Large suburban residence
195-05 KENO AVENUE
QUEENS · Jamaica Estates-Holliswood · BIN 4224122
💬 Discuss this project
1940Year Built
2Stories
A3Building Class
R1-2Zoning
5,100 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 8,526 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
AtticUnder Construction54p · 1 filing · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction62p · 1 filing · 20 docs
CellarUnder Construction62p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 1 filing · 20 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TJAR GROUP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2024$1.1M—— → —$225/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS907/08/2026
BORIS BALKHIYEV, PE111/13/2025
RAS PE CONSULTING ENGINEERS406/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING6860803/21/2026
GERALD J. CALIENDO R.A., P.C.503/21/2026
Advanced Solar Solutions103/21/2026
GERALD J CALIENDO R A P C503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TJAR GROUP CORPGeneral Contractor1107/08/2026
NAS ELECTRIC CORPElectrical103/22/2026
ADVANCED SOLAR SOLUTIONSGeneral Contractor104/09/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191207/01/2026
MB INSPECTIONS, CORP.8703111/13/2025
Building Lifecycle
All (118)Filed (14)Permit Issued (11)Signed Off (6)Violation (3)Inspection (9)Objection (45)Special Inspection (30)
08/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2026
Objection raised — Other
08/19/2026
Objection resolved — Addressed
07/16/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
07/16/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
07/16/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/16/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/16/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
07/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/16/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
07/16/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/16/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/16/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/16/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/16/2026
Special inspection requirement — Masonry
Younes Abouyaala
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/16/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
07/16/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/16/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/16/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/08/2026
Filed — Alteration
FILING NEW CURB CUT APPLICATION IN CONJUNCTION WITH JOB NUMBER Q01151114-I1
Q01427908-I1
07/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-P7
06/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
06/30/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
06/16/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-S1
06/15/2026
Signed off — Alteration
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01316806-I1
06/09/2026
Permit issued — General Construction
Q01151114-I1-GC
06/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-S5
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2026
Permit issued — Construction Fence
Q01151114-S1-FN
04/13/2026
Objection raised — Zoning
04/13/2026
Objection raised — Zoning
04/13/2026
Objection raised — Zoning
04/08/2026
Violation issued (ECB, closed)
Construction
04/08/2026
Violation issued (ECB, closed)
Construction
04/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-P6
03/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-S3
03/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-S4
01/26/2026
Permit issued — Solar
Q01316806-I1-SL
01/08/2026
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/01/2025
Objection raised — Inspections
12/01/2025
Objection raised — Scope
12/01/2025
Objection raised — Other
11/13/2025
Filed — Alteration
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01316806-I1
10/29/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING ST PLANS OF 2 STORY BLDG. THE ST PLAN INVOLVES WOOD FRAMING WITH STEEL FRAMING IN ADDITION TO PARTIAL DEMO SEQUENCE. THIS JOB IS FILED SUBSEQUENT TO THE DOB JOB #Q01151114-I1
Q01151114-S2
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTJAR GROUP CORP06/09/2026
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP04/14/2026
DOB NOWSolarSigned-offADVANCED SOLAR SOLUTIONS01/26/2026
DOB NOWFoundationSigned-offTJAR GROUP CORP08/08/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/15/2025
DOB NOWGeneral ConstructionPermit IssuedTJAR GROUP CORP06/11/2025
DOB NOWGeneral ConstructionPermit IssuedTJAR GROUP CORP04/08/2025
DOB NOWStructuralSigned-offTJAR GROUP CORP04/08/2025
DOB NOWGeneral ConstructionPermit IssuedTJAR GROUP CORP04/08/2025
DOB NOWSupport of ExcavationSigned-offTJAR GROUP CORP04/07/2025
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP03/25/2025
1 project · most recent 07/01/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Permit IssuedTJAR GROUP CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×18
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×18
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×15
1 project · most recent 07/01/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/01/2026Signed-offDPH PLUMBING & HTG CORPStorm, Water/Sanitary
2 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteBRANDL ELECTRIC INC.1 meters, 1 new_meters
04/14/2026Permit IssuedNAS ELECTRIC CORPGeneral Wiring
1 project · most recent 07/01/2026
Steel Concrete Wood
FiledStatusContractorScope
07/01/2026Permit IssuedTJAR GROUP CORPSteel, Concrete, Wood
1 project · most recent 11/13/2025
FiledStatusContractorScope
11/13/2025Signed-offADVANCED SOLAR SOLUTIONS162 panels, 74.52 kw, 2,561.62 roof_area_sqft
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
07/16/2026Permanent certificateYounes Abouyaalaenergy_progress
07/16/2026Maintenance informationYounes Abouyaalaenergy_progress
07/16/2026Fenestration areasYounes Abouyaalaenergy_progress
07/16/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/16/2026Fenestration air leakageYounes Abouyaalaenergy_progress
07/16/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/16/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
07/16/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/16/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/16/2026Subgrade InspectionsYounes Abouyaalaspecial
07/16/2026Mechanical SystemsYounes Abouyaalaspecial
07/16/2026MasonryYounes Abouyaalaspecial
07/16/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
07/16/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
07/16/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/16/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/16/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/16/2026FinalNAVEEN KUMARprogress
07/16/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/16/2026Interior lighting powerYounes Abouyaalaenergy_progress
07/16/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
07/16/2026Air barrier — testing Younes Abouyaalaenergy_progress
07/16/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/16/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/16/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
Latest 25 of 131.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/18/2026Q01316806-I1Request digital key ↗
08/17/2026Q01151114-P2Request digital key ↗
08/17/2026Q01151114-S4Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram6
08/17/2026Q01151114-P7Open ↗
08/13/2026Q01151114-I1Open ↗
08/13/2026Q01151114-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/17/2026Q01151114-P7Open ↗
08/13/2026Q01151114-P5Open ↗
08/13/2026Q01151114-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/13/2026Q01151114-I1Open ↗
08/13/2026Q01151114-P1Open ↗
08/13/2026Q01151114-P5Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature17
09/30/2026Q01151114-P1Open ↗
09/30/2026Q01151114-P1Open ↗
09/30/2026Q01151114-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/30/2026Q01151114-P1Open ↗
09/30/2026Q01151114-P1Open ↗
09/30/2026Q01151114-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/18/2026Q01316806-I1Open ↗
08/17/2026Q01151114-P2Open ↗
08/17/2026Q01151114-S5Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/18/2026Q01316806-I1Open ↗
08/17/2026Q01151114-P2Open ↗
08/17/2026Q01151114-S4Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/17/2026Q01151114-P7Open ↗
08/13/2026Q01151114-P3Open ↗
08/13/2026Q01151114-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01151114-S3Open ↗
08/13/2026Q01151114-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01316806-I1Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial6
08/17/2026Q01151114-P7Open ↗
08/13/2026Q01151114-P3Open ↗
08/13/2026Q01151114-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/17/2026Q01151114-P7Open ↗
08/13/2026Q01151114-P5Open ↗
08/13/2026Q01151114-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026Q01151114-P3Open ↗
08/17/2026Q01151114-P7Open ↗
08/17/2026Q01151114-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01151114-S2Open ↗
08/13/2026Q01151114-S3Open ↗
▸DOB NOWFinal Survey1
08/15/2026Q01151114-I1Open ↗