Two stories - detached, small or mid-size
WILD AVENUE
STATEN ISLAND · BIN 5176984
💬 Discuss this project
2024Year Built
2Stories
A1Building Class
R3AZoning
1,814 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,739 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof1p · 1 filing · 5 docs
Floor 216p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
1 job · most recent 12/17/2024
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
12/17/2024Signed-offK.M.D MECHANICAL 1443 LLCPlumbing-Sprinkler, Storm, Water/Sanitary
3 jobs · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026CompleteJSP ELECTL CNTNG CORP—
03/17/2025CompleteJSP ELECTL CNTNG CORP—
08/26/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 job · most recent 12/17/2024
Wood
FiledStatusContractorScope
12/17/2024Signed-offMP REALTY HOLDING CORPWood
1 job · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026Permit IssuedJ.B.I. CONSTRUCTION GROUP33 panels, 14.19 kw, 210 roof_area_sqft
Building Lifecycle
All (57)Filed (7)Permit Issued (6)Signed Off (3)Violation (1)Inspection (10)Special Inspection (30)
07/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2026
Permit issued — Solar
S01411455-I1-SL
06/05/2026
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01411455-I1
06/05/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
06/03/2026
Special inspection requirement — Final
TOM PETERSEN
04/30/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01209931-I1
04/25/2025
Permit issued — Solar
S01209931-I1-SL
04/22/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01209931-I1
04/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/12/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
04/12/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
04/12/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
04/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/26/2025
Signed off — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-S1
01/16/2025
Signed off — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-S2
01/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Metering
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM MONTAGUE
12/23/2024
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
12/17/2024
Filed — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-P2
12/17/2024
Filed — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-P1
12/11/2024
Permit issued — Curb Cut
S01023806-S2-CC
11/13/2024
Filed — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-S2
09/03/2024
Violation issued (ECB, closed)
Unknown
07/18/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/12/2024
Permit issued — Plumbing
S01023806-S1-PL
06/26/2024
Permit issued — Structural
S01023806-I1-FO-EA
06/26/2024
Permit issued — Foundation
S01023806-I1-GC-CX
06/03/2024
Filed — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-S1
04/03/2024
Filed — New Building
TENTATIVE LOT: 7. CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01023806-I1
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC106/05/2026
ETRECTE LLC104/22/2025
ROGERS CALVANICO GROUP PLLC512/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP403/21/2026
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor307/08/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor207/05/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854106/05/2026
ETRECTE LLC8116104/22/2025
SRA PLANNING & EXPEDITING5677412/17/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedJ.B.I. CONSTRUCTION GROUP06/11/2026
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP04/25/2025
DOB NOWCurb CutSigned-offMP REALTY HOLDING CORP12/11/2024
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC07/12/2024
DOB NOWStructuralSigned-offMP REALTY HOLDING CORP06/26/2024
DOB NOWFoundationPermit IssuedMP REALTY HOLDING CORP06/26/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/18/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
06/05/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
06/03/2026FinalTOM PETERSENprogress
06/03/2026Energy Code Compliance InspectionsTOM PETERSENprogress
06/03/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
06/03/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
04/12/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
04/12/2025FinalVYACHESLAV NECHAYEVprogress
04/12/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
04/12/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/12/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
12/23/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
12/23/2024MeteringWILLIAM MONTAGUEenergy_progress
12/23/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
12/23/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
12/23/2024Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
12/23/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
12/23/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/23/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
12/23/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
12/23/2024HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
12/23/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
12/23/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
12/23/2024Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
12/23/2024Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
12/23/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
Latest 25 of 66.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026S01023806-S2Request digital key ↗
08/20/2026S01023806-P2Request digital key ↗
08/20/2026S01023806-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01023806-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026S01023806-I1Open ↗
09/01/2026S01023806-I1Open ↗
09/01/2026S01023806-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S01023806-I1Open ↗
09/01/2026S01023806-I1Open ↗
08/28/2026S01023806-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026S01023806-P2Open ↗
08/20/2026S01023806-P1Open ↗
08/20/2026S01023806-S2Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S01023806-I1Open ↗
08/13/2026S01023806-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01023806-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01023806-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01023806-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01023806-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01209931-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01023806-P2Open ↗
08/13/2026S01023806-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01023806-P2Open ↗
08/20/2026S01023806-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01023806-I1Open ↗