← Back
Walk-up cooperative
196-01 POMPEII AVENUE
QUEENS · Jamaica Estates-Holliswood · BIN 4460578
💬 Discuss this project
1950Year Built
2Stories
C6Building Class
R3-2Zoning
120,184 sfGross Floor Area
152Units
LL97 CoveredRent Stabilized97 Open Violations ▸
Walk-up cooperative · Owner of record: HOLLISWOOD OWNERS CORP · 222,175 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Site & exterior3p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD OWNERS503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAR ARCHITECTURE & ENGINEERING P.C.312/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAR DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLANTIC SPECIALTY INCGeneral Contractor507/08/2026
LINEAL CONSTRUCTION & RESGeneral Contractor107/08/2026
MAR CODE INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S.A.M. ARCHITECTURE5901212/14/2021
Building Lifecycle
All (19)Filed (3)Permit Issued (5)Signed Off (2)Violation (2)Special Inspection (7)
11/25/2025
Violation issued (HPD, open)
I
08/15/2022
Signed off — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496939-I1
05/06/2022
Permit issued — General Construction
Q00496939-I1-GC
04/21/2022
Permit issued — General Construction
Q00496939-I1-GC
04/20/2022
Permit issued — General Construction
Q00496939-I1-GC
04/20/2022
Permit issued — General Construction
Q00496939-I1-GC
12/15/2021
Special inspection requirement — Masonry
Sajjad Malik
12/15/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sajjad Malik
12/15/2021
Special inspection requirement — Final
Sajjad Malik
12/14/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496939-P2
12/10/2021
Special inspection requirement — Masonry
Sajjad Malik
12/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sajjad Malik
12/10/2021
Special inspection requirement — Final
Sajjad Malik
04/09/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496939-I1
05/21/2020
Signed off — Alteration
New 8'-0" high wood Temporary Construction Fence With Gates
Q00313727-I1
02/18/2020
Permit issued — Construction Fence
Q00313727-I1-FN
02/14/2020
Filed — Alteration
New 8'-0" high wood Temporary Construction Fence With Gates
Q00313727-I1
02/11/2020
Special inspection requirement — Final
Sajjad Malik
10/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLINEAL CONSTRUCTION & RES05/06/2022
DOB NOWGeneral ConstructionSigned-offMAR CODE INC04/21/2022
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC04/20/2022
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC04/20/2022
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC02/18/2020
BISOTISSUEDATLANTIC SPECIALTY INC03/06/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/15/2021MasonrySajjad Malikspecial
12/15/2021Structural Stability – Alterations of existing buildingsSajjad Malikspecial
12/15/2021FinalSajjad Malikprogress
12/10/2021MasonrySajjad Malikspecial
12/10/2021Structural Stability – Alterations of existing buildingsSajjad Malikspecial
12/10/2021FinalSajjad Malikprogress
02/11/2020FinalSajjad Malikprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/27/2026Q00496939-P2Request digital key ↗
08/27/2026Q00496939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00313727-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/05/2020440584119Open ↗
▸BISWORK PERMIT APPLICATION1
03/05/2020440584119Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q00496939-P2Open ↗
08/23/2026Q00313727-I1Open ↗
08/23/2026Q00496939-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00496939-I1Open ↗
08/13/2026Q00313727-I1Open ↗
08/13/2026Q00496939-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00496939-I1Open ↗
08/23/2026Q00496939-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/05/2020440584119Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/05/2020440584119Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/05/2020440584119Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
03/05/2020440584119Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00313727-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00496939-I1Open ↗
08/13/2026Q00496939-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/05/2020440584119Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/04/2020440584119Open ↗
03/05/2020440584119Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/05/2020440584119Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/04/2020440584119Open ↗
▸BISNYCECC ANALYSIS1
03/05/2020440584119Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/04/2020440584119Open ↗
03/05/2020440584119Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/04/2020440584119Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/04/2020440584119Open ↗
03/05/2020440584119Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/05/2020440584119Open ↗