← Back
Walk-up cooperative
Meadowlark Gardens
196-14 69 AVENUE · BIN 4459683
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R4Zoning
116,000 sfGross Floor Area
148Units
LL97 CoveredRent Stabilized17 Open Violations ▸
Walk-up cooperative · Owner of record: MEADOWLARK GARDENS OWNERS INC · 225,750 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Mechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 13 docs
Floor 1Under Construction4p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MORAGHAN ENGINEERING PC107/13/2026
ZARO ENGINEERING PC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE SCI CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827103/21/2026
Building Lifecycle
All (26)Filed (2)Permit Issued (1)Special Inspection (23)
07/13/2026
Filed — Alteration
HEREBY FILING EMERGENCY BRICK REPAIRS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01416361-I1
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/12/2026
Special inspection requirement — Masonry
06/12/2026
Special inspection requirement — Final
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/12/2026
Special inspection requirement — Preliminary
06/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/12/2026
Special inspection requirement — Fenestration areas
06/12/2026
Special inspection requirement — Air barrier - visual inspection
06/12/2026
Special inspection requirement — Insulation placement and R values
06/12/2026
Special inspection requirement — Fenestration air leakage
04/24/2026
Permit issued — Mechanical Systems
Q01359937-I1-MS
03/21/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01359937-I1
02/13/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Heating Systems
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Final
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
02/13/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTHE SCI CONSTRUCTION04/24/2026
1 project · most recent 03/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/21/2026Permit IssuedTHE SCI CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Midea MO3HX-H18B-2A 20,000 BTU · Condensing Unit ×2
MSEHU-H12B-2A 12,000 BTU · Fan Coil Indoor ×2
MSEHU-HO6B-2A 6,000 BTU · Fan Coil Indoor ×2
1 project · most recent 08/05/2026
HVAC Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedDVM ELECTRICAL SERVICES LHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/12/2026Tenant Protection Plan Compliance—special
06/12/2026Structural Stability – Alterations of existing buildings—special
06/12/2026Fire-Resistant Penetrations and Joints—special
06/12/2026Masonry—special
06/12/2026Final—progress
06/12/2026Energy Code Compliance Inspections—progress
06/12/2026Fire-Resistance Rated Construction—progress
06/12/2026Preliminary—progress
06/12/2026Fenestration and door U-factor and product ratings—energy_progress
06/12/2026Fenestration areas—energy_progress
06/12/2026Air barrier - visual inspection—energy_progress
06/12/2026Insulation placement and R values—energy_progress
06/12/2026Fenestration air leakage—energy_progress
02/13/2026Mechanical SystemsJONAR MADRIAGAspecial
02/13/2026Heating SystemsJONAR MADRIAGAspecial
02/13/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/13/2026FinalJONAR MADRIAGAprogress
02/13/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/13/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/13/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
02/13/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
02/13/2026Maintenance informationJONAR MADRIAGAenergy_progress
02/13/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026Q01359937-I1Request digital key ↗
08/16/2026Q01416361-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
08/26/2026Q01359937-I1Open ↗
08/26/2026Q01359937-I1Open ↗
08/26/2026Q01359937-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q01359937-I1Open ↗
08/26/2026Q01359937-I1Open ↗
08/26/2026Q01359937-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026Q01359937-I1Open ↗
08/16/2026Q01416361-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026Q01359937-I1Open ↗
08/16/2026Q01416361-I1Open ↗