← Back
Two family converted from one family
1945 WEST 8 STREET
BROOKLYN · BIN 3190114
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R5BZoning
1,200 sfGross Floor Area
2Units
Two family converted from one family · 1,609 sf lot · 0.75 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 2 filings · 16 docs
Floor 1Under Construction8p · 2 filings · 16 docs
CellarUnder Construction10p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2026$790K—— → —$658/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI506/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
CATMAN PLUMBING INCPlumbing106/27/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/19/2026
Building Lifecycle
All (21)Filed (5)Permit Issued (3)Inspection (4)Special Inspection (9)
07/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/17/2026
Permit issued — Plumbing
B01372804-I1-PL
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/22/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, TANK-LESS WATER HEATER AND COMBI. BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA
B01372804-P1
06/19/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01372801-P2
06/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/30/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01372801-P1
03/30/2026
Permit issued — Plumbing
B01372804-I1-PL
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
03/25/2026
Permit issued — General Construction
B01372801-I1-GC
03/24/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01372801-I1
03/24/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, TANK-LESS WATER HEATER AND COMBI. BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA
B01372804-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG07/17/2026
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC03/30/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC03/25/2026
1 project · most recent 06/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/22/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Storm, Water/Sanitary
1 project · most recent 04/04/2026
General Wiring
FiledStatusContractorScope
04/04/2026Permit IssuedCL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/23/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/23/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/23/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/19/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/19/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/19/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
03/27/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
03/27/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
03/27/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026B01372804-P1Request digital key ↗
08/17/2026B01372804-I1Request digital key ↗
08/17/2026B01372804-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01372804-I1Open ↗
08/17/2026B01372801-P2Open ↗
08/17/2026B01372801-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01372801-I1Open ↗
09/01/2026B01372801-P2Open ↗
08/24/2026B01372801-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01372801-I1Open ↗
09/01/2026B01372801-P2Open ↗
08/24/2026B01372801-P1Open ↗