)
I
11/07/2025
Violation issued (ECB, open)
Construction
09/05/2025
Permit issued — Mechanical Systems
B00906012-S4-MS
09/03/2025
Permit issued — Earth Work
B00906012-I1-GC-CX
09/02/2025
Permit issued — Construction Fence
B00906012-S3-FN
08/04/2025
Filed — Alteration
Mechanical work filed in conjunction with Alteration 322065171
B00906012-S4
07/31/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Final
NAVEEN KUMAR
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Ventilation and air distribution system
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
07/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Violation issued (HPD, open)
A
03/18/2025
Permit issued — Supported Scaffold
B01149500-I1-SF
03/17/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01149500-I1
02/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/03/2025
Permit issued — Plumbing
B00906012-S1-PL
11/25/2024
Violation issued (HPD, open)
I
10/07/2024
Permit issued — Earth Work
B00906012-I1-GC-CX
10/01/2024
Permit issued — Construction Fence
B00906012-S3-FN
08/22/2024
Objection resolved — Addressed
08/21/2024
Objection raised — Other
08/14/2024
Filed — Alteration
Mechanical work filed in conjunction with Alteration 322065171
B00906012-S3
07/26/2024
Violation issued (ECB, closed)
Construction
06/27/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/17/2024
Objection resolved — Addressed
04/08/2024
Violation issued (HPD, open)
A
01/30/2024
Objection resolved — Addressed
01/30/2024
Objection resolved — Addressed
01/25/2024
Objection raised — Structural
01/25/2024
Objection raised — Admin
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS09/25/2026
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC04/03/2026
DOB NOWEarth WorkSigned-offDF CUSTOM BUILDERS DEV03/17/2026
DOB NOWStructuralPermit IssuedDF CUSTOM BUILDERS DEV12/15/2025
DOB NOWSupport of ExcavationSigned-offDF CUSTOM BUILDERS DEV11/19/2025
DOB NOWMechanical SystemsPermit IssuedDF CUSTOM BUILDERS DEV09/05/2025
DOB NOWEarth WorkPermit IssuedDF CUSTOM BUILDERS DEV09/03/2025
DOB NOWConstruction FencePermit IssuedDF CUSTOM BUILDERS DEV09/02/2025
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS03/18/2025
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC02/03/2025
DOB NOWEarth WorkPermit IssuedCDF CUSTOM BUILDERS INC10/07/2024
DOB NOWConstruction FencePermit IssuedCDF CUSTOM BUILDERS INC10/01/2024
BIS—ISSUEDCDF CUSTOM BUILDERS INC11/19/2024
BIS—ISSUEDUPPERLEVEL CONSTRUCTION02/07/2024
BIS—ISSUEDUPPERLEVEL CONSTRUCTION08/08/2023
BIS—ISSUEDRHY CONSTRUCTION LLC06/22/2023
BIS—ISSUEDRHY CONSTRUCTION LLC06/22/2023
BISPLISSUEDPLBG P & H INC04/03/2023
BIS—ISSUEDRHY CONSTRUCTION LLC03/22/2023
BISOTISSUEDPERCIBALLI INDUSTRIES INC.04/19/2018
1 project · most recent 08/04/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2025Permit IssuedDF CUSTOM BUILDERS & DEVHeating and Air Conditioning Systems
Heat / Cool
Daikin XTQ60TBVJUA 60,000 BTU · Vrf Indoor ×3
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×2
4MXL36WVJU9 36,000 BTU · Heat Pump Outdoor ×1
RXF12AVJU9 12,000 BTU · Heat Pump Outdoor ×1
RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/04/2025Permit IssuedKISHAN PLUMBING INCGas, Storm, Water/Sanitary
5 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedSPARK ELECTRICAL SVCS LLC1 meters, 1 new_meters
12/11/2024Permit IssuedTHIRD GENERATION ELECTRICGeneral Wiring
12/11/2024Permit IssuedTHIRD GENERATION ELECTRIC—
12/08/2023Permit IssuedTFK ELECTRIC CORP—
10/29/2019CancelledEFCO ELECTRICAL SERVI INCGeneral Wiring
2 projects · most recent 08/04/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/04/2025Permit IssuedKISHAN PLUMBING INCSteel, Concrete, Masonry
05/12/2023Signed-offDF CUSTOM BUILDERS & DEV1 scope_items
2 projects · most recent 08/04/2025
Fence Scaffold
FiledStatusContractorScope
08/04/2025Permit IssuedKISHAN PLUMBING INCFence
03/17/2025Permit IssuedJ & G CONSTRUCTION SVCSScaffold
1 project · most recent 05/12/2023
Earthwork
FiledStatusContractorScope
05/12/2023Signed-offDF CUSTOM BUILDERS & DEVEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/31/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
07/31/2025FinalNAVEEN KUMARprogress
07/31/2025HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
07/31/2025HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
07/31/2025Duct leakage testing, insulation and designINDARDEO PARBHUNATHenergy_progress
07/31/2025HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
07/31/2025Ventilation and air distribution systemINDARDEO PARBHUNATHenergy_progress
07/31/2025Mechanical SystemsINDARDEO PARBHUNATHspecial
07/31/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/31/2025Post-installed AnchorsINDARDEO PARBHUNATHspecial
07/31/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
05/09/2023Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
05/09/2023MasonryShahrish Shuvospecial
05/09/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/09/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
05/08/2023FinalShahrish Shuvoprogress
05/08/2023Footing and FoundationShahrish Shuvoprogress
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/27/2026B00871612-I1Request digital key ↗
08/24/2026B00906012-I1Request digital key ↗
08/24/2026B00906012-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00125929-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION18
02/18/2026340921881Open ↗
02/18/2026340921881Open ↗
02/13/2026340921881Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION7
11/27/2024322065171Open ↗
11/13/2024322065171Open ↗
08/09/2023322065171Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/24/2026340921881Open ↗
02/18/2026340921881Open ↗
12/04/2025340921881Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
11/09/2019321964415Open ↗
07/29/2019322065171Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/03/2019322065171Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/29/2019322065171Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00906012-S4Open ↗
09/23/2026B00906012-S4Open ↗
09/23/2026B00906012-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026B00125929-I1Open ↗
08/27/2026B00871612-I1Open ↗
08/24/2026B00906012-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00906012-S4Open ↗
09/23/2026B00906012-S4Open ↗
09/23/2026B00906012-S4Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/30/2019321948817Open ↗
12/19/2018322065171Open ↗
04/19/2018321744742Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/30/2019321948817Open ↗
04/19/2018321744742Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/30/2019321948817Open ↗
04/19/2018321744742Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/04/2025340921881Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/04/2025340921881Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/19/2018322065171Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST4
02/24/2026340921881Open ↗
02/18/2026340921881Open ↗
09/05/2019321964415Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
11/01/2019322065171Open ↗
11/01/2019322065171Open ↗
11/01/2019322065171Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
10/08/2019322065171Open ↗
04/19/2018321744742Open ↗
▸BISTenant Protection Plan and Notes1
12/19/2018322065171Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00871612-I1Open ↗
08/24/2026B00906012-S2Open ↗
08/24/2026B00906012-S4Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/10/2019321948817Open ↗
12/19/2018322065171Open ↗
12/19/2018322065171Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/12/2023322065171Open ↗
07/11/2023322065171Open ↗
07/10/2023322065171Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/15/2024321744742Open ↗
10/15/2024321744742Open ↗
10/15/2024321744742Open ↗
Showing 3 of 8 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/05/2019321964415Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/10/2019321948817Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/10/2019321948817Open ↗
▸BISSOIL REPORT1
06/27/2019322065171Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/15/2024321744742Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00906012-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00906012-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00906012-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE6
07/14/2023322065171Open ↗
07/13/2023322065171Open ↗
06/12/2023322065171Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/27/2024322065171Open ↗
08/09/2023322065171Open ↗
04/03/2019322065171Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/06/2024321744742Open ↗
▸BISFINAL1
10/15/2024321744742Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/09/2023322065171Open ↗
03/29/2023322065171Open ↗
11/01/2019322065171Open ↗
▸BISCOST AFFIDAVIT3
05/30/2019321948817Open ↗
12/19/2018322065171Open ↗
04/19/2018321744742Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/31/2024321744742Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/09/2023322065171Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET4
06/27/2019321964415Open ↗
05/16/2019321948817Open ↗
12/19/2018322065171Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
07/11/2023322065171Open ↗
10/16/2019322065171Open ↗
09/25/2019322065171Open ↗
▸BISBOROUGH INTAKE FORM1
10/22/2020322065171Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/04/2025340921881Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/28/2019321964415Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
02/24/2026340921881Open ↗
02/18/2026340921881Open ↗
02/18/2026340921881Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00871612-I1Open ↗
08/13/2026B00906012-I1Open ↗
08/13/2026B00906012-S2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/01/2019322065171Open ↗
11/01/2019322065171Open ↗
▸BISPLOT DIAGRAM1
12/19/2018322065171Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00871612-I1Open ↗