Over six families without stores
Lower East Side I Infill (NYCHA)
196 ELDRIDGE STREET · BIN 1077637
💬 Discuss this project
1986Year Built
4Stories
C1Building Class
C4-4AZoning
60,640 sfGross Floor Area
54Units
LL97 Covered0 Open Violations
Over six families without stores · Owner of record: NYC HOUSING AUTHORITY · 44,484 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Roof6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2707/08/2026
NEW YORK CITY HOUSING AUTHORITY607/08/2026
PARSONS CONSTRUCTION603/22/2026
NYC HOUSING AUTHORITY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1803/21/2026
PHILLIPS CONSULTING403/21/2026
NEW YORK ENGINEERING ASSOCIATES P1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HTG SERVICES, INCPlumbing707/08/2026
ARMSTRONG ROOFING CORPGeneral Contractor507/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438410/09/2025
AK CONSULTING SERVICES, I6198204/22/2025
NEW YORK ENGINEERING ASSO851505/10/2021
Building Lifecycle
All (74)Filed (20)Permit Issued (13)Signed Off (7)Violation (4)Special Inspection (30)
11/12/2025
Signed off — Alteration
full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof
M08020301-I1
10/21/2025
Special inspection requirement — Post-installed Anchors
JAMES WILSON
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
10/21/2025
Special inspection requirement — Insulation placement and R values
Ronnette Riley
10/21/2025
Special inspection requirement — Final
JAMES WILSON
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
10/09/2025
Filed — Alteration
full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof
M08020301-P3
10/03/2025
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK AT 61 STANTON STREET, MANHATTAN
M01214195-I1
09/30/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 61 STANTON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01132499-I1
09/30/2025
Signed off — Alteration
M01132868-I1
09/12/2025
Filed — Alteration
full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof
M08020301-P2
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
09/09/2025
Special inspection requirement — Final
JAMES WILSON
09/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES WILSON
09/09/2025
Special inspection requirement — Insulation placement and R values
Ronnette Riley
09/09/2025
Special inspection requirement — Post-installed Anchors
JAMES WILSON
06/30/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 61 STANTON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01132499-P3
04/29/2025
Permit issued — Suspended Scaffold
M01214195-I1-SC
04/22/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK AT 61 STANTON STREET, MANHATTAN
M01214195-I1
04/22/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
04/22/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
02/17/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 61 STANTON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01132499-P2
02/14/2025
Filed — Alteration
M01132868-P2
02/13/2025
Permit issued — Suspended Scaffold
M01179003-I1-SC
02/10/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK AT 61 STANTON STREET, MANHATTAN
M01179003-I1
02/10/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
02/10/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
01/29/2025
Permit issued — General Construction
M08020301-I1-GC
01/09/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 61 STANTON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01132499-P1
01/09/2025
Filed — Alteration
M01132868-P1
12/10/2024
Permit issued — Construction Fence
M01132868-I1-FN
12/10/2024
Permit issued — Sidewalk Shed
M01132499-I1-SH
12/09/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 61 STANTON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01132499-I1
12/09/2024
Filed — Alteration
M01132868-I1
11/06/2024
Filed — Alteration
full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof
M08020301-P1
10/25/2024
Special inspection requirement — Insulation placement and R values
Ronnette Riley
10/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
10/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
10/25/2024
Special inspection requirement — Post-installed Anchors
JAMES WILSON
10/25/2024
Special inspection requirement — Final
10/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
01/12/2023
Filed — Alteration
full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof
M08020301-I1
02/17/2022
Signed off — Alteration
REPLACE MODULAR GAS BOILER (6 MODULES) WITH (1) GAS BOILER. SECOND BOILER FILED UNDER A SEPARATE "BE" APPLICATION.
M00327153-I1
02/09/2022
Signed off — Alteration
REPLACE MODULAR GAS BOILER (6 MODULES) WITH (1) GAS BOILER. SECOND BOILER FILED UNDER A SEPARATE "BE" APPLICATION.
M00327153-S1
07/12/2021
Signed off — Alteration
REPLACE MODULAR GAS BOILER (6 MODULES) WITH (1) GAS BOILER. SECOND BOILER FILED UNDER A SEPARATE "BE" APPLICATION.
M00327153-S3
05/13/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
05/13/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
05/13/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
05/13/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
05/10/2021
Filed — Alteration
REPLACE MODULAR GAS BOILER (6 MODULES) WITH (1) GAS BOILER. SECOND BOILER FILED UNDER A SEPARATE "BE" APPLICATION.
M00327153-P4
05/06/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
05/06/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
05/06/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
05/06/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
05/05/2021
Filed — Alteration
REPLACE MODULAR GAS BOILER (6 MODULES) WITH (1) GAS BOILER. SECOND BOILER FILED UNDER A SEPARATE "BE" APPLICATION.
M00327153-P3
02/11/2021
Permit issued — Boiler Equipment
M00327153-S3-BE
12/17/2020
Permit issued — Boiler Equipment
M00327153-S1-BE
12/17/2020
Permit issued — Plumbing
M00327153-I1-PL
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offMC SUPERSTRUCTURE INC04/29/2025
DOB NOWSuspended ScaffoldPermit IssuedMC SUPERSTRUCTURE INC02/13/2025
DOB NOWGeneral ConstructionSigned-offARMSTRONG ROOFING CORP01/29/2025
DOB NOWConstruction FenceSigned-offARMSTRONG ROOFING CORP12/10/2024
DOB NOWSidewalk ShedSigned-offARMSTRONG ROOFING CORP12/10/2024
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP02/11/2021
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP12/17/2020
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP12/17/2020
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP05/28/2020
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP05/28/2020
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC04/22/2020
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP03/24/2020
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP03/13/2020
3 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteALKEM ELECTRICAL CORPGeneral Wiring
01/23/2025CompleteALKEM ELECTRICAL CORP—
04/21/2020Permit IssuedRICHARD NEU—
1 project · most recent 02/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/10/2025Permit IssuedTRI BOROUGH SCFDNG & HSTSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/21/2025Post-installed AnchorsJAMES WILSONspecial
10/21/2025Energy Code Compliance InspectionsJAMES WILSONprogress
10/21/2025Insulation placement and R valuesRonnette Rileyenergy_progress
10/21/2025FinalJAMES WILSONprogress
10/21/2025Tenant Protection Plan ComplianceJAMES WILSONspecial
09/09/2025Tenant Protection Plan Compliance—special
09/09/2025Energy Code Compliance InspectionsJAMES WILSONprogress
09/09/2025FinalJAMES WILSONprogress
09/09/2025Fire-Resistance Rated ConstructionJAMES WILSONprogress
09/09/2025Insulation placement and R valuesRonnette Rileyenergy_progress
09/09/2025Post-installed AnchorsJAMES WILSONspecial
04/22/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
04/22/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
02/10/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
02/10/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
10/25/2024Insulation placement and R valuesRonnette Rileyenergy_progress
10/25/2024Fire-Resistance Rated Construction—progress
10/25/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
10/25/2024Energy Code Compliance InspectionsJAMES WILSONprogress
10/25/2024Post-installed AnchorsJAMES WILSONspecial
10/25/2024Final—progress
10/25/2024Tenant Protection Plan ComplianceJAMES WILSONspecial
05/13/2021Heating SystemsLOUIS ARENAspecial
05/13/2021Maintenance informationLOUIS ARENAenergy_progress
05/13/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
Latest 25 of 31.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch13
09/01/2026M08020301-P2Request digital key ↗
09/01/2026M08020301-I1Request digital key ↗
09/01/2026M08020301-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment5
09/05/2026M00327153-S3Request digital key ↗
09/05/2026M00327153-S1Request digital key ↗
08/15/2026M00327153-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00342906-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00327153-I1Request digital key ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00327153-S1Open ↗
09/05/2026M00327153-P2Open ↗
09/05/2026M00327153-S3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026M00327153-S3Open ↗
09/23/2026M00327153-S3Open ↗
09/23/2026M00327153-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M00327153-S1Open ↗
09/23/2026M00327153-S3Open ↗
09/01/2026M08020301-I1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan7
09/05/2026M00327153-S3Open ↗
09/05/2026M00327153-S1Open ↗
09/05/2026M00327153-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00327153-S1Open ↗
09/05/2026M00327153-P2Open ↗
09/05/2026M00327153-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M08020301-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00327153-S3Open ↗
08/13/2026M00327153-S1Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
09/05/2026M00327153-S3Open ↗
09/05/2026M00327153-S1Open ↗
09/05/2026M00327153-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
09/05/2026M00327153-S1Open ↗
09/05/2026M00327153-P2Open ↗
08/13/2026M00327153-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M08020301-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M08020301-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026M08020301-P3Open ↗
08/13/2026M08020301-I1Open ↗
08/13/2026M08020301-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01179003-I1Open ↗
08/13/2026M01214195-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01179003-I1Open ↗
08/13/2026M01214195-I1Open ↗