← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
195 BOWERY
MANHATTAN · BIN 1079085
💬 Discuss this project
1900Year Built
16Stories
RMBuilding Class
C6-1Zoning
40,450 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,720 sf lot · 5.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 10 docs
BulkheadUnder Construction1p · 1 filing · 16 docs
Floor 161 filing · 2 docs
Floor 15Under Construction1p · 2 filings · 11 docs
Floor 141 filing · 2 docs
Floor 131 filing · 2 docs
Floor 121 filing · 2 docs
Floor 111 filing · 2 docs
Floor 101 filing · 2 docs
Floor 91 filing · 2 docs
Floor 81 filing · 2 docs
Floor 71 filing · 2 docs
Floor 61 filing · 2 docs
Floor 51 filing · 2 docs
Floor 41 filing · 2 docs
Floor 31p · 2 filings · 10 docs
Floor 22p · 2 filings · 10 docs
Floor 1
Cellar1p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
APSE PROPERTY SERVICES607/08/2026
CANIDO BASONAS CONSTRUCTION3007/08/2026
201 NORTH 11TH ST CONDOMINIUM507/08/2026
A W R GROUP603/22/2026
CANIDO BASONAS CONST SVC303/22/2026
THE 195 CONDOMINIUM803/22/2026
GB CONSTRUCTION2903/22/2026
COFFEY CONTRACTING303/22/2026
OWNER OF 195 BOWERY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS403/21/2026
Rigid Structural Design, LLC1003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPIRE SCAFFOLDING & HOISTGeneral Contractor2107/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor1807/08/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor407/02/2026
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
CANIDO BASONAS CONSTRUCTIGeneral Contractor407/08/2026
CC CONTROLLED PLBG CO INCPlumbing207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor209/13/2026
CC CONTROLLED PLBG CO.,INPlumbing207/08/2026
PAUL OLSENElectrical103/21/2026
ALFREDO VEGAElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BONE/LEVINE ARCHITECTS307108/28/2026
KZ ENGINEERING, P.C.4665410/06/2025
360 ENGINEERING P.C.7496305/19/2023
ROBERT F. GERMAIN JR. PE5100201/28/2020
Building Lifecycle
All (185)Filed (28)Permit Issued (42)Signed Off (5)Facade (FISP) (15)Violation (60)Objection (13)Special Inspection (22)
09/11/2026
Permit issued — Supported Scaffold
M01287423-I1-SF
08/28/2026
Filed — Alteration
Repair exterior and interior water damaged walls and ceiling as shown on drawings filed herewith. No change in use, egress or occupancy.
M01446804-I1
08/17/2026
Special inspection requirement — Sprayed fire-resistant materials
Kevin Bone
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kevin Bone
08/17/2026
Special inspection requirement — Final
Kevin Bone
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/08/2026
Permit issued — Suspended Scaffold
M01129888-I1-SC
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/08/2026
Objection raised — Zoning
05/08/2026
Objection raised — Scope
05/08/2026
Objection raised — Fire_Protection
05/08/2026
Objection raised — Zoning
05/08/2026
Objection raised — Fire_Protection
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Scope
04/29/2026
Violation issued (HPD, open)
A
04/14/2026
Filed — Alteration CO
INTERIOR RENOVATION AT 2ND FLOOR INCLUDING CHANGE OF USE FROM EXISTING COMMERCIAL OFFICE TO RESIDENTIAL APARTMENT USE
M01381022-I1
04/14/2026
Filed — Alteration CO
INTERIOR RENOVATION AT 2ND FLOOR INCLUDING CHANGE OF USE FROM EXISTING COMMERCIAL OFFICE TO RESIDENTIAL APARTMENT USE
M01381022-S2
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/16/2026
Signed off — Alteration
M00972481-I1
03/05/2026
Permit issued — Suspended Scaffold
M01129888-I1-SC
02/08/2026
Violation issued (ECB, open)
Unknown
01/25/2026
Permit issued — Sidewalk Shed
M00900674-I1-SH
01/16/2026
Permit issued — Protection and Mechanical Methods
M01102118-I1-PMM
01/15/2026
Permit issued — Protection and Mechanical Methods
M01160721-I1-PMM
01/15/2026
Permit issued — Supported Scaffold
M00997511-I1-SF
10/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
10/30/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/27/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01287423-P2
10/07/2025
Permit issued — Suspended Scaffold
M00972481-I1-SC
10/06/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01129888-P2
10/03/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/03/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
09/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01287423-P1
09/19/2025
Permit issued — Supported Scaffold
M01287423-I1-SF
09/18/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01287423-I1
07/22/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00997511-P2
07/11/2025
Permit issued — Protection and Mechanical Methods
M01160721-I1-PMM
07/11/2025
Permit issued — Sidewalk Shed
M00900674-I1-SH
07/10/2025
Permit issued — Protection and Mechanical Methods
M01102118-I1-PMM
07/10/2025
Permit issued — Supported Scaffold
M00997511-I1-SF
06/04/2025
Violation issued (HPD, closed)
A
05/19/2025
Filed — Alteration CO
CHANGE OF USE AT THE 3RD FLOOR OF THE EXISTING 16-STORY MIXED USE BUILDING (195 BOWERY PORTION), TO CONVERT FROM EXISTING COMMERCIAL OFFICE USE TO PROPOSED 1 RESIDENTIAL APARTMENT.
M01128790-I1
05/19/2025
Filed — Alteration CO
CHANGE OF USE AT THE 3RD FLOOR OF THE EXISTING 16-STORY MIXED USE BUILDING (195 BOWERY PORTION), TO CONVERT FROM EXISTING COMMERCIAL OFFICE USE TO PROPOSED 1 RESIDENTIAL APARTMENT.
M01128790-S1
05/13/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01129888-P1
03/06/2025
Permit issued — Suspended Scaffold
M01129888-I1-SC
12/31/2024
Filed — Alteration
M01160721-I1
12/31/2024
Permit issued — Protection and Mechanical Methods
M01160721-I1-PMM
12/20/2024
Cycle 9 facade report submitted
12/18/2024
Cycle 9 facade report signed — UNSAFE
12/13/2024
Cycle 9 facade inspection completed
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2024
Permit issued — Suspended Scaffold
M00972481-I1-SC
10/30/2024
Permit issued — Suspended Scaffold
M01129888-I1-SC
10/28/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01129888-I1
10/17/2024
Special inspection requirement — Interior lighting power
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC09/11/2026
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC06/08/2026
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC03/05/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION01/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEM CONSTRUCTION01/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEM CONSTRUCTION01/15/2026
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEM CONSTRUCTION01/15/2026
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC10/07/2025
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC09/19/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEMS INSTAL S&S07/11/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S07/11/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEMS INSTAL S&S07/10/2025
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEMS INSTAL S&S07/10/2025
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC03/06/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEMS INSTAL S&S12/31/2024
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC11/21/2024
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC10/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEMS INSTAL S&S09/12/2024
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEMS INSTAL S&S07/22/2024
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S07/18/2024
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEMS INSTAL S&S02/02/2024
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC12/20/2023
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S07/18/2023
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPIRE SCAFFOLDING & HOIST05/04/2023
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPIRE SCAFFOLDING & HOIST04/18/2023
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST04/18/2023
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST03/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPIRE SCAFFOLDING & HOIST04/28/2022
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST04/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPIRE SCAFFOLDING & HOIST12/10/2021
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST12/10/2021
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST11/10/2021
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI10/29/2021
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN08/03/2021
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN08/03/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/30/2021
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI03/17/2021
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO INC02/03/2020
+ 49 more permits on file
2 projects · most recent 05/19/2025
Water/Sanitary Gas
FiledStatusContractorScope
05/19/2025——Water/Sanitary
01/24/2020Permit IssuedCC CONTROLLED PLBG CO.,INGas
4 projects · most recent 01/30/2025
FiledStatusContractorScope
01/30/2025Permit IssuedDONALD MCGEACHY, INC.—
07/25/2023Permit IssuedAUR0RA ELECL CONTG INC—
01/27/2022CompleteNASH ELECTRIC SERVICES IN—
12/03/2019Permit IssuedRICHARD NEU—
3 projects · most recent 10/27/2025
Scaffold
FiledStatusContractorScope
10/27/2025Permit IssuedANDAMIO SCAFFOLDING LLCScaffold
07/22/2025Permit IssuedINTERSYSTEM CONSTRUCTIONScaffold
03/16/2021Permit IssuedCANIDO BASONAS CONSTRUCTIScaffold
1 project · most recent 10/06/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/06/2025Permit IssuedA W R GROUP INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/17/2026Sprayed fire-resistant materialsKevin Bonespecial
08/17/2026Fire-Resistant Penetrations and JointsKevin Bonespecial
08/17/2026FinalKevin Boneprogress
04/14/2026Fire-Resistant Penetrations and Joints—special
10/30/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/30/2025Post-installed AnchorsKarol Zdancewiczspecial
10/03/2025Post-installed AnchorsKarol Zdancewiczspecial
10/03/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/17/2024Interior lighting power—energy_progress
10/17/2024Fire-Resistance Rated Construction—progress
10/17/2024Energy Code Compliance Inspections—progress
10/17/2024Fire-Resistant Penetrations and Joints—special
10/17/2024Lighting in dwelling units—energy_progress
10/17/2024Lighting controls—energy_progress
05/19/2023Post-installed AnchorsPETER FOSTERspecial
05/17/2023Post-installed AnchorsPETER FOSTERspecial
01/28/2020HVAC and service water heating system controlsRobert Germain Jr.energy_progress
01/28/2020Maintenance informationRobert Germain Jr.energy_progress
01/28/2020HVAC and service water heating equipmentRobert Germain Jr.energy_progress
01/24/2020Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/20/2019Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/29/2019FinalRAFI HAMIDprogress
▾Documents — 271 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch25
09/06/2026M01381022-S2Request digital key ↗
09/06/2026M01381022-I1Request digital key ↗
09/04/2026M00487191-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00273806-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00285530-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/05/2026M00303123-I1Request digital key ↗
▸Applications & Permits40
▸BISWORK PERMIT APPLICATION20
01/10/2024123747614Open ↗
06/29/2023123747614Open ↗
02/11/2021123747614Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
10/21/2025123747614Open ↗
04/16/2024123747614Open ↗
01/12/2024123747614Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications87
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/06/2026M01381022-S2Open ↗
09/06/2026M01381022-I1Open ↗
09/05/2026M00273806-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
12/11/2019123747614Open ↗
09/27/2019123747614Open ↗
09/27/2019123747614Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01446804-I1Open ↗
09/23/2026M01446804-I1Open ↗
08/27/2026M00630340-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
05/25/2012121008140Open ↗
05/25/2012121038947Open ↗
07/26/2010120420623Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/25/2012121008140Open ↗
05/25/2012121038947Open ↗
07/26/2010120420623Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01446804-I1Open ↗
08/31/2026M00273806-I1Open ↗
08/22/2026M00303123-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/15/2021140997134Open ↗
10/05/2016140556850Open ↗
04/14/2015140334056Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/15/2021140997134Open ↗
10/05/2016140556850Open ↗
04/14/2015140334056Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/15/2021140997134Open ↗
10/05/2016140556850Open ↗
04/14/2015140334056Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS2
02/06/2009110096672Open ↗
01/28/2009110096672Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/04/2015121668132Open ↗
05/12/2015121668132Open ↗
▸BISSCHEDULE B - PLUMBING1
10/05/2016140556850Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/16/2014121668132Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/29/2009110096672Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan3
09/05/2026M00273806-I1Open ↗
08/13/2026M00303123-I1Open ↗
08/13/2026M00285530-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
01/19/2024123747614Open ↗
10/05/2016140556850Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026M01381022-I1Open ↗
08/13/2026M01128790-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/06/2026M01381022-I1Open ↗
09/06/2026M01381022-S2Open ↗
09/01/2026M01446804-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
05/25/2012121008140Open ↗
12/13/2011120420623Open ↗
07/26/2010120420623Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/11/2019123747614Open ↗
01/16/2014121668132Open ↗
05/29/2012121038947Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
11/08/2012121384019Open ↗
11/08/2012121384019Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
05/25/2012121038947Open ↗
02/14/2008110096672Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/27/2019123747614Open ↗
02/09/2016121668132Open ↗
06/06/2014121384019Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/04/2017140556850Open ↗
02/09/2016121668132Open ↗
02/09/2016121668132Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
11/08/2012121384019Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/14/2015140334056Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/05/2016140556850Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/21/2025123747614Open ↗
04/10/2024123747614Open ↗
04/10/2024123747614Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/04/2017140556850Open ↗
02/09/2016121668132Open ↗
08/04/2015140334056Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
11/08/2012121384019Open ↗
05/25/2012121008140Open ↗
05/25/2012121038947Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/22/2026M00997511-P1Open ↗
08/22/2026M00997511-P2Open ↗
08/22/2026M00997511-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
01/10/2024123747614Open ↗
01/10/2024123747614Open ↗
06/29/2023123747614Open ↗
▸BISSHED LETTER1
05/01/2013121008140Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/24/2014121038947Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
01/15/2021140997134Open ↗
09/27/2019123747614Open ↗
12/04/2017140556850Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET7
09/27/2019123747614Open ↗
01/16/2014121668132Open ↗
10/04/2012121384019Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
01/10/2024123747614Open ↗
02/11/2021123747614Open ↗
01/25/2021123747614Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
01/06/2026123747614Open ↗
04/24/2024123747614Open ↗
05/25/2023123747614Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/15/2021140997134Open ↗
10/05/2016140556850Open ↗
04/14/2015140334056Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/13/2026M00972481-I1Open ↗
08/13/2026M01129888-P1Open ↗
08/13/2026M01129888-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01129888-P1Open ↗
08/13/2026M00972481-I1Open ↗
08/13/2026M01129888-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
09/06/2026M01381022-I1Open ↗
08/23/2026M01128790-I1Open ↗