← Back
Multi-story retail building (2+)
196 MOFFAT ST
BROOKLYN · BIN 3080159
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
M1-1Zoning
1,910 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: GRAPE STREET LLC · 955 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES506/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8065205/12/2022
Building Lifecycle
All (53)Filed (5)Permit Issued (2)Signed Off (2)Violation (9)Inspection (7)Special Inspection (28)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/19/2024
Signed off — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00600019-I1
11/28/2023
Violation issued (HPD, open)
I
07/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/13/2022
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00599997-I1
06/10/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
06/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
06/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
06/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
06/03/2022
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00600019-P2
06/01/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
06/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
06/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
05/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/20/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/13/2022
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00600019-P1
05/13/2022
Special inspection requirement — Fenestration areas
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Air barrier - visual inspection
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Air barrier — testing
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
05/13/2022
Special inspection requirement — Fenestration air leakage
CHI WAI CHUNG
05/12/2022
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00599997-P1
05/12/2022
Special inspection requirement — Air barrier — testing
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Fenestration air leakage
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Fenestration areas
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
05/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
05/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
05/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Air barrier - visual inspection
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
05/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHI WAI CHUNG
04/13/2022
Permit issued — Plumbing
B00600019-I1-PL
11/23/2021
Permit issued — General Construction
B00599997-I1-GC
11/02/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00600019-I1
11/02/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00599997-I1
01/13/2020
Violation issued (HPD, closed)
B
01/13/2020
Violation issued (HPD, closed)
B
01/13/2020
Violation issued (HPD, closed)
B
01/13/2020
Violation issued (HPD, closed)
B
01/13/2020
Violation issued (HPD, closed)
B
01/13/2020
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC04/13/2022
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC11/23/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/10/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/06/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
06/06/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
06/06/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
06/06/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
06/01/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
06/01/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
06/01/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
06/01/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
05/13/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/13/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
05/13/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
05/13/2022Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
05/13/2022Air barrier — testing CHI WAI CHUNGenergy_progress
05/13/2022Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
05/13/2022Interior lighting powerCHI WAI CHUNGenergy_progress
05/13/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/12/2022Air barrier — testing CHI WAI CHUNGenergy_progress
05/12/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/12/2022Interior lighting powerCHI WAI CHUNGenergy_progress
05/12/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/12/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
05/12/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/12/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
05/12/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
05/12/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
Latest 25 of 28.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00600019-I1Request digital key ↗
08/31/2026B00600019-P2Request digital key ↗
08/31/2026B00600019-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature12
09/10/2026B00599997-P1Open ↗
09/10/2026B00599997-P1Open ↗
09/10/2026B00599997-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00599997-I1Open ↗
08/13/2026B00600019-I1Open ↗
08/13/2026B00600019-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/10/2026B00599997-P1Open ↗
08/24/2026B00599997-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00599997-I1Open ↗
08/13/2026B00600019-I1Open ↗
08/13/2026B00600019-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/02/2015320917861Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00599997-I1Open ↗
08/13/2026B00600019-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/02/2015320917861Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/02/2015320917861Open ↗
▸BISSOIL REPORT1
07/02/2015320917861Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
01/27/2015320917861Open ↗