← Back
BuildNYC
Walk-up cooperative
Meadowlark Gardens
196-39 73RD AVENUE · BIN 4459724
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R4Zoning
116,000 sfGross Floor Area
148Units
LL97 CoveredRent Stabilized17 Active Violations ▸
Walk-up cooperative · Owner of record: Meadowlark Gardens Owners · 225,750 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Heat pump projectUnder Construction4p · 1 filing · 16 docs
Floor 1Heat pump projectUnder Construction4p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zaro Engineering208/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Sci ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827208/10/2026
Building Lifecycle
All (3)Filed (2)Permit Issued (1)
08/10/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01364105-P1
03/20/2026
Permit issued — Mechanical Systems
Q01364105-I1-MS
03/02/2026
Filed — Alteration
INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01364105-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedThe Sci Construction03/20/2026
1 project · most recent 08/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Permit IssuedThe Sci ConstructionHeating and Air Conditioning Systems
Heat / Cool
Midea MSEHU-HO9B-2A 12,000 BTU · Fan Coil Indoor ×4
MO3HX-H27B-2A 27,000 BTU · Condensing Unit ×2
MSEHU-H12B-2A 12,000 BTU · Fan Coil Indoor ×2
1 project · most recent 03/22/2026
HVAC Wiring
FiledStatusContractorScope
03/22/2026Permit IssuedDVM Electrical ServicesHVAC Wiring
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026Permit IssuedThe Sci Construction1 scope_items
1 project · most recent 08/10/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/10/2026Permit IssuedThe Sci ConstructionTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/12/2026Mechanical SystemsJONAR MADRIAGAspecial
08/12/2026Heating SystemsJONAR MADRIAGAspecial
08/12/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
08/12/2026FinalJONAR MADRIAGAprogress
08/12/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
08/12/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
08/12/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
08/12/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
08/12/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
08/12/2026Maintenance informationJONAR MADRIAGAenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01364105-P1Request digital key ↗
08/17/2026Q01364105-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
08/25/2026Q01364105-I1Open ↗
08/25/2026Q01364105-I1Open ↗
08/25/2026Q01364105-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q01364105-I1Open ↗
08/25/2026Q01364105-I1Open ↗
08/25/2026Q01364105-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01364105-P1Open ↗
08/17/2026Q01364105-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01364105-I1Open ↗
08/17/2026Q01364105-P1Open ↗