← Back
Elevator apt, fireproof without stores
196 STANHOPE STREET
BROOKLYN · BIN 3074452
💬 Discuss this project
2024Year Built
5Stories
D3Building Class
C4-3Zoning
16,542 sfGross Floor Area
10Units
2 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: STANHOPE REAL ESTATE DEVELOPMENT LLC · 2,000 sf lot · 8.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivil
Roof48p · 3 filings · 20 docs
Floor 536p · 1 filing · 20 docs
Floor 438p · 1 filing · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 241p · 2 filings · 20 docs
Floor 139p · 2 filings · 20 docs
Cellar36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5615 VAN CLEEF REAL ESTATE5307/08/2026
STANHOPE REAL ESTATE DEVELOPMENT403/22/2026
STONEHILL CONSTRUCTION SE403/22/2026
CONSTR SERV INC STONEHILL103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2021$1.2M—Private party → 198 STANHOPE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGT ARCHITECTURE P.C.602/20/2026
RIGID STRUCTURAL DESIGN, LLC405/22/2025
FANG ARCHITECT202/19/2025
DAVID REYHAN PE206/10/2024
TIMES BUILDINGS ENGINEERING SERVICE312/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEIYUN CHEN303/21/2026
FANG ARCHITECT1003/21/2026
Rigid Structural Design, LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STONEHILL CONSTR SERV INCGeneral Contractor1907/08/2026
PACIFIC HOLDING ENTERPR*General Contractor204/09/2026
STREAM PLUMBING INCPlumbing207/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
RIGHTWAY ELECTRICAL INCElectrical103/22/2026
SENTA SEWER SERVICE LLCPlumbing107/08/2026
LIS PIPING SOLUTION INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC77781202/20/2026
TIMES BUILDINGS ENGINEERI710110/30/2023
Building Lifecycle
All (180)Filed (17)Permit Issued (17)Signed Off (8)Violation (13)Inspection (15)Objection (80)Special Inspection (30)
03/30/2026
Signed off — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-S7
03/12/2026
Signed off — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-S5
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2026
Filed — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-P5
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
02/20/2026
Special inspection requirement — Sprinkler Systems
XIONGCAI GU
02/20/2026
Special inspection requirement — Sprinkler Systems
XIONGCAI GU
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
02/09/2026
Signed off — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-S8
02/09/2026
Special inspection requirement — Mechanical Systems
XIONGCAI GU
02/09/2026
Special inspection requirement — Maintenance information
XIONGCAI GU
02/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
02/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
02/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
02/09/2026
Special inspection requirement — Shutoff dampers
XIONGCAI GU
02/09/2026
Special inspection requirement — Heating Systems
XIONGCAI GU
02/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
02/09/2026
Special inspection requirement — Preliminary
XIONGCAI GU
02/09/2026
Special inspection requirement — Final
DENIS PORTAEV
02/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/05/2026
Filed — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-P4
02/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2026
Special inspection requirement — Preliminary
XIONGCAI GU
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
02/03/2026
Special inspection requirement — Maintenance information
XIONGCAI GU
02/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
02/03/2026
Special inspection requirement — Shutoff dampers
XIONGCAI GU
02/03/2026
Special inspection requirement — Final
DENIS PORTAEV
02/03/2026
Special inspection requirement — Mechanical Systems
XIONGCAI GU
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
02/03/2026
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
02/03/2026
Special inspection requirement — Heating Systems
XIONGCAI GU
02/02/2026
Filed — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-P3
01/29/2026
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01187663-I1
01/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/09/2026
Signed off — New Building
PROPOSED PLUMBING AND FIRE SPRINKLER WORK FOR A NEW 5-STORY, MIXED-USE BUILDING.
B00920640-S6
01/08/2026
Permit issued — Mechanical Systems
B00920640-S8-MS
01/08/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Signed off — Alteration
file temporary construction fence.
B00954093-I1
11/11/2025
Permit issued — Construction Fence
B00954093-I1-FN
11/04/2025
Signed off — Alteration
Installation of a temporarily supported scaffold, heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01127965-I1
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Other
10/28/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSTONEHILL CONSTR SERV INC01/08/2026
DOB NOWConstruction FenceSigned-offSTONEHILL CONSTR SERV INC11/11/2025
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC08/25/2025
DOB NOWSprinklersSigned-offLIS PIPING SOLUTION INC04/22/2025
DOB NOWSuspended ScaffoldSigned-offSTONEHILL CONSTR SERV INC03/19/2025
DOB NOWGeneral ConstructionPermit IssuedSTONEHILL CONSTR SERV INC03/14/2025
DOB NOWFoundationSigned-offSTONEHILL CONSTR SERV INC03/14/2025
DOB NOWSprinklersSigned-offSENTA SEWER SERVICE LLC12/05/2024
DOB NOWConstruction FenceSigned-offSTONEHILL CONSTR SERV INC11/01/2024
DOB NOWSidewalk ShedSigned-offPACIFIC HOLDING ENTERPR*10/30/2024
DOB NOWSidewalk ShedSigned-offPACIFIC HOLDING ENTERPR*10/30/2024
DOB NOWSprinklersSigned-offSTREAM PLUMBING INC09/11/2024
DOB NOWSupport of ExcavationSigned-offSTONEHILL CONSTR SERV INC07/11/2024
DOB NOWEarth WorkSigned-offSTONEHILL CONSTR SERV INC07/08/2024
DOB NOWGeneral ConstructionPermit IssuedSTONEHILL CONSTR SERV INC05/28/2024
DOB NOWFull DemolitionSigned-offSTONEHILL CONSTR SERV INC04/11/2024
DOB NOWConstruction FenceSigned-offSTONEHILL CONSTR SERV INC11/15/2023
1 project · most recent 02/20/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/20/2026Signed-offSTONEHILL CONSTR SERV INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-HPR36M-230VO 37,000 BTU · Condensing Unit ×45
CH-HPR28M-230VO 28,000 BTU · Condensing Unit ×15
CH-ES09-230VO 10,000 BTU · Condensing Unit ×5
CH-HPR12-230VO 12,000 BTU · Condensing Unit ×5
CH-HPR48M-230VO 49,000 BTU · Condensing Unit ×5
Heating
Airmaster SKU71553 1,500 kW ×60
Ventilation
S&P Usa Ventilation Systems TRCeN800RTH-230-1P 1,100 CFM · Erv ×4
1 project · most recent 02/20/2026
Sprinkler System
FiledStatusContractorScope
02/20/2026Signed-offLIS PIPING SOLUTION INCSprinkler System
1 project · most recent 02/20/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/20/2026Signed-offSTREAM PLUMBING INCStorm, Water/Sanitary
3 projects · most recent 12/09/2024
General Wiring
FiledStatusContractorScope
12/09/2024CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
12/06/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
11/06/2024CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 02/20/2026
Steel Masonry
FiledStatusContractorScope
02/20/2026Signed-offSTONEHILL CONSTR SERV INCSteel, Masonry
1 project · most recent 02/20/2026
Earthwork
FiledStatusContractorScope
02/20/2026Signed-offSTONEHILL CONSTR SERV INCEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/08/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/18/2024Pass-Final House ConnectionPassView ↗
12/10/2024Fail-Final House ConnectionFailView ↗
10/11/2024Pass-Final PL - UndergroundPassView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
02/20/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
02/20/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/20/2026Sprinkler SystemsXIONGCAI GUspecial
02/20/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
02/20/2026Sprinkler SystemsXIONGCAI GUspecial
02/20/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/09/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/09/2026Mechanical SystemsXIONGCAI GUspecial
02/09/2026Heating SystemsXIONGCAI GUspecial
02/09/2026PreliminaryXIONGCAI GUprogress
02/09/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
02/09/2026FinalDENIS PORTAEVprogress
02/09/2026Fire-Resistance Rated ConstructionXIONGCAI GUprogress
02/09/2026Shutoff dampersXIONGCAI GUenergy_progress
02/09/2026HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
02/09/2026HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
02/09/2026HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
02/09/2026Maintenance informationXIONGCAI GUenergy_progress
02/03/2026Maintenance informationXIONGCAI GUenergy_progress
02/03/2026Heating SystemsXIONGCAI GUspecial
02/03/2026Mechanical SystemsXIONGCAI GUspecial
02/03/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
02/03/2026FinalDENIS PORTAEVprogress
02/03/2026Fire-Resistance Rated ConstructionXIONGCAI GUprogress
02/03/2026PreliminaryXIONGCAI GUprogress
Latest 25 of 88.
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026B00954093-I1Request digital key ↗
08/23/2026B01127965-I1Request digital key ↗
08/23/2026B01127965-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
04/28/2025340917583Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00920640-I1Open ↗
08/13/2026B00920640-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00920640-P1Open ↗
08/13/2026B00920640-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/28/2025340917583Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00920640-I1Open ↗
▸Seals & Professional Certifications109
▸DOB NOWProgress Inspector Seal & Signature58
09/27/2026B00920640-P5Open ↗
09/02/2026B00920640-S7Open ↗
08/31/2026B00920640-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/27/2026B00920640-P5Open ↗
09/27/2026B00920640-P5Open ↗
09/02/2026B00920640-S7Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026B00930940-P1Open ↗
08/26/2026B00930940-I1Open ↗
08/22/2026B01187663-P1Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/25/2025340917583Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/25/2025340917583Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00920640-I1Open ↗
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00930940-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00930940-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00930940-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00930940-I1Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/15/2026B00920640-I1Open ↗
08/14/2026B00920640-P1Open ↗
08/14/2026B00920640-S5Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/28/2025340917583Open ↗
▸BISSTREET TREE CHECKLIST1
04/28/2025340917583Open ↗
▸BISSTREET TREE SIGNOFF1
01/05/2026340917583Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00920640-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00930940-P1Open ↗
08/15/2026B00930940-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00930940-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026B00920640-S7Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00920640-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00920640-S5Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/25/2025340917583Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification4
08/15/2026B00920640-I1Open ↗
08/15/2026B00930940-P1Open ↗
08/15/2026B00930940-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-I1Open ↗
08/13/2026B00920640-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00920640-P1Open ↗
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B01187663-I1Open ↗
08/13/2026B01187663-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00920640-S5Open ↗
08/13/2026B00920640-S6Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01187663-I1Open ↗
08/13/2026B01187663-P1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B00930940-P1Open ↗
08/13/2026B00930940-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/28/2025340917583Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00930940-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00920640-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00930940-I1Open ↗