← Back
BuildNYC
Walk-up cooperative
Meadowlark Gardens
196-12 69TH AVENUE · BIN 4444111
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R4Zoning
116,000 sfGross Floor Area
148Units
LL97 CoveredRent Stabilized17 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Meadowlark Gardens Owners · 225,750 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Meadowlark Gardens mechanical system installationUnder Construction4p · 1 filing · 20 docs
Floor 1Unit 1AUnder Construction4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Meadowlark Gardens Owners103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zaro Engineering409/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Sci ConstructionGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827409/23/2026
Building Lifecycle
All (37)Filed (4)Permit Issued (2)Violation (1)Special Inspection (30)
09/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
09/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
09/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
09/24/2026
Special inspection requirement — Heating Systems
JONAR MADRIAGA
09/23/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01348541-P1
09/23/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01360035-P1
09/21/2026
Special inspection requirement — Heating Systems
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Heating Systems
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
09/21/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
04/24/2026
Permit issued — Mechanical Systems
Q01360035-I1-MS
03/24/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01360035-I1
03/03/2026
Permit issued — Mechanical Systems
Q01348541-I1-MS
02/17/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01348541-I1
04/20/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedThe Sci Construction04/24/2026
DOB NOWMechanical SystemsPermit IssuedThe Sci Construction03/03/2026
BISMHISSUEDSuperior HVAC02/06/2017
BISPLISSUEDG. C. Plumbing & Heating07/24/2015
BISPLISSUEDT.m.j.plumbing and Heating03/15/1995
2 projects · most recent 09/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2026Permit IssuedThe Sci ConstructionHeating and Air Conditioning Systems
Heat / Cool
Midea MO3HX-H18B-2A 20,000 BTU · Condensing Unit ×5
MSEHU-H12B-2A 12,000 BTU · Fan Coil Indoor ×5
MSEHU-HO9B-2A 12,000 BTU · Fan Coil Indoor ×5
09/23/2026Permit IssuedThe Sci ConstructionHeating and Air Conditioning Systems
Heat / Cool
Midea MO3HX-H18B-2A 20,000 BTU · Condensing Unit ×2
MSEHU-H12B-2A 12,000 BTU · Fan Coil Indoor ×2
MSEHU-HO9B-2A 12,000 BTU · Fan Coil Indoor ×2
2 projects · most recent 08/18/2026
HVAC Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedDVM Electrical ServicesHVAC Wiring
03/23/2026CompleteDVM Electrical ServicesHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/24/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
09/24/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
09/24/2026Maintenance informationJONAR MADRIAGAenergy_progress
09/24/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
09/24/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
09/24/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
09/24/2026FinalJONAR MADRIAGAprogress
09/24/2026Mechanical SystemsJONAR MADRIAGAspecial
09/24/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
09/24/2026Heating SystemsJONAR MADRIAGAspecial
09/21/2026Heating SystemsJONAR MADRIAGAspecial
09/21/2026Mechanical SystemsJONAR MADRIAGAspecial
09/21/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
09/21/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
09/21/2026FinalJONAR MADRIAGAprogress
09/21/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
09/21/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
09/21/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
09/21/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
09/21/2026Maintenance informationJONAR MADRIAGAenergy_progress
09/21/2026Heating SystemsJONAR MADRIAGAspecial
09/21/2026Mechanical SystemsJONAR MADRIAGAspecial
09/21/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
09/21/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
09/21/2026FinalJONAR MADRIAGAprogress
Latest 25 of 40.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026Q01360035-I1Request digital key ↗
08/17/2026Q01348541-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
12/02/2016421177443Open ↗
11/21/2016421177443Open ↗
11/10/2015421177443Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
02/07/2017421177443Open ↗
08/10/2015421177443Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature28
10/04/2026Q01348541-P1Open ↗
10/04/2026Q01348541-P1Open ↗
10/04/2026Q01348541-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/04/2026Q01348541-P1Open ↗
10/04/2026Q01348541-P1Open ↗
10/04/2026Q01348541-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/04/2026Q01360035-P1Open ↗
10/04/2026Q01348541-P1Open ↗
08/29/2026Q01360035-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/02/2017421177443Open ↗
11/21/2016421177443Open ↗
07/30/2015421177443Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/30/2015421177443Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/30/2015421177443Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
10/27/2015421177443Open ↗
10/26/2015421177443Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/10/2015421177443Open ↗
07/30/2015421177443Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/04/2026Q01360035-P1Open ↗
10/04/2026Q01348541-P1Open ↗
08/29/2026Q01360035-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/30/2015421177443Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/02/2017421177443Open ↗
07/30/2015421177443Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/02/2017421177443Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/02/2017421177443Open ↗
04/20/2016421177443Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/30/2015421177443Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/02/2017421177443Open ↗
07/30/2015421177443Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/30/2015421177443Open ↗
▸BISADDITIONAL INFORMATION1
12/02/2016421177443Open ↗