← Back
Two family frame
1960 71 STREET
BROOKLYN · Bensonhurst · BIN 3157995
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R5Zoning
2,480 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,417 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2021$999K—— → —$403/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.510/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK STANDARD MECH CORPPlumbing207/08/2026
ST SAFETY CONS. INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613210/19/2022
Building Lifecycle
All (67)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (5)Objection (36)Special Inspection (15)
10/31/2022
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00605410. CAP & REMOVE EXISTING PLUMBING FIXTURES. INSTALL NEW BOILER, HWH, WASHER, DRYER, KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605417-I1
10/31/2022
Signed off — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILIES HOUSE. NEW PARTITION, DOOR & REPLACE STAIRCASE WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB#: B00605417. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605410-I1
10/26/2022
Special inspection requirement — Maintenance information
Fran Huang
10/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
10/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
10/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
10/25/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00605410. CAP & REMOVE EXISTING PLUMBING FIXTURES. INSTALL NEW BOILER, HWH, WASHER, DRYER, KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605417-P2
10/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
10/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
10/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
10/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
10/25/2022
Special inspection requirement — Maintenance information
Fran Huang
10/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2022
Objection raised — Energy
10/21/2022
Objection resolved — Addressed
10/21/2022
Objection raised — Zoning
10/21/2022
Objection resolved — Addressed
10/21/2022
Objection raised — Other
10/21/2022
Objection resolved — Addressed
10/19/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00605410. CAP & REMOVE EXISTING PLUMBING FIXTURES. INSTALL NEW BOILER, HWH, WASHER, DRYER, KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605417-P1
10/19/2022
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILIES HOUSE. NEW PARTITION, DOOR & REPLACE STAIRCASE WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB#: B00605417. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605410-P1
10/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
10/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
10/18/2022
Special inspection requirement — Maintenance information
Fran Huang
10/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
10/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
10/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2022
Permit issued — Plumbing
B00605417-I1-PL
04/15/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/26/2022
Violation issued (ECB, closed)
Construction
01/06/2022
Permit issued — General Construction
B00605410-I1-GC
12/16/2021
Permit issued — Plumbing
B00605417-I1-PL
12/13/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00605410. CAP & REMOVE EXISTING PLUMBING FIXTURES. INSTALL NEW BOILER, HWH, WASHER, DRYER, KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00605417-I1
11/03/2021
Objection raised — Other
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Energy
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Other
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Admin
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Fire_Protection
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Other
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Fire_Protection
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Zoning
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Inspections
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Energy
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Cost
11/03/2021
Objection resolved — Addressed
11/03/2021
Objection raised — Energy
11/03/2021
Objection resolved — Addressed
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP09/29/2022
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC01/06/2022
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP12/16/2021
1 project · most recent 09/15/2021
FiledStatusContractorScope
09/15/2021CompleteA.C. MORGAN ELECTRIC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/26/2022Maintenance informationFran Huangenergy_progress
10/26/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
10/26/2022Energy Code Compliance InspectionsFran Huangprogress
10/26/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
10/26/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
10/25/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
10/25/2022Energy Code Compliance InspectionsFran Huangprogress
10/25/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
10/25/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
10/25/2022Maintenance informationFran Huangenergy_progress
10/18/2022Energy Code Compliance InspectionsFran Huangprogress
10/18/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
10/18/2022Maintenance informationFran Huangenergy_progress
10/18/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
10/18/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00605417-P1Request digital key ↗
08/31/2026B00605417-P2Request digital key ↗
08/31/2026B00605417-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B00605417-I1Open ↗
08/13/2026B00605417-P1Open ↗
08/13/2026B00605417-P2Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00605417-I1Open ↗
09/01/2026B00605417-I1Open ↗
09/01/2026B00605417-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00605417-P2Open ↗
08/13/2026B00605417-P1Open ↗
08/13/2026B00605410-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00605417-P1Open ↗
08/13/2026B00605417-I1Open ↗
08/13/2026B00605410-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00605417-I1Open ↗
08/13/2026B00605410-I1Open ↗