← Back
Two family brick
196 QUENTIN ROAD
BROOKLYN · BIN 3176854
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R7AZoning
2,576 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: LCK GROUP LLC · 2,000 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN604/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/21/2025$1.7M—— → —$668/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP210/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CROSSFIELD PLUMBING HEATING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758210/30/2025
Building Lifecycle
All (20)Filed (2)Permit Issued (1)Signed Off (1)Violation (3)Inspection (3)Special Inspection (10)
01/06/2026
Signed off — Alteration
INSTALL BOILER AND H.W.H. FOR 2 FAMILY DWELLING ON CELLAR FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01269314-I1
11/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
10/30/2025
Filed — Alteration
INSTALL BOILER AND H.W.H. FOR 2 FAMILY DWELLING ON CELLAR FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01269314-P1
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
10/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
10/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2025
Permit issued — Plumbing
B01269314-I1-PL
08/12/2025
Filed — Alteration
INSTALL BOILER AND H.W.H. FOR 2 FAMILY DWELLING ON CELLAR FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01269314-I1
09/01/2020
Violation issued (ECB, closed)
Construction
08/19/2011
Violation issued (ECB, closed)
Construction
08/19/2011
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/13/2025
BISPLISSUEDTEC PLUMBING CORP08/13/2012
BISOTISSUEDTEC PLUMBING CORP08/13/2012
2 projects · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025CompleteINTELOGIC ELECTRIC, INC.1 meters, 1 new_meters
05/21/2025CompleteTRANSFORM ELECTL CONTRS I—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/03/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
11/03/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/03/2025Energy Code Compliance InspectionsEric Sunprogress
11/03/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/03/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
10/30/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/30/2025Energy Code Compliance InspectionsEric Sunprogress
10/30/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
10/30/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
10/30/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01269314-I1Request digital key ↗
08/21/2026B01269314-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/27/2012320381831Open ↗
09/19/2012320381831Open ↗
10/25/2011320381831Open ↗
▸BISWORK PERMIT APPLICATION2
08/14/2012320381831Open ↗
08/14/2012320381831Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01269314-I1Open ↗
09/01/2026B01269314-I1Open ↗
09/01/2026B01269314-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/28/2013320381831Open ↗
10/27/2011320381831Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01269314-I1Open ↗
08/21/2026B01269314-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01269314-I1Open ↗
09/01/2026B01269314-P1Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
02/12/2013320381831Open ↗
01/30/2013320381831Open ↗
10/17/2012320381831Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/27/2012320381831Open ↗
09/13/2012320381831Open ↗
10/25/2011320381831Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/14/2012320381831Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/25/2011320381831Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01269314-I1Open ↗
08/21/2026B01269314-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/25/2011320381831Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/28/2013320381831Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/28/2013320381831Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/28/2013320381831Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/25/2011320381831Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/28/2013320381831Open ↗
10/25/2011320381831Open ↗