196 BARNARD AVENUE
STATEN ISLAND · Tottenville-Charleston · BIN 5089124
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3XZoning
1,432 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,750 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
General
Floor 21p · 1 filing · 15 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEHAUL803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE412/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE403/21/2026
Building Lifecycle
All (44)Filed (4)Objection (10)Special Inspection (30)
04/08/2026
Objection resolved — Resolved
04/08/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
03/23/2026
Objection raised — Fire_Protection
03/23/2026
Objection raised — Mechanical
03/23/2026
Objection raised — Mechanical
03/23/2026
Objection raised — Structural
01/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
12/19/2025
Objection raised — Scope
12/02/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION IS FILED FOR PLUMBING WORK ONLY, IN CONJ. WITH THE PARTIAL HORIZONTAL & VERTICAL ENLARGEMENT & INTERIOR RENOVATION TO AN EXISTING ONE FAMILY, 2-1/2 STORY FRAME RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01316358-I1
12/02/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION IS FILED FOR PLUMBING WORK ONLY, IN CONJ. WITH THE PARTIAL HORIZONTAL & VERTICAL ENLARGEMENT & INTERIOR RENOVATION TO AN EXISTING ONE FAMILY, 2-1/2 STORY FRAME RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01316358-S1
11/10/2025
Special inspection requirement — Mechanical Systems
11/10/2025
Special inspection requirement — Concrete - Cast-In-Place
11/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/10/2025
Special inspection requirement — Heating Systems
11/10/2025
Special inspection requirement — Subgrade Inspections
11/10/2025
Special inspection requirement — Final
11/10/2025
Special inspection requirement — Footing and Foundation
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/10/2025
Special inspection requirement — Preliminary
11/10/2025
Special inspection requirement — Structural Wood Frame
11/10/2025
Special inspection requirement — Maintenance information
11/10/2025
Special inspection requirement — Permanent certificate
11/10/2025
Special inspection requirement — Protection of exposed foundation insulation
11/10/2025
Special inspection requirement — Air barrier — testing
11/10/2025
Special inspection requirement — Ventilation and air distribution system
11/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/10/2025
Special inspection requirement — Fenestration air leakage
11/10/2025
Special inspection requirement — Air barrier - visual inspection
11/10/2025
Special inspection requirement — Fenestration areas
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/10/2025
Special inspection requirement — Interior lighting power
11/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/10/2025
Special inspection requirement — Insulation placement and R values
06/20/2025
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01240244-I1
06/19/2025
Filed — Alteration
APPLICATION FILED FOR 12' CURB CUT ALONG BARNARD AVENUE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01240253-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDJAMES J STOUT ARCHITECT & ASSOCI07/20/2016
1 project · most recent 12/02/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
12/02/2025——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 12/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/02/2025——Gas, Water/Sanitary
1 project · most recent 12/02/2025
Wood
FiledStatusContractorScope
12/02/2025——Wood
1 project · most recent 06/20/2025
Fence
FiledStatusContractorScope
06/20/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/05/2026Subsurface Investigations (Borings/Test Pits)—special
11/10/2025Mechanical Systems—special
11/10/2025Concrete - Cast-In-Place—special
11/10/2025Exterior Insulation and Finish Systems (EIFS)—special
11/10/2025Fire-Resistant Penetrations and Joints—special
11/10/2025Heating Systems—special
11/10/2025Subgrade Inspections—special
11/10/2025Final—progress
11/10/2025Footing and Foundation—progress
11/10/2025Energy Code Compliance Inspections—progress
11/10/2025Fire-Resistance Rated Construction—progress
11/10/2025Preliminary—progress
11/10/2025Structural Wood Frame—progress
11/10/2025Maintenance information—energy_progress
11/10/2025Permanent certificate—energy_progress
11/10/2025Protection of exposed foundation insulation—energy_progress
11/10/2025Air barrier — testing —energy_progress
11/10/2025Ventilation and air distribution system—energy_progress
11/10/2025Electric vehicle service equipment requirements—energy_progress
11/10/2025HVAC-R and service water heating system controls—energy_progress
11/10/2025Fenestration and door U-factor and product ratings—energy_progress
11/10/2025Fenestration air leakage—energy_progress
11/10/2025Air barrier - visual inspection—energy_progress
11/10/2025Fenestration areas—energy_progress
11/10/2025HVAC-R and service water heating equipment—energy_progress
Latest 25 of 30.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026S01240253-I1Request digital key ↗
08/19/2026S01240244-I1Request digital key ↗
08/17/2026S01316358-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
07/19/2016540108701Open ↗
▸BISWORK PERMIT APPLICATION1
07/19/2016540108701Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/28/2025540267469Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01316358-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01316358-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01316358-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026S01240244-I1Open ↗
08/13/2026S01240253-I1Open ↗
08/13/2026S01316358-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/19/2016540108701Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/19/2016540108701Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/15/2025540267469Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/19/2016540108701Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
07/19/2016540108701Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01316358-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01316358-I1Open ↗
08/13/2026S01316358-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/19/2016540108701Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/14/2019540108701Open ↗
07/19/2016540108701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/19/2016540108701Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/14/2019540108701Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/19/2016540108701Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/27/2019540108701Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/14/2019540108701Open ↗
07/19/2016540108701Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/15/2025540267469Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01316358-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01316358-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/14/2019540108701Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/28/2025540267469Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/14/2019540108701Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/14/2019540108701Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/14/2019540108701Open ↗
07/19/2016540108701Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/19/2016540108701Open ↗
▸Other Documents6
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
08/04/2025540267469Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/04/2025540267469Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
10/27/2025540267469Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01316358-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01316358-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01316358-I1Open ↗