← Back
Two family converted from one family
1952 HAIGHT AVENUE
BRONX · BIN 2048532
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R4AZoning
4,468 sfGross Floor Area
2Units
Two family converted from one family · 3,742 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2024$1.4M—1952 HAIGHT LLC → Private party$302/sf building
03/28/2022$400K—— → —$90/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC702/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.I. CONTRACTING CORPGeneral Contractor307/08/2026
EMPIRE ELECTRIC NYC LLCElectrical103/22/2026
ALESSANDRO PLUMBINGGeneral Contractor103/21/2026
TRUOCCOLO JAMESGeneral Contractor103/21/2026
RUGOVA GROUP LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216206/16/2023
Building Lifecycle
All (40)Filed (7)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (23)
04/25/2024
Signed off — Alteration
PROPOSED INTERIOR ALTERATIONS TO THE CELLAR, FIRST, SECOND AND ATTIC FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00657025-I1
04/16/2024
Signed off — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-I1
04/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2024
Filed — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-P4
01/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
01/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
01/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
01/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2024
Filed — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-P3
01/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
01/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
01/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
01/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
12/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2023
Filed — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-P2
10/31/2023
Permit issued — General Construction
X00657025-I1-GC
08/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/19/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
06/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
06/19/2023
Special inspection requirement — Fenestration areas
Steven Savino
06/19/2023
Special inspection requirement — Insulation placement and R values
Steven Savino
06/19/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
06/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
06/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
06/19/2023
Special inspection requirement — Final
Steven Savino
06/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
06/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
06/19/2023
Special inspection requirement — Air barrier - visual inspection
Steven Savino
06/16/2023
Filed — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-P1
06/16/2023
Filed — Alteration
PROPOSED INTERIOR ALTERATIONS TO THE CELLAR, FIRST, SECOND AND ATTIC FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00657025-P1
06/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
06/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
06/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
05/09/2023
Permit issued — Plumbing
X00657019-I1-PL
12/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/22/2022
Permit issued — General Construction
X00657025-I1-GC
09/09/2022
Filed — Alteration
RELOCATE EXISTING PLUMBING FIXTURES IN THE CELLAR, FIRST FLOOR AND SECOND FLOORS AND INSTALL NEW PLUMBING FIXTURES FIRST AND SECOND FLOORS WITH ASSOCIATED PIPING.
X00657019-I1
09/08/2022
Filed — Alteration
PROPOSED INTERIOR ALTERATIONS TO THE CELLAR, FIRST, SECOND AND ATTIC FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00657025-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offC.I. CONTRACTING CORP10/31/2023
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC05/09/2023
DOB NOWGeneral ConstructionSigned-offC.I. CONTRACTING CORP09/22/2022
1 project · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteEMPIRE ELECTRIC NYC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/29/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
01/29/2024Energy Code Compliance InspectionsSteven Savinoprogress
01/29/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
01/29/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
01/04/2024Energy Code Compliance InspectionsSteven Savinoprogress
01/04/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
01/04/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
01/04/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/19/2023Lighting in dwelling unitsSteven Savinoenergy_progress
06/19/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
06/19/2023Fenestration areasSteven Savinoenergy_progress
06/19/2023Insulation placement and R valuesSteven Savinoenergy_progress
06/19/2023Fenestration air leakageSteven Savinoenergy_progress
06/19/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
06/19/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
06/19/2023FinalSteven Savinoprogress
06/19/2023Energy Code Compliance InspectionsSteven Savinoprogress
06/19/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
06/19/2023Air barrier - visual inspectionSteven Savinoenergy_progress
06/16/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
06/16/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/16/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/16/2023Energy Code Compliance InspectionsSteven Savinoprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00657019-P3Request digital key ↗
08/24/2026X00657019-P2Request digital key ↗
08/24/2026X00657019-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026X00657019-P1Open ↗
09/01/2026X00657019-P1Open ↗
08/29/2026X00657019-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00657019-P3Open ↗
08/24/2026X00657019-P2Open ↗
08/24/2026X00657019-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X00657025-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026X00657019-P3Open ↗
08/24/2026X00657019-P2Open ↗
08/24/2026X00657019-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00657019-I1Open ↗
08/13/2026X00657025-I1Open ↗