← Back
BuildNYC
Two stories - detached, small or mid-size
195 WOODVALE AVENUE
STATEN ISLAND · BIN 5083109
💬 Discuss this project
1975Year Built
2Stories
A1Building Class
R3XZoning
1,920 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhoto-Voltaic Array Installation on Existing Roof Top1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James A Clancy212/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arc Design and Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ficazzola ConsultingGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James A Clancy9176212/08/2025
Building Lifecycle
12/09/2025
Signed off — Alteration
INSTALLATION OF PV SOLAR ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01293895-I1
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
12/09/2025
Special inspection requirement — Final
James Clancy
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
12/09/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFicazzola Consulting10/02/2025
1 project · most recent 09/22/2025
FiledStatusContractorScope
09/22/2025CompleteAmber Electl Contng—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/09/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
12/09/2025FinalJames Clancyprogress
12/09/2025Energy Code Compliance InspectionsJames Clancyprogress
12/09/2025Air barrier - visual inspectionJames Clancyenergy_progress
12/08/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
12/08/2025Energy Code Compliance InspectionsJames Clancyprogress
12/08/2025FinalJames Clancyprogress
12/08/2025Air barrier - visual inspectionJames Clancyenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account