← Back
BuildNYC
Two family brick
195 LINCOLN AVENUE
STATEN ISLAND · BIN 5051665
💬 Discuss this project
1930Year Built
2.5Stories
B1Building Class
R3XZoning
1,584 sfGross Floor Area
2Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · 4,445 sf lot · 0.36 FAR built · Flood zone X500
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorBathroom wall and insulation work5p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
195 Lincoln Avenue103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EC Expediting Services204/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC Expediting and Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amb ConstructionGeneral Contractor203/21/2026
A&E Electrical Systems CoElectrical103/22/2026
Building Lifecycle
03/31/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00602243-I1-GC
06/01/2022
Permit issued — General Construction
S00602243-I1-GC
04/07/2022
Filed — Alteration
JOB FILED TO REMOVE WORK WITHOUT A PERMIT VIOLATIONS IN BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00602243-S1
03/10/2022
Special inspection requirement — Final
Misha Saradoff
10/22/2021
Filed — Alteration
JOB FILED TO REMOVE WORK WITHOUT A PERMIT VIOLATIONS IN BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00602243-I1
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAmb Construction06/01/2022
1 project · most recent 06/04/2019
General Wiring
FiledStatusContractorScope
06/04/2019CompleteA&E Electrical Systems CoGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/10/2022FinalMisha Saradoffprogress
10/20/2021Insulation placement and R valuesMisha Saradoffenergy_progress
5 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account