← Back
BuildNYC
Walk-up cooperative
1961 65TH STREET
BROOKLYN · Bensonhurst · BIN 3133604
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R5Zoning
18,920 sfGross Floor Area
21Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Shefa Estates Owners · 5,500 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLocalized parapet rehabilitation1p · 1 filing · 3 docs
Floor 3Unit 3BUnder Construction2p · 1 filing · 5 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shefa Estates Owners203/22/2026
Prespective General Construction110/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mumtaz Enterprises109/13/2026
Eoc-NY103/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MMSR Consulting Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Abanno Waterproofingspecialty_contractor203/21/2026
Perspective General ConstructionGeneral Contractor109/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mumtaz Enterprises9459109/13/2026
Ceylan Design and Consulting8422103/13/2025
Eoc-NY6548103/13/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (2)Signed Off (1)Violation (2)Special Inspection (2)
09/22/2026
Permit issued — General Construction
B01412598-I1-GC
09/13/2026
Filed — Alteration
APPLICATION FILE TO 1.INTERIOR RENOVATION EXIST. APARTMENT AS REMOVE PARTITIONS (NON- BEARING WALL), INTERIOR COSMETIC RENOVATION AT 3rd FLOOR APARTMENT# 3B AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01412598-I1
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
06/04/2026
Special inspection requirement — Final
Mumtaz Hussain
04/22/2025
Signed off — Alteration
B01186865-I1
03/25/2025
Permit issued — General Construction
B01186865-I1-GC
03/13/2025
Filed — Alteration
B01186865-I1
06/06/2014
Violation issued (HPD, closed)
B
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPerspective General Construction09/22/2026
DOB NOWGeneral ConstructionSigned-offAbanno Waterproofing03/25/2025
1 project · most recent 02/02/2018
General Wiring
FiledStatusContractorScope
02/02/2018Permit IssuedMartin DorkinGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
06/04/2026FinalMumtaz Hussainprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/04/2026B01412598-I1Request digital key ↗
08/22/2026B01186865-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/23/2026B01412598-I1Open ↗
08/22/2026B01186865-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/23/2026B01412598-I1Open ↗
08/22/2026B01186865-I1Open ↗